Unlit post hazard
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Josh Grantham // 1 thread
22/02776/FUL | Erection of 3no 2bed units providing accommodation for use by Pembroke College, as well as alterations/refurbishment of existing Coach House to rear of 32 Panton Street and associated landscape works/vehicle and cycle parking, and bins storage, including the front gardens of nos 32-40 Panton Street. | The Coach House Rear Of 32 Panton Street Cambridge Cambridgeshire CB2 1HP
Created by Josh Grantham // 1 thread
unacceptable cycle parking arrangement at dwelling house to sui generis large HMO (9no. bedrooms / 9no. occupants). | 11 Darwin Drive Cambridge Cambridgeshire CB4 3HQ.
Created by Nick Flynn // 1 thread
Hello
This is my application for a cycle shed on my driveway.
Unfortunately I have received an objection from a neighbour.
Created by Josh Grantham // 1 thread
Demolition of existing house and erection of eight flats and one maisonette (net eight new homes) together with ancillary works | 611 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The updated Manual for Streets is to be published on 1 July 2022.
Created by Roxanne (CEO) // 1 thread
Proposals for a new development on Fanshaw Road have been approved. A planning application is pending.
Created by Gabriel Bienzobas // 1 thread
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
Created by Tim Ward // 1 thread
Google Maps suggests that Fen Rivers Way from Bottisham Lock to the A1123 is cyclable. It isn't.
Anon // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Roxanne (CEO) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?