St Andrew's Street / Regent Street resurfacing
Resurfacing is happening in the coming few days.
Please report any problems here.
We should also be vigilant of any non-repainting of cycle lanes.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Martin Lucas-Smith // 2 threads
Resurfacing is happening in the coming few days.
Please report any problems here.
We should also be vigilant of any non-repainting of cycle lanes.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Created by Roxanne (CEO) // 1 thread
Residential development of up to 58 dwellings with associated infrastructure, landscaping, and public open space. All matters reserved except for access.
Land off Grafton Drive, Caldecote, CB23 7UE
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1144/17/OL
South Cambridgeshire
Application reference : S/1144/17/OL
Created by Roxanne (CEO) // 1 thread
Demolition of existing dwelling and the erection of 7no. self-contained flats with associated amenity space, parking, and bike/bin storage.
129, Cambridge Road, Great Shelford, Cambridge, Cambridgeshire, CB22 5JJ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1210/17/FL
South Cambridgeshire
Application reference : S/1210/17/FL
Created by Roxanne (CEO) // 1 thread
New covered cycle shelter for 72 cycles. Peterhouse College
Cosin Court Peterhouse Trumpington Street Cambridge CB2 1QU
Cambridge
Application reference : 17/0579/FUL
It is proposed that a bespoke covered shelter will be constructed to adjacent to the existing wall. The grass will be replaced with block paving to provide a good base that is permeable. The cycle shelter will be open sided to reduces its mass and avoid being visually intrusive. The roof will have a standing seem zinc covering.
Created by Roxanne (CEO) // 1 thread
Minor application, someone might be interested. 2 sheffield stands at rear of shop.
Renewal of shop front, installation of cassetted awning and new store to rear of premises.
31 Burleigh Street Cambridge CB1 1DG
Cambridge
Application reference : 17/0566/FUL
Created by Roxanne (CEO) // 0 threads
Conversion of the upper floors into 3 no. self-contained flats and associated external alterations.
27 Hills Road Cambridge Cambridgeshire CB2 1NW
Cambridge
Application reference : 17/0559/FUL
Created by Colin Rosenstiel // 1 thread
I thought the roadway at the rear of 1 Station Square was supposed to provide an alternative safer cycle route not through the car armageddon of Station Square. Won't this development block it?
Created by Roxanne (CEO) // 1 thread
SmithsonHill proposals for a park for AgriTech located to the east of the A1301 and South of the A505 at Hinxton.
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Roxanne (CEO) // 1 thread
Demolition of the front low boundary walls, installation of 4 bicycle racks to front, rebuilding the waste bins enclosure, replacement paving and removal of existing gravel with a resin bonded gravel surface. Installation of a bench and planting. Installation of low level garden post lights. Cosmetic changes to the facade of the front porch.
Standard bicycle rack with a creative insert to be designed by students and manufactured to specifications.
40 Humberstone Road Cambridge Cambridgeshire CB4 1JG
Cambridge
Application reference : 17/0185/FUL
Created by Matthew // 1 thread
QUOTE:
``Following discussion with Jamie Wilding at the North West
Cambridge Community Group Meeting, we'd like to arrange a design
workshop meeting to discuss our design proposals at Lot S3, North West Cambridge.
As you may be aware, the design narrative of Lot S3 is largely focused
upon creating a cycle friendly development. With this narrative in
mind, we are seeking the support and ideas of local cyclists.''
Created by Matthew // 1 thread
Generally poor quality roundabout with some highly unusual, so-called cycling 'infrastructure' that seems to have been added over the years, and approximately zero walking infrastructure.
This one comes up every so often but I was not able to identify an existing issue focused on this roundabout specifically.
Created by Roxanne (CEO) // 2 threads
Cambridge University is working on a 30 year transport strategy for all sites including colleges. The consultants preparing the strategy are currently consulting with various stakeholders including Camcycle.
I will set up a meeting with a few Camcycle representatives and the consultants. What ideas do we want to share and who should participate in the meeting?
They expressed interest in our (work in progress) cycling manifesto, vision for Cambridge and design guidance.
Created by Roxanne (CEO) // 1 thread
Erection of 5no. one bed dwellings (following the demolition of the existing dwelling), together with car and cycle parking, landscaping and associated infrastructure.
8 Green End Road Cambridge CB4 1RX
Cambridge
Application reference : 17/0340/FUL
Created by Roxanne (CEO) // 1 thread
This planning application was approved, but there is now a condition application for cycle parking. See: https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=OM2WUUDX0AS00
Refurbishment and extensions to the existing St Barnabas House, Stable Blocks and Kirby Building to provide 42 student bedrooms, manager accommodation and breakout space along with cycle parking following the demolition of existing single storey rear projection to St Barnabas House and kitchen store.
59 St Barnabas Road Cambridge Cambridgeshire CB1 2BX
Cambridge
Application reference : 16/1617/FUL
Created by Roxanne (CEO) // 1 thread
Outline planning application for up to 203 dwellings including affordable housing and land for community provision with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Ida Darwin Hospital Fulbourn Old Drift Fulbourn Cambridgeshire CB21 5EE
Cambridge
Application reference : 17/0402/CTY
Created by Roxanne (CEO) // 1 thread
There are various events on Parker's Piece which impact cycle access. What issues do we have and how do we think the various events should deal with them.
Cambridge Ahead and Grant Thornton are planning a Cambridge Live Lab to discuss key areas considered essential for future growth and prosperity including:
• Education and skills
• Housing and commercial space
• Infrastructure: connectivity and transport
I thought cyclists might like to register their interest to attend and give their views.
Created by Al Storer // 1 thread
As part of the Local Plan 2014 process, a 44 hectare site north of Cherry Hinton has been identified by Cambridge City Council and South Cambridgeshire District Council (SCDC) as being suitable for new residential development. The site is being promoted by Marshall Group Properties and Endurance Estates.
Created by Roxanne (CEO) // 2 threads
Erection of a residential apartment development to be arranged within two blocks comprising of ten 2 x bed units and 6 x 1 bed units along with car and cycle parking, hard and soft landscaping following the demolition of the existing buildings on the site.
34-36 Madingley Road Cambridge Cambridgeshire CB3 0EX
Cambridge
Application reference : 17/0172/FUL
Created by Roxanne (CEO) // 1 thread
Full planning application for the erection of 56 dwellings, including new access onto Fen Drayton Road, infrastructure, landscaping and open space
field north of Home Close and west of Moat, Land north of Fen Drayton Road, Swavesey
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0525/17/FL
South Cambridgeshire
Application reference : S/0525/17/FL
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by olwen williams // 1 thread
A cycleway runs along the pavement on the S side of Fen Causeway. There are various metal barriers, placed to prevent pedestrians coming off a footpath and going straight onto the road. 2-3 years ago, I collided with a barrier in the cycleway.because I was blinded by on-coming car headlights to my left. This barrier is uniquely dangerous because the oncoming cars are mounting the bridge over the river. In addition, oncoming cyclists on the right may both add to the difficulty in seeing the barrier and also narrow the cycleway. In rush hour, the barrier is obscured and invisible for about 25% of the time.
I am aware of one other person who has run into the barrier, but I suspect there must be more. If you have done so, please get in touch! I have so far been unsuccessful in persuading the council that this barrier must be removed.
Created by Roxanne (CEO) // 1 thread
Erection of five self-contained studios and associated works.
150 Catharine Street Cambridge CB1 3AR
Cambridge
Application reference : 17/0101/FUL
Cycle parking will be covered Sheffield stands providing parking "for at least 5 cycles". (See Design and Access Statement)
While this may meet the Council guidelines, it is insufficient for this location especially if there may be 2 people living in some of the studios or if they will have visitors.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?