  • Planned layout of new cycle/pedestrian crossing on Milton Road near Ascham Road

    Created by Ruth Corns // 1 thread

    I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement.  The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?

    Please sign in to vote.
  • Huntingdon Road: Girton Corner area improvements needed

    Created by Al Storer // 1 thread

    The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green. 

    But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.

    The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.

    Please sign in to vote.
  • Tins railway bridge fencing

    Created by David Earl // 1 thread

    The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.

    There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.

    Please sign in to vote.
  • Dangerous Snakey Path trail

    Created by DB // 1 thread

    I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways. 

    Please sign in to vote.
  • Cambridge Biomedical Campus Transport Needs Review

    Created by Sam Webster // 2 threads

    Cambridge Biomedical Campus Transport Needs Review report came out a couple of weeks ago.  Whilst some of it is good, I think the cycling stuff is poor in general:

    1. They look at cyclist safety in the surrounding area but due to the dates and area selected, they claim no fatalities.  Ignoring Steve Moir's death is insensitive at best.
    2. I didn't see any mention of NCR 11 passing through the site which suggests to me they didn't even realise
    3. A tiny bit about air pollution but the word climate doesn't even appear
    4. 'The segregated route alongside the CGB' - Do they mean segregated from buses?!
    5. 'Site observations showed the route alongside the Busway to the west of the site to be particularly well used by pedestrians and cyclists and of high quality'.  It's unsafe due to lack of separation from buses and pedestrians, too narrow for numbers and given speed differences over bridge and crosswinds.
    6. Nothing about the bus stops in mandatory cycle lanes
    7. Section 5.3.3 - peak counts/hour would be very useful
    8. 'Site visit observations suggest that cycling infrastructure near to CBC is currently performing well with the current demand' - CGB path is way over capacity at peak times.  I don't know about the other routes.

    I propose complaining about the standard of the cycling part of the report.

    Please sign in to vote.
  • Hobson Av / Busway

    Created by Daniel Dignam // 1 thread

    I complained to the council about the recent introduction of lights on the busway at Hobson Av. They're red for cyclists/pedestrians and don't appear to be triggered by bikes. There are 2 buses per hour that use Hobson Av so it seems entirely perverse for the priority to be as it is.

    In the reply justifying the priority for motor traffic it was stated that cars will soon start using this road to access a car park. Has anybody got knowledge about this, as I understood the planning consent access was going to be restricted to buses and emergency vehicles.

    I do think it's an accident waiting to happen, cyclists are going to get used to there being no traffic, and will cross on red (as they're allowed to if it's safe). If it was green all the time then it would be more obvious when they did change.

    Please sign in to vote.
  • Junction between Pembroke Street and Trumpington Street

    Created by fh // 1 thread

    At busy times of day, it is very difficult for cyclists to turn out of Pembroke Street when turning right onto Trumpington Street. Trumpington street has priority and there are no traffic lights. This creates the following problems:

    1) Cyclists turning out of Pembroke Street right onto Trumpington street when there is not enough space/time to do so. This causes a lot of braking and it is common to see a lot of people braking or hear a car horn because of this.

    2) Build-ups of cyclists waiting to turn out of Pembroke Street get in the way of buses turning into Pembroke street (as buses need more turning space).

    This is particularly bad around 9am.