  • Milton Road cycle/foot paths narrow and/or blocked

    Created by Simon Powell // 3 threads

    City Fibre commenced fibre-laying work on Milton Road in mid-June, digging trenches on both sides of the road at various locations between Downhams Lane and Gilbert Road, mostly on the north-west side.

    This has reduced the combined width of the dual-direction cycle lane and pavement down to about 2 feet in places, often preventing cyclists/pedestrians from being able to physically pass each other. In some places, the footpath and cycle lane have been completely blocked with barriers for periods of time, forcing people into the main traffic lanes. In one of these places, keep-left signs have been put up next to the kerb in the reverse direction, implying that cyclists on the path should go into the traffic lane on the wrong side of the road. Social distancing for Covid-19 is obviously not possible in much of this area now, particularly when groups of workers are standing closely together in the remaining narrow path itself next to the work sites.

    This has coincided with the re-opening of the primary schools and there are quite a few people using the paths. I've had to stop my kid cycling to school as we no longer have safe route down there.

    Please sign in to vote.
  • 53 serviced appartments, Queen Edith's Way

    sound+fury // 1 thread

    The erection of new buildings to provide 53 serviced apartments (sui generis) together with hard and soft landscaping, basement car parking spaces and associated infrastructure and works | Land At 11 Queen Ediths Way Cambridge Cambridgeshire. 

    Please sign in to vote.
  • 20/02160/FUL: New 3 storey building (10 units), 4 Highworth Avenue

    Created by Rosamund Humphrey (Admin Officer) // 1 thread

    Proposed plan: Demolition of existing building and construction of a new 3 storey residential building comprising 10 units (net increase of nine) along with access, cycle parking and associated infrastructure. 

    Bike store for 14 cycles, unclear what kind of fastenings (Sheffield stands/other). Is it big enough to enable cycles in the furthest cycle spaces to manoeuvre in/out? Is the entrance wide enough to accommodate movement of adapted bikes?

    Please sign in to vote.
  • 20/02564/S73: Construction of 6 storey office building, Station Rd, CB1 2JD

    Section 73 application to vary condition 2 of permission 15/0864/FUL: will 254 cycle parking spaces be sufficient for this office space?

    Demolition of Leda House and construction of a new 6 storey office building comprising 7421sq.m (GEA) of office floorspace (Class B1); 254 cycle parking spaces; associated plant; hard and soft landscaping; a basement with 40 car parking spaces and 5 motorcycle bays; infrastructure works including basement car park ramp (Scheme B) to permit improved fire escape provision, enhanced cycle facilities and revised elevational treatment. 

    Location: 20 Station Road, Cambridge, CB1 2JD

    Please sign in to vote.
  • CCC/20/033/FUL A1307 / Haverhill Road / Gog Farm shop junction

    Created by Matthew // 1 thread

    CCC/20/033/FUL | Construction of a new staggered junction, footway / cycleway; an at grade unsignalised crossing point for pedestrians and cyclists at the A1307 / Haverhill Road / Gog Farm shop junction; a new right turn filter lane and upgraded crossing point for pedestrians and cyclists at the Gog Farm Shop entrance, including associated engineering and landscape works. | Junction Of A1307 Babraham Road With Haverhill Road / And The Access To Gog Farm Shop Heath Farm Shelford CB22 3AD, (within The Parish Of Stapleford).

    Please sign in to vote.
  • 20/02171/OUT Northstowe Phase 3A (4,000 homes, 2 primary schools, local centre)

    Created by Matthew // 1 thread

    20/02171/OUT | Outline planning application for the development of Northstowe Phase 3A for up to 4,000 homes, two primary schools, a local centre (including employment, community, retail and associated services, food and drink, community, leisure, residential uses and other accommodation), secondary mixed use zones (including employment, community, retail and associated services, food and drink, community, leisure, residential uses), open space and landscaped areas, sports pitches, associated engineering and infrastructure works, including the retention of the existing military lake and creation of a new lake, with details of appearance, landscaping, layout, scale and access reserved. Application is accompanied by an Environmental Statement and involves works to/affecting existing Public Rights of Way. | Northstowe Phase 3A Rampton Road Longstanton Cambs

    Please sign in to vote.
  • Milton COVID-19 urgent measures

    Created by Edward Taylor // 1 thread

    Brief proposal for temporary measures in Milton.
    Raised as a result of COVID-19 distancing measures
    In addition to or in concert with suggestions arising from Spaces to Breathe

    1. Use a point closure at the north side of Cambridge to forbid southbound through traffic. Why? It eliminates through traffic in Milton, especially at peak times. There are other versions of this idea for Milton, such as modal filters. Driving into Milton centre should be further discouraged in favour of the A10 bypass.

    2. Implement a 20mph speed limit throughout Milton. Why? Reducing speed limits slows down drivers, a bit. It shifts the balance in favour of walking and cycling. The street environment becomes calmer, cleaner and quieter. In residential areas, there are more walkers and people just drive slower naturally. In these areas, cycling and walking becomes more pleasant and statistically safer. Fatality rate in collisions drops significantly.

    3. Remove on-street car storage on Cambridge Road / High street. Why? On-street car storage encourages people to choose the car when making journeys within Milton. (I've done it myself.) Nowhere within Milton is more than a 3 minute cycle journey away.

    4. Give cyclists and pedestrians priority at several key junctions on the Milton-Cambridge cycle route.(Winship road to Cambride Road) Why? To encourage people to use these routes and improve safety.

    The DfT has made it clear that the money will only be allocated for measures that truly make space for cycling (please let me know if you want to see the letter, as it has not been widely shared). Those painted lanes do not meet the criteria set by the government, so they will have to be paid by Cambs Highways.

    The deadline for councils to bid for the funds is Friday June 5th - in 6 days! If anybody has got any follow up suggestions I would suggest emailing our concillors well before that date, as any measures proposed will also have to be reviewed by Cambs Highways before they are sent off.

    Please sign in to vote.
  • 20/01474/REM Phase 3 of community garden at Clay Farm

    Created by Matthew // 1 thread

    20/01474/REM | Reserved Matters application pursuant to application 07/0620/OUT for Phase 3 of the Community garden at Clay Farm, to include a permanant community building (replacement of temporary building), new central east-west footpath through community garden and new cycle link to western edge of site. | Land South Of Long Road And East Of Hobson's Brook Clay Farm Development Site Long Road Cambridge

    Please sign in to vote.
  • A1307/Highways England

    Created by Tim Burford // 1 thread

     www.cyclestreets.net/location/115949/ to 115951 -

    After all our correspondence with the chief exec of Highways England this is a pretty clear two fingers to all non-motorised users - the shared-use footway comes to a sudden end dumping north/westbound cyclists et al in the south/eastbound side of a dual carriageway with a 'safety' barrier blocking the way across. Insane.

    Please sign in to vote.
  • 20/02142/OUT Northstowe Phase 3B

    Created by Matthew // 1 thread

    20/02142/OUT | Outline planning application for the development of Northstowe Phase 3B, comprising up to 1,000 homes, a primary school, secondary mixed use zone (with retail and associated services, food and drink, community, leisure, employment and residential uses), open space and landscaped areas, engineering and infrastructure works, with details of appearance, landscaping, layout, scale and access reserved. Application accompanied by an Environmental Statement. | Northstowe Phase 3B Station Road Longstanton Cambs

    https://applications.greatercambridgeplanning.org/online-applications/applicationDetails.do?activeTab=summary&keyVal=Q95BCSDXHCG00

    Please sign in to vote.