Traffic Light Priority
Threads discussing approaches for priority given to cyclists at traffic lights around Cambridge, such as 'all way cycle green', 'left turn on red', 'advance green' approaches
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Chris Brown // 3 threads
Threads discussing approaches for priority given to cyclists at traffic lights around Cambridge, such as 'all way cycle green', 'left turn on red', 'advance green' approaches
Martin Lucas-Smith // 1 thread
A link, possibly involving a bridge, has been proposed for many years, to join the Station to the Leisure Park more directly.
Cambridge Cycling Campaign does not at present have a position on the desirability of this scheme, but it is worth us keeping track of developments.
Created by Roxanne (Cycling Campaign Officer) // 2 threads
Mixed use development comprising ground floor retail (use Class A1), with a non-speculative student accommodation scheme of 26No. Bedrooms on the upper floors to be occupied by Abbey College, along with cycle parking, following demolition of exisiting buildings on site.
23-25 Hills Road Cambridge Cambridgeshire CB2 1NW
Cambridge
Application reference : 15/1760/FUL
Created by Roxanne (Cycling Campaign Officer) // 2 threads
Outline planning permission is sought for the erection of a residential development containing up to 48 dwellings (Class C3) including affordable housing, access, car parking and associated works, open space, landscaping, all matters reserved except for access.
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by George Coulouris // 1 thread
I'm a member of LCC who also cycles in Cambridge. I would like to gather comments and share some data I have collected about the Magdelene Street/Chesterton Lane early-release junction. Further details coming up in a thread.
Created by Richard Jennings // 1 thread
In order to increase cycle parking in this development (because two dwellings are being added) the developer is proposing to use Cycloc Solo wall hanging cycle stands.
Created by Cllr Ian Manning // 1 thread
Altering the guidance given to planning with respect to walking/cycling
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of 23 residential units (use class C3) to be arranged in two blocks comprising a mix of studio and 1 & 2 bed flats including 40% affordable housing, two car parking spaces, cycle parking and associated hard and soft landscaping.
149B Histon Road Cambridge Cambridgeshire CB4 3JD
Application reference : 15/1369/FUL
DETAILS:
23 residential apartment units comprising 22 x 1-bed and studio units and 1 x 2 bed unit
Transport statement:
There will be no onsite car parking
There will be 26 cycle parking spaces (the minimum requirement is 24)
States (in paragraph 6.3) that the cycle parking will meet the requirements from the local plan 2006:
>Cycle racks or stands should conform to the design and dimension requirements.
>For residential, cycle parking should be within a covered lockable enclosure. The cycle parking should be accessible and convenient to use.
>All cycle parking should be designed to minimise conflict between cycles and motor vehicles.
There are no details or drawings of the proposed cycle parking provision in the transport statement.
Floor Plans:
The floor plans for A and B indicate there will be two enclosed cycle store areas, one on the ground floor of each block. There are no details of what type of racks will be used. Although the drawing indicates sheffield stands (8 for block A = 16 cycles) (5 for block B = 10 cycles).
Martin Lucas-Smith // 1 thread
The following planning application has been submitted. This may be an opportunity to raise through the planning system the inappropriateness that vehicles can be driven into the site but not people cannot cycle (I believe). As the planning application includes public access to the new facilities, the ability for people to cycle direct to the buildings is relevant to the public.
---
Demolition of old chorister block and netball court and erection of new sports hall, gym/studio and changing rooms including new pedestrian access and landscaping.
Kings College School West Road Cambridge Cambridgeshire CB3 9DN
Application reference : 15/1309/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
We have been invited by the City Council to join a meeting to discuss lighting for green spaces. Is this something we would like to partake in and if so who is the best representative for the Campaign.
The draft agenda is:
· Introductions
· Where we are now
· What we want to achieve
· Discussion on Lighting for Green Spaces
· AOB
The meeting will be held at the Guildhall in Cambridge, final details to be confirmed once the date and agenda are agreed.
Created by Sam Webster // 1 thread
Surprised to see that somebody has put up barriers restricting the width of the bus/cycle path so that there's not enough room for a bus to pass a bike. Dangerous enough to call Police?
Created by Rohan Wilson // 1 thread
15/1227/FUL | Erection of a new 18,000sqm research laboratory building (Use Class B1 (b)) and associated works. | Puddicombe Way Cambridge
Site Plan shows "Cycle Storage" adjacent to the hotel? site to the east.
Red line extending to Robinson Way (north of Francis Crick roundabout), Puddicombe Way and including half the Forum area suggests intention to secure good transport links.
Essential to remedy poor walking/cycling layout at foot of busway/cycleway bridge, and secure easy access to (across?) the bus/cycleway's extension to The Forum, where the intention may be to continue cycleway on southern side only of busway.
Standard Consultation Expiry Date Thu 06 Aug 2015
Richard G // 1 thread
the junction of Consort Avenue and the old service road alongside Hauxton Road seems to have been designed specially to hold up cyclists
It has two button controlled crossings, over a lightly used road, and I would expect it to be ignored by every single cyclist.
A simple, "Give Way" should be perfectly sufficient I would have thought
Was any comment made when this was designed/proposed?
Martin Lucas-Smith // 1 thread
The County Council is proposing to power off street lights overnight for most residential streets in Cambridge.
http://democracy.cambridge.gov.uk/ieIssueDetails.aspx?IId=15022&PlanId=0&Opt=3#AI14389
Created by Roxanne (Cycling Campaign Officer) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Roxanne (Cycling Campaign Officer) // 2 threads
Mount Pleasant Halls - the redevelopment of Mount Pleasant House as accommodation for St Edmund’s and Darwin Colleges.
Created by Tim Steele // 1 thread
Not sure why these signs are here. This isn't Route 51 or Route 11 and you can't turn here in any case.
Created by Tim Steele // 1 thread
Some route 51 signs have appeared here, although it's not on route 51
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.