23/02127/FUL Eighth floor proposed for Mayflower House
They propose to add an eighth floor to Mayflower House, and to increase the cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
sound+fury // 1 thread
They propose to add an eighth floor to Mayflower House, and to increase the cycle parking.
sound+fury // 1 thread
Change of use of the first floor only at 13-14 Burleigh Street, Cambridge from use falling within Class E (commercial, business and service) to two flats comprising one 1xbed unit and one Studio unit (Class C3 (dwellinghouse)).
13 - 14 Burleigh Street Cambridge Cambridgeshire CB1 1DG
Cambridge
Application reference : 23/01966/PRIOR
sound+fury // 1 thread
Created by cpax // 1 thread
Post removed , increased usage by cars .
Created by Robert Watson // 1 thread
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
sound+fury // 1 thread
Created by Nick Flynn // 1 thread
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
Created by KW // 1 thread
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
sound+fury // 1 thread
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
Created by Ruth Corns // 1 thread
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
Created by cpax // 1 thread
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked .
Created by Anna Williams – Head of Campaigns & Engagement // 4 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
Created by Heather Coleman // 1 thread
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
Created by Jonny Camp // 1 thread
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
Created by Martin Wheatley // 1 thread
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
sound+fury // 1 thread
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
Martin Lucas-Smith // 1 thread
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
Martin Lucas-Smith // 1 thread
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
sound+fury // 1 thread
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
sound+fury // 1 thread
We might need to look at the road layout proposed here.
Created by Richard Holton // 0 threads
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)