23/03068/FUL Refurbishment of the building to facilitate MRI installation

Please sign in to vote.

Added by sound+fury

Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).

163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN

Cambridge

Application reference : 23/03068/FUL

https://applications.greatercambridgeplanning.org/online-applications/applicationDetails.do?keyVal=RZ10W7DXJSK00&activeTab=summary

Location

Issues nearby
Back to top