12/1576/FUL Demolition of The Ranch pub and building student accommodation
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
limited to the area of Cambridge Cycling Campaign:
18 issues found for 'access':
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
sound+fury // 1 thread
A thread to discuss access from to the site from the Guided Busway.
Created by Heather Coleman // 1 thread
If you are cycling from Addenbrooke's to Big Sainsburys on Coldham's Lane/Brooks Road, there is no legal way to go there without going around the Big Frightening Roundabout. As well as the obvious hazards, this must also add several hundred yards to the journey.
Since Sainsbury's now have wonderful cycle parking which is actually near the door (I'd not been there for several years but it's the only place in Cambridge that sell one particular grocery I use regularly so I have to), should we be campaigning to get this fixed. It needs fixing. The whole road layout to get to and from the shop is entirely car-centric, despite the fact that they've now got better bike parking than any other retailer with a similarly sized car park.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of a residential development containing eight units (one 2xbed flat, five 1xbed flats and two studio units) following the demolition of the existing buildings on the site
19 - 21 Godesdone Road Cambridge Cambridgeshire CB5 8HR
Cambridge
Application reference : 16/1002/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Mixed used development comprising a Day Nursery at ground floor and 40 self-contained 1xbed student rooms at the rear and on the upper floors along with a vehicle drop-off zone, cycle parking and associated landscaping.
Romsey Labour Club Mill Road Cambridge Cambridgeshire CB1 3NL
Cambridge
Application reference : 16/0821/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
16/0641/FUL | Residential development comprising 8 x 3 bedroom houses, 5 x 1 bedroom apartments and 1 x 2 bedroom apartment, formation of access including demolition of no. 74 Perne Road, landscaping, open space, drainage and supporting infrastructure. | 68 - 80 Perne Road Cambridge Cambridgeshire CB1 3RR
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Hester Wells // 1 thread
Churchill college are doing some construction, which has resulted in a new access built across the shared walking/cycling route on Madingley Road.
Created by Jim Chisholm // 3 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by Heather Coleman // 2 threads
The members' list has just had a post from a Tess Jones saying:
> FYI
> I wasn't able to go to the exhibition, but proposals are here:
>
> http://cambridgeforumconsultation.com/
I've replied that as someone who works on site, this is the first I've heard about this. There are various implications, that need looking at, before we decide if and what we need to say in the consulation.
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
Created by Rohan Wilson // 1 thread
An application for 148 homes 11/0008/FUL was refused by Planning Committee(against officer recommendation) on 4 April. Cycle parking "storage" is generally less easy to reach than car parking, and it appears that for the central blocks it is proposed in a shared basement area - I haven't found the drawing for the basement.
There is no access to the site except by the narrow road around the existing Westbrook office block - the site is a deep enclave.
The issues for cycling are probably virtually identical to previously. One of various reasons for previous refusal was "...lack of transport mitigation measures..." and the Highways provisional comment on the current one outlines concerns. I fear that cycle and pedestrian access issues were not previously considered grounds for refusal and that therefore we might be fighting a lost cause... have contacted the officer about this, and hope to submit a comment for Sustrans.
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
14 threads found for 'access':
A discussion on issue
Tollgate Village
Steven Moseley
posted
A discussion on issue
Difficulties in joining the Water End Orbital
Anon
posted
Chester Cycling Campaign
A discussion on issue
Route across Peckforton Hill (NCN45) at risk
SimonWBrown
posted
A discussion on issue
Route across Peckforton Hill (NCN45) at risk
tomguha
posted
A discussion on issue
Route across Peckforton Hill (NCN45) at risk
Chris Neston
posted
A discussion on issue
No safe cycle access to Brewers Fayre / Premier Inn at Freebridge Farm, West Lynn
Rob Archer
posted
A discussion on issue
Teddington Station cycle parking
TriClanger
posted
City Cycling Edinburgh
A discussion on issue
Barrier too narrow for some bikes
Donald Noble
posted
Trust Pathways
A discussion on issue
Access to Arnison centre
Gregory
posted
A discussion on issue
Addenbrooke's "forum"
David Earl
posted
St Albans Cycle Campaign
A discussion on issue
Oswald Road to Station
John Metcalf
posted
Richmond Cycling Campaign
A discussion on issue
Twickenham Bridge to Thames Path
Jenine
posted
Bristol Cycling Campaign
A discussion on issue
Restrictive Permeability between Bristol and South Gloucestshire on Wordsworth Road
Eric Booth
posted
A discussion on issue
Healthy Hospitals need to consider Cyclists
James Avery
posted
One library item found for 'access':
No planning applications found for 'access'.