20/04135/FUL: conversion to large HMO, Milton Road
20/04135/FUL | Conversion of existing integral garage to ensuite bedroom and change of use of dwelling (C4) to sui generis (a large HMO (7 persons) | 333 Milton Road Cambridge CB4 1XL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04135/FUL | Conversion of existing integral garage to ensuite bedroom and change of use of dwelling (C4) to sui generis (a large HMO (7 persons) | 333 Milton Road Cambridge CB4 1XL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from Class C3(a) to C4 turning a 7bed dwelling into:
6no bed HMO (6 persons) and
1no 2bed and
1no 1bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of existing dwelling to 2no dwellings including single storey rear extensions, first floor rear extension on new dwelling and roof extension to main dwelling.
1 Silverwood Close Cambridge CB1 3HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The main role of the Transport and Infrastructure Committee is to make recommendations on the following matters to the Combined Authority Board:
The Local Transport Plan Bus Strategy
The transport revenue budget, including any transport levy
The annual programme of strategic transport projects and the associated capital investment budget
Borrowing powers exercised as the Local Transport Authority
Creation of the key route network
This thread is for listing committee meetings.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Overview and Scrutiny Committee was established by the Combined Authority in March 2017 in accordance with the Combined Authorities Order 2017. The committee is made up of two members from each of the constituent councils of the Cambridgeshire and Peterborough Combined Authority. The role of the Overview and Scrutiny Committee is to review or scrutinise decisions and actions taken by the Combined Authority or the Mayor. The Chair is Cllr Lorna Dupre.
This thread is for listing committee meetings.
Created by Sergei Shishlov // 0 threads
The blue road sign which indicates the cycling route towards Addenbrookes, Trumpington and Newnham is pointing in the wrong direction. It currently points along High Street to the north, whereas the in fact both locations are to the south. So the sign is pointing in the opposite direction and needs to be turned at 180 degrees. Two other signs attached to the same pole pointing to Fulbourn and various other locations in Cambridge are positioned correctly.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use of single dwelling to 4no. flats, first and second floor side and rear extension and rear terraces, porch and roof lights to front elevation and erection of bike store to front.
338 Cherry Hinton Road Cambridge CB1 8AZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03912/FUL | Residential development containing eight flats along with access, car parking, landscaping and infrastructure | Land Rear Of Gibson House Paradise Street Cambridge Cambridgeshire CB1 1DJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03838/FUL | Demolition of existing house and the erection of 3 No. dwellings | 38 High Street Chesterton Cambridge CB4 1NG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03877/FUL | Change of use from residential (C3) to large scale HMO for 12 persons (Sui Generis)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03966/FUL | Change of use from one dwelling to four flats, single storey rear extension and external alterations. | 1 Blackhall Road Cambridge CB4 3NJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread for committee meetings
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03034/FUL | Erection of new 2-Bedroom house adjoining existing house (number 168 New Street). | 168 New Street Cambridge CB1 2QX
Tom McKeown // 1 thread
Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.
Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS
Cambridge
Application reference : 20/03742/FUL
20/02728/REM | Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/3064/16/OL for 155 dwellings following demolition of two existing dwellings | Land South Of 279 St Neots Road Hardwick Cambridgeshire
Created by Paul Robison // 1 thread
Storey's Way open again to through traffic
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Greater Cambridge Partnership operates as a Joint Committee, under powers delegated by its three local authority partners.
It is led by a decision-making Executive Board which coordinates the overall strategic vision and drives forward the partnership’s programme of work. It is run in accordance with a clear governance structure, agreed by all partners.
The Executive Board is made up of one representative from each of the City Deal partners. While the law governing Joint Committees only allows the three local authority representatives voting rights, they consider the advice of the other representatives, to make sure decisions also represent the business and academic sectors.
The Board is advised and informed by a Joint Assembly. The Joint Assembly provides advice to the Executive Board, drawing on the broad expertise of its 15 members. The Assembly’s membership is made up of three elected councillors from each of the three councils in the Greater Cambridge area, and reflects the political composition of their council. The other City Deal partners each nominate three representatives, as stakeholders from a range of organisations within the fields of business and academia.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Issues related to Milton being worked on by Milton Cycling Campaign, a new group formed by Camcycle members living in the village.
Created by Heather Coleman // 1 thread
There's a wet greasy line the length of the southbound carriageway on Hills Road between OLEM and Station Road, just outside the bike lane. When I cycled down there around 8.50am there was a very strong smell of diesel.
TAKE CARE. Diesel doesn't just evaporate as petrol would but leaves a greasy slippery residue that can persist for some days.
I've tried reporting to County, who don't want to know. I've bounced the report to City; who knows if they will do anything or say it's not their problem either.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Planning and Transport Scrutiny Committee consists of nine councillors who scrutinise the decisions of the Executive Councillor for Planning Policy and Open Spaces and the Executive Councillor for Transport and Community Safety.
20/03523/FUL | Erection of a 5 storey building and a 6 storey building for commercial/business purposes, erection of a transport hub, gymnasium, surface parking, landscaping and associated infrastructure including demolition of the existing building (St John's House) and associated structures. | Land In The North West Part Of The St Johns Innovation Park Cowley Road Milton Cambridge Cambridgeshire CB4 0ZT
Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure
Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire
Cambridge
Application reference : 20/03802/FUL
Tom McKeown // 1 thread
Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.
A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/0746/15/OL to provide 86 residential units following demolition of 39a Station Road West and the formation of a new access road.
39A And Lion Works Station Road (west) Whittlesford Cambridge Cambridgeshire CB22 4NL
Cambridge
Application reference : 20/03755/REM
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)