C/5001/18/CC Extension of Trumpington P&R plus cycle links / new cycle shelters
SUBDOC0_2018_04_30_Extension_Works_Cyclist_Route_P_5020069_HW_SK_001_A.pdf
Very questionable cycle route that meanders around the entire P&R.
SUBDOC0_2018_04_30_Covered_Cycle_Parking_Elevations.pdf
800mm spacing between Sheffield stands. Unclear aisle widths.
SUBDOC0_2018_04_30_Access_from_Trump_Meadows_Developm_Kerbs_&_Footways.pdf
Poorly placed bollards on curved section of path.
...
Operation of existing Park and Ride site on 24 hr basis together with a proposed extension to accommodate 279 car parking spaces ( including disabled parking bays ); additional bus and coach stops and layover area; reconfiguration of existing car parking and site entrance; provision of pedestrian and cycle links to Trumpington Meadows and replacement/new undercover cycle parking with associated infrastructure and landscaping