Surfacing problem under Stourbridge Common bridge
There have been several reports of a surfacing problem here.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Martin Lucas-Smith // 1 thread
There have been several reports of a surfacing problem here.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Martin Lucas-Smith // 2 threads
The University Arms (next to the entrance to Parker's Piece) is planning a new frontage.
This could have cycle access issues.
Also this would be a good opportunity to push for a contraflow from Hobbs Pavilion to Regent Street.
Created by David Earl // 2 threads
Key problem: they are trying to create a new car entrance off Gresham Road in the neck of the cycleway.
"Demolition of Gresham House, and refurbishment and extension of Gonville Hotel to provide an additional 43 bedrooms and new spa/treatment rooms, with internal and external remodelling of the existing hotel to create a new dining area and hotel entrance, and associated external works and landscaping"
Created by Heather Coleman // 2 threads
A colleague has just come off the phone to the police, after being knocked off his bike on Hills Road. The Police are refusing to log this incident despite him being minorly injured and his bike being expensively damaged unless he comes into the Police Station in person to report it (he was cycling down Hills Road, person pulled out of side road without looking, in daylight and good visibility). As he works and lives near Addenbrooke's, this will take a great deal of his time, especially as he now has no transport, and he's just going "I can't be faffed, I've got work to do". This will also lead to him having to pay for the repairs to his bike, as, without an incident number, he cannot make an insurance claim.
I note on our website the following advice: "If anyone is injured, the incident must be reported to the police. For minor injuries there may be little that they will do. However, they are obliged to record the incident so that it appears in statistics, and you will need an incident number from the police if any insurance claim is involved."
I cannot believe that in the 21st Century, when I think we've had the telephone for over a hundred years, that people are required to physically visit the police station (of which there are fewer and fewer, and in many towns, hidden out of sight - my parents' nearest police station is now about 20 miles from where they live, despite living in a town of about 20000 people) to get an incident number.
Is this true? If not, what can he/we do about the misinformation being peddled by the Police? If true, what can we do to drag our public servants (as a taxpayer, I help pay their wages, thus they are in effect my servants) into the 21st Century?
Created by fh // 1 thread
At busy times of day, it is very difficult for cyclists to turn out of Pembroke Street when turning right onto Trumpington Street. Trumpington street has priority and there are no traffic lights. This creates the following problems:
1) Cyclists turning out of Pembroke Street right onto Trumpington street when there is not enough space/time to do so. This causes a lot of braking and it is common to see a lot of people braking or hear a car horn because of this.
2) Build-ups of cyclists waiting to turn out of Pembroke Street get in the way of buses turning into Pembroke street (as buses need more turning space).
This is particularly bad around 9am.
Martin Lucas-Smith // 3 threads
Huntingdon Road currently has rather narrow cycle lanes, which are unnecessarily so since this is quite a wide road.
There is space here to create really high-quality, direct, cycle infrastructure which retains priority at sideroads and which would encourage new people to start cycling.
Created by John Hall // 0 threads
Cambridge Cycle Brochure
Just a starting point
Format A4
4 to 8 pages
Images and artwork
Audience - Provide solutions for:
school run
commuters - better experience
older people
non cyclists - journey times
improve you neighbourhood
car free households - Zip cars
council officers
village residents
- taxi drivers and our critics
Delivery - with News and Crier?
A test delivery could be used to assess the response to the brochure in terms of new memberships or visits to a web page
Subjects
off road routes to drivers such as along the Cam
3D barcode links to video etc
Segregated cycle routes
Hub and spokes to villages
The CT
West Cambridge Development
Why should new development contain cycle paths?
Why should new buildings have good cycle facilities?
What kind of bike training is available?
Membership form perhaps with a discount for direct debits?
Priority over side roads / platforms / set back crossing
Build it and it will be used e.g. Shelford Path 300k users per annum
Health benefits
Noise pollution
Who pays for roads
Cargo bikes
Go Dutch
Martin Lucas-Smith // 1 thread
Anglia Ruskin are developing their new Faculty of Health, Social Care and Education here. They are required to undertake amendments to the junction here. Can this be improved for cycling?
Martin Lucas-Smith // 2 threads
Proposed demolition of two existing dwelling houses and construction of 12no.flats including land for parking of vehicles in association with the adjacent commercial use at 184 Histon Road | 186-188 Histon Road Cambridge Cambridgeshire CB4 3JP
[Previously reported by Michael Cahn]
Created by velocipedus@gmail.com // 1 thread
University Technical College (UTC) Cambridge is to be launched at the Long Road 6th From site.
The UTC will open in new build facilities in September 2014 and will deliver a technical education to 670 students aged 14 to 19
It is a collaboration of Cambridge University Health Partners, Cambridge Regional College, Babraham Institute, Napp Pharmaceuticals, Medical Research Council, Wellcome Trust Sanger Institute, Long Road Sixth Form College, Parkside Federation Academies, Cambridge Cleantech, Cambridgeshire County Council, East of England NHS, Anglian Water, The Cube, AmeyCespa
Public Exhibition 11 April 2013
4pm to 8pm
Long Road Sixth Form College
Cambridge Regional College in association with Long Road Sixth Form College, their industry partners and Cambridge University Health Partners are developing designs for an exciting new University Technical College on the Long Road Sixth Form College site.
Project Manager is Laurence Wells
c/o Cambridge Regional College
Kings Hedges Road
Cambridge
CB4 2QT
Tel 01223 418502
Created by Monica Frisch // 8 threads
This is an administrative issue to help Cambridge Cycling Campaign keep track of the briefing papers it is producing
Created by Heather Coleman // 1 thread
I'm just working out that it seems hard to start a thread without an issue, and something that doesn't have a specific location (actually, I think having to provide a location for something when not appropriate counts as a bug).
Last Thursday (so Maundy Thursday so the day before the double Bank Holiday weekend), there were people on Riverside between the new Riverside Bridge and the path up to Tesco, doing a traffic survey. I can't think of a less appropriate day to do one (maybe Christmas Eve which is also not a Bank Holiday but might as well be), unless the aim was "to show no-one really commutes along Riverside, and no school children travel along there". As far as I can tell, every state school was having a teacher training day even though their holidays were supposed to start on the Friday, all the private schools were off, there are no students around, and no rowers, and even lots of normal workers were presumably taking a day's holiday judging from how full my place of employment and the general traffic levels everywhere during "rush" hour. The location of this survey is irrelevant, as the data generated, wherever it was, will be irrelevant unless the question was "how little traffic is there on a day when all the schools are closed and lots of people have taken the day off work?".
Is there any logic to when traffic surveys are done? Since they generate data that the Council use to decide on road maintenance, gritting etc, it's important that these data are meaningful.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 6 threads
Travel for Work Partnership http://www.tfw.org.uk/ brings together Chambers of Commerce, Cambridge City Council, Huntingdonshire District Council, East Cambridgeshire County Council, NHS Cambridgeshire, University of Cambridge, Council for the Protection of Rural England, South Cambridgeshire District Council, Cambridge University Hospitals NHS Trust, Cambridgeshire County Council, Cambridge Cycling Campaign.
Within this issue there is place for threads relating to single (major) employers, particular benefits or services, issues, the governance of TfW, the role of public health, parking allocation, best practice elsewhere etc
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Martin Lucas-Smith // 1 thread
The entrance to Parker's Piece has been blocked at various points over the last year by thoughtless location of a street-trading van.
Trading in this location should be permitted only further along the path so that conflict between cycles and pedestrians in an already-confined space is reduced.
Created by Simon Nuttall // 1 thread
I've had a report that one of the council's quad bikes has mistakenly sprayed diesel fuel on the section of cycleway between the Jane Coston Bridge along the side of Cowley Road down as far as junction near Milton Road.
These needs checking, but if true will be a news story tomorrow and quite an environmental problem.
Created by David Earl // 2 threads
Proposed Change of Use of the ground floor retail units from a retail use (A1) to A1 shops, A2 (financial and professional services), and/or a sui generis Car Showroom (in the alternative)
Created by Robin Heydon // 1 thread
Cambridge Sport Lakes has been approved by South Cambridgeshire District Council. This provides an opportunity to create a safe and direct route from Milton to Waterbeach.
I think we should contact this organisation and attempt to get the best possible cycle tracks possible through the development.
Martin Lucas-Smith // 1 thread
13/0237/FUL
Erection of building to accommodate ground floor retail (Use Class A1) and 14 en-suite bedsits (HMO) at first and second floor level (Sui generis), together with two communal kitchens, laundry room, cleaning rooms and associated bike and bin storage.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 18 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)