Glebe Farm development
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
limited to the area of Cambridge Cycling Campaign:
866 issues found for 'planning':
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Outline planning permission was given in 2008 for this development of up to 347 houses. In 2011 a reserved matter relating to the design on the junction was refused by the Joint Development Control forum. This is still a subject of debate. Another concern is the path adjacent to Babraham Road which is much used by staff at Addenbrooke's either on foot on by bike.
A development of 1,780 houses, including community facilities, roads, footpaths and cycleways. Frontage land has already been built on (this is the land facing Huntingdon Road) and outline planning permission given.
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by Rohan Wilson // 0 threads
The adjacent, approved plot, 11/05530/FUL designed by the same architectural practice, places the cycle cupboard next to the front door and closer to it than is the car.
THIS proposal, however, offers the standard back-of-garden shed for bins and bikes, with the bikes beyond the bins, while the car driver door is adjacent to the house front door...
Note Manual for Streets 8.2.1, quoted in a prominent panel on p5 of the Cambridge Cycle Parking Guide:
"In residential developments, designers should aim to make access to cycle storage at least as convenient as access to car parking."
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
Created by Rohan Wilson // 1 thread
12/0342/FUL 12 cycle spaces indicated but space looks inadequate (no dimensions or layout shown)
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is on a local cycle link and thus it is reasonable, in the context of Cambridge, to anticipate a high proportion of parents and children arriving by bicycle. Indeed, bearing in mind the limited car parking available we would recommend that a travel plan strongly promoting cycle access for staff and users be required.
We object because we do not believe that the cycle parking space(s) allocated are consistent with the stated aim and the need to achieve high cycling levels. In particular, tagalongs, trailers and large carrier-bikes are likely to form a high proportion of customer cycles. The dimensions of the small, unsheltered enclosure (designed as a bin store in the current use of the site?) and a proposed layout are not given but look insufficient, and include a narrow entrance.
If cycles for say 30% of 18 customers, their children and 8 staff were to arrive by bike (say 3 staff, 6 adult customers and 8 children during a single class) then allowing a 50% margin for changeover between classes, space would be needed for a variety of types of bike and trailer to accommodate some 3 staff, 9 adult and 12 children customers.
This sort of calculation and the detail of the use of the cycle parking spaces do not seem to have been presented by the applicant, and should be required and assessed before the application is determined. We suggest that at least one car space would have to be used to accommodate sufficient cycles on this site.
The application proposes to design a new lobby for this department and to relocate the cycle racks.
This application proposes to demolish every but the façade of 55-57 Regent Street and create a restaurant with 14 residential units
Martin Lucas-Smith // 2 threads
Planning application here which may be of interest.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Created by David Earl // 2 threads
11 flats replacing existing building
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Martin Lucas-Smith // 19 threads
Major planning for 3,000 houses between Madingley Road and Huntingdon Road.
It will also have shops, University laboratories, etc.
173 threads found for 'planning':
Colchester Cycling Campaign
A discussion on issue
PA_212507_WyvernFrm600
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212657_25Creffield
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212540_BlueOwlGtHorks
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
O/COL/01/1624_SeverallsHosp
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212506_ChesterwellDayNursery
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212490_Copford6Hses
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212479_MTroofconv
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212473_63HighSt
Steven Moseley
posted
A discussion on issue
21/04350/FUL: change of use to 11no flats, 620-622 Chartwell House, Newmarket Rd
Rosamund Humphrey (Admin Officer)
posted
Colchester Cycling Campaign
A discussion on issue
PA_212385_78NSR
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212451_56MilRd
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212338_16WBC
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212055_PPSecureCyclePark
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212418_TileHouse4Hses
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_190522_GosbecksFarm
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212350_NorfolkNSR
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212257_WBerg-shedparking
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212294_StAndAvBungalow
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212192_HeadgateDWP
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212163_DArcyCycleParking
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_202349/202161/202321/202001
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_180886_PeartreeRd
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212198_79MagdalenStFlats
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212079_WillowsRear
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_211725_CannockMillHouseconv
Steven Moseley
posted
10 library items found for 'planning':
No planning applications found for 'planning'.