22/02520/FUL | Installation of 11 sculptures and 5 benches (temporary)
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Gabriel Bienzobas // 1 thread
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
Created by Tim Ward // 1 thread
Google Maps suggests that Fen Rivers Way from Bottisham Lock to the A1123 is cyclable. It isn't.
Nigel // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Comms Officer // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Comms Officer // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
Created by Heather Coleman // 1 thread
There are 1970s-style barriers separating Charles Street and Rustat Road. This means that the large numbers of cyclists heading in both directions often have to give way to each other. These barriers need replacing by a removable bollard in the centre of the route, so cyclists can easily pass on the correct side as they would any other traffic island but cars can't get through. This is a literal barrier to easy safe convenient cycling and has no place in 21st Century Cambridge. Especially when there is an easy solution around it.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Finlay KM // 1 thread
A new set of barriers has appeared on the hospital side of the usway bridge at Addenbrookes.
Creates the usual set of problems for cargo bikes and less confident bike users, with the added bonus of being on a steep hill that ices up regularly, and right next to a busway with a record of squishing people who fall onto it.
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Anna Williams – Comms Officer // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough