Things tagged 'road'

limited to the area of Cambridge Cycling Campaign:

14 issues found for 'road':

  • Arbury Road changes - City Deal project

    Created by Joe Adam // 4 threads

    Arbury Road is proposed to be upgraded under the City Deal scheme.

    In 2014 there was a consultation running on improving the Arbury Road near St Laurence Primary School.

    Please sign in to vote.
  • Cobbles on NCN 11

    Created by MJR // 0 threads

    There are three strips of cobbles across NCN11 here, or maybe they're setts. It seems bad to have these on a cycle route because they are unpleasant for cycling and especially bad to put them so near a junction because rider attention should be on the junction and other road users, rather than man-made problems with the road surface.

    Please sign in to vote.
  • Milton road underpass closure

    Created by Cllr Ian Manning // 1 thread

    Separate thread about this to separate from the main rail station thread..

    The pedestrian/cycle underpass on Milton Road will be closed from August - December (currently) to facilitate rebuilding it for the busway extenstion.

    Road works will be in place during this time.

    Please sign in to vote.
  • King's Parade "closed" Monday 7th April

    Created by Heather Coleman // 1 thread

    When I popped into the Cambridge Wine Merchants last night, there were signs on all the posts and sheffield stands saying "no cycle parking from 6am, 7th April". I assumed some royal visit. I asked the man in the shop if he thought people not being able to park would affect trade and he said he hoped not. However, by the post where I normally park there's a big "road closed" sign, 6am-6pm (I think).

    He is under the impression that there is filming going on from 7am-10am. It is period filming in the 1950s therefore you can't have sheffield stands (probably not invented) or modern bikes.

    My main question/gripe is, when I see a "road closed" sign, I assume I will be able to get through even if I need to dismount and wheel my cycle. Sometimes, if it's a long walk, it may be quicker to cycle via another route. From the nature of what I've been told is going on, it sounds to me as if actually the road will even be closed to pedestrians, well unless they're wearing authentic 1950s dress.

    Does anyone know any more? Does anyone know anything about the legal status of forcing pedestrians to take a lengthy diversion from what is the public highway? There are various cyclescape threads which have mentioned that although cars only have a permissive right to use the road, pedestrians have some stronger right. Can they force pedestrians and dismounted cyclists to go another route, when it's not an issue of national security?

    Please sign in to vote.
  • HGV and LGV traffic on Nuffield Road

    Created by Klaas Brümann // 1 thread

    Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.

    Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.

    Petition: http://iitm.be/ChestertonTrafficReduction
    Picture Gallery: http://iitm.be/NuffieldRoad

    Please sign in to vote.
  • Carter Cycle Bridge Western Access Improvements

    Created by Edward Leigh // 2 threads

    Hidden away in the planning application for the Skanska development around the new Northern Access Road to Cambridge station are detailed proposals for the redesigned cycle access to the western end of Carter Bridge:
    http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=MPYVR2DX08L00
    [Scroll down to 'CARTER CYCLE BRIDGE WESTERN ACCESS IMPROVEMENTS'.]

    My concern is that the new junction with the bridge on-ramp will be difficult and dangerous to negotiate for cyclists and pedestrians. With 450 cycle movements towards the city at peak time, this will be a busy junction where cyclists are moving rapidly as they descend the slope. Those cyclists heading for the station will have to break hard before turning across the path of oncoming cyclists and across the footway in order to join the new link path.

    This is undoubtedly an improvement on the existing arrangement (which involves crossing Devonshire Road twice to access the station), but two options that seem to have been considered in the past but rejected would be safer and more convenient:

    1) Opening a route via Ravensworth Gardens through the existing wall at the boundary of the station car park.

    2) Adding a cycle-only ramp joining the south side of the bridge opposite the stairway.

    Any thoughts?

    Please sign in to vote.
  • Temporary road closures due to races

    Created by Heather Coleman // 2 threads

    e.g.

    A report in the Cambridge News
    http://www.cambridge-news.co.uk/Home/Streets-due-to-be-closed-to-traffic-for-the-race-24022012.htm

    The car-centric paper talks about motorists, but there is of course no information for cyclists and pedestrians. These are roads that are closed. To all traffic including cyclists and pedestrians? Will routes across the Commons also be closed to cyclists?

    How should those of us who have to work that day in the centre of town get to work? Will it paradoxically be easier for me to drive along the A14 and M11, down the Barton Road, and park my car on West Road, and walk through King's, than cycle through Chesterton and Midsummer Common and through town and try to park my bike on King's Parade?

    Please sign in to vote.

28 threads found for 'road':

No planning applications found for 'road'.

Back to top