Very questionable cycle route that meanders around the entire P&R.

SUBDOC0_2018_04_30_Covered_Cycle_Parking_Elevations.pdf

800mm spacing between Sheffield stands. Unclear aisle widths.

SUBDOC0_2018_04_30_Access_from_Trump_Meadows_Developm_Kerbs_&_Footways.pdf

Poorly placed bollards on curved section of path.

...

Operation of existing Park and Ride site on 24 hr basis together with a proposed extension to accommodate 279 car parking spaces ( including disabled parking bays ); additional bus and coach stops and layover area; reconfiguration of existing car parking and site entrance; provision of pedestrian and cycle links to Trumpington Meadows and replacement/new undercover cycle parking with associated infrastructure and landscaping

http://planning.cambridgeshire.gov.uk/swift/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=C/5001/18/CC&theTabNo=3

http://planning.cambridgeshire.gov.uk/swift/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=C/5001/18/CC&theTabNo=3

Location

Issues nearby
Back to top