S/0795/18/RM Cambridge Sport Lakes between Milton and Waterbeach

Please sign in to vote.

Added by Matthew

Massive new site connecting Waterbeach and Milton along the west side of the railway. Includes a navigable tunnel under the railway connecting to the River Cam with a new bridge to maintain the existing towpath. Seems to have big implications for the Waterbeach Greenway option along the west side of the railway in addition to everything else.

1.1.1 Cambridge Sport Lakes Trust (a registered charity) has been established to construct, maintain and operate a 95.1 ha 220-acre lake, country park, and Sports Centre close to the centre of Cambridge. The sports centre created from this vision, Cambridge Sport Lakes is intended to be one of the country's largest purpose-built sports facilities and competition venues for rowing, triathlon and cycling.
1.1.2 The aim is to create a multi-sport facility designed for the teaching and practice of rowing,
canoeing, triathlon, cycling and other sports from Community/Club level up to Olympic level. The Lakes will offer 100 acres of wooded parkland and 10 miles of bank habitat for the public to enjoy. It will be a place where hundreds can experience a sense of physical wellbeing on a daily basis through the pursuit of outdoor recreations.
9.2.1 Fen Road at Milton is the only public highway that crosses the proposed site. This road runs east from the village centre of Milton and terminates at the towing path on the River Cam.
9.4.1 Fen Road will cross the Training Lake on a new bridge with pedestrian and cycle access routes formed to connect Fen Road to the new towpaths on each side of the Lake. It will connect Milton village with the site.
9.4.2 Fen Rivers Way (the towpath) will cross The Cut on a new bridge, the impact of which will be the requirement for gentle approach ramps on each side. It will connect to the new towpaths on each side of The Cut and provide public access into the site from the south.
9.7.1 There will be considerable increases in public access for foot and bicycle traffic in the south, via new footways that will connect to the Fen Rivers Way (River Cam towing path), Milton Country Park and with Fen Road at Milton. At the north, they will connect into the village of Waterbeach at Cardyke Road, thus providing a north-south linkage with Milton. A designated cycleway will similarly link the park south to the Fen Rivers Way and has the potential to connect to the new Jane Coston Cycle Bridge over the A14 via Fen Road or Milton Country Park. At the north, the cycleway can connect into Cardyke Road at Waterbeach. This will add an important link in the Cambridge to Ely cycleway which is being developed by Sustrans.

There is also on-site cycle parking in a covered shelter to be examined.

...

Application for approval of all reserved matters referred to in Conditions 1 and 5 of planning permission S/0032/06/F for the change of use of land to create a multi-sport park, construction of lakes with water storage, canal, new and changed roads, cycling and BMX tracks, Bridges (3), engineering operations, embankments and landscaping and outline permission to construct a sports centre, boathouse, finish line towers (2), warden accommodation (2) and amenity blocks (3).

Land adjacent to Milton and between Milton and Waterbeach, Cambs, CB25 9NJ

http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0795/18/RM

South Cambridgeshire

Application reference : S/0795/18/RM

http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0795/18/RM

Location

Issues nearby
Back to top