21/01609/FUL: 7 1bed flats & restaurant, 60 Mill Road
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Roxanne (CEO) // 1 thread
This site has been redeveloped from industrial to commercial use (office and leisure/food).
Reports on Twitter suggest insufficient cycle parking.
Planning application:
Site website:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01330/FUL | Conversion and extensions to provide 9 No. flats (Use Class C3) along with access, cycle parking and associated infrastructure | 4 Highworth Avenue Cambridge Cambridgeshire CB4 2BG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01393/FUL | Construction of a drop-off/pick-up bay located along Gilbert Road to assist taxi movements associated with the aparthotel | Gilbert Road Adjacent To Aparthotel 33A Milton Road Cambridge Cambridgeshire CB4 1UZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01402/FUL | Conversion of the existing warden's office to a bedroom with en-suite, adaption of the existing car park to increase capacity with 4 additional spaces, and installation of a new Bike Shelter. | Ely Place Monkswell Cambridge CB2 9SS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01279/FUL | Demolition of existing garage and creation of a one bedroom dwelling including outdoor amenity space and primary pedestrian access from Cromwell Road | Land At 64 Cromwell Road Cambridge CB1 3EG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01297/FUL | Change of use and conversion of the existing Regent Hotel from an hotel use to serviced accommodation (sui generis use). | Regent Hotel 41 Regent Street Cambridge Cambridgeshire CB2 1AB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01315/FUL | Erection of a 3bed detached dwelling. | 24 Elfleda Road Cambridge CB5 8LZ
sound+fury // 1 thread
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01065/FUL | Construction of 26 new private homes | Land Adj Sandy Lane Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01142/FUL | Extensions and alterations to ground floor retail unit, conversion and extension of first floor offices and part of ground floor to create 3 new apartments on each floor. |
65 Regent Street Cambridge CB2 1AB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01219/FUL | Demolition of existing garages and erection of a 2 storey dwelling and associated car parking |
Land On The South East Side Of 72 Canterbury Street Cambridge CB4 3QF
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01151/FUL | Erection of 14 dwellings, including 4 affordable dwellings, and associated works including alterations to access to the site.
139 Ditton Walk Cambridge Cambridgeshire CB5 8QD
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00946/FUL | Erection of three bedroom house in garden | 17 Peverel Road Cambridge Cambridgeshire CB5 8RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01082/FUL | Change of use to a large HMO (7 persons) (sui generis). | 70 Coleridge Road Cambridge CB1 3PJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00915/REM | Reserved matters application for the approval of details of appearance, landscaping, layout and scale following outline planning permission S/2921/15/OL (Erection of 26 Dwellings including 10 Affordable Units & Ancillary Access Arrangements (All matters reserved apart from access)).
The outline planning application did not seek permission for EIA Development.
Land To The Rear Of 1B Over Road Willingham Cambridge Cambridgeshire CB24 5EU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
A consultation has opened concerning the potential and future of three adjoining sites at Sidney St and Hobson St in Cambridge city centre. The sites are:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/01992/FUL | Erection of 41 dwellings, including two self-build plots and associated development | Bennell Farm West Street Toft CB23 7EN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Varsity Hotel and Spa is seeking approvals from the planning committee
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)