Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
-
-
20/01979/PRI03M - change of use, new dwelling
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
-
20/01501/PRI0 30 - change of use - 68 new dwellings, Huntingdon Rd
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 68 dwellings. | National Institute Of Agricultural Botany Huntingdon Road Cambridge CB3 0LE
-
20/01426/FUL - 87 2 bed apartments, assisted-living, Maris Lane
Construction of 87 2bedroomed apartments, flanking a new public park to the south of Anstey Hall in order to provide assisted-living accommodation for people over 65. The Listed house will be adapted to serve as the central facilities for the retirement community. | Anstey Hall Maris Lane Cambridge Cambridgeshire CB2 9LG
-
20/01368/FUL - Two 2bed dwellings, Trefoil Terrace, Budleigh Close
Erection of 2no 2bed semi-detached dwellings with associated external works and drainage, with access via existing parking area at Trefoil Terrace. | Trefoil Terrace Budleigh Close Cambridge CB1 3BJ
-
20/01318/FUL - Three 3bed houses, Coldhams Lane
Demolition of existing single storey bungalow and erection of a terrace of 3no. 3bedroom houses along with new parking arrangements and associated works. | 248 Coldhams Lane Cambridge CB1 3HN
-
20/01101/FUL - Two dwellings, Marshall Rd
Subdivision of 1 Marshall Road, Cambridge to form two dwellings | 1 Marshall Road Cambridge CB1 7TY
-
20/01329/FUL - 9 person HMO, Mill Road
Change of use from staff accommodation to Large HMO (9 person). | Flat 111 - 113 Mill Road Cambridge Cambridgeshire CB1 2AZ
-
20/01847/PRI03O - 2 bed house plus study units, Newnham Rd
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 1no 2bedroom plus study unit. | 32 Newnham Road Cambridge CB3 9EY
-
20/01273/FUL - new 1 bed dwelling at 95 Cherry Hinton Rd
Erection of new one bedroom dwelling on land to the rear of 95 Cherry Hinton Road Cambridge Cambridgeshire CB1 7BS
-
20/01355/FUL - demolition & construction of 9 dwellings, Newmarket Rd
Application for demolition of existing and construction of 9 dwellings and associated external works.
P4 of Design and Access Statement states: 'Covered & secure cycle spaces are illustrated on the drawing and under current standard guidelines for new residences. They are generally near the entrances to each flat or available for visitors.'
However, 'Sheffield hoop under stair' is only indication I can see on site plan, so looks as though they are light on detail here and difficult to see if sufficient provision will be made for cycles.
Documents here:
-
Coldhams Lane Roundabout
What can be done to make the Coldhams Lane roundabout safer for all road users?
-
20/02072/PRI03O: Prior Approval notification. Change use offices to 33 dwellings
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 2 studio apartments and 31 x 1bed units.
509 Coldhams Lane Cambridge CB1 3JS
Cambridge
Application reference : 20/02072/PRI03O
-
Abolition of Cambridge Joint Area and Joint Development Control Committees
Constitution and Ethics Committee
Date/Time: 22 Apr 2020 - 14:00 to 16:00
Virtual Meeting
The County Council's Constitution and Ethics Committee is asked to recommend the changes to the County Council Constitution, as set out in the report, to full Council:
i) the abolition of the Economy and Environment and Highways and Infrastructure Committees;
ii) the introduction of the Environment and Sustainability and Highways and Transport Committees;
iii) revisions to the terms of reference of the General Purposes, Adults, Children and Young People, Commercial and Investment, Communities and Partnership and Health Committees;
iv) the abolition of the Cambridge Joint Area Committee by the end of July 2020 following the discussions set out in paragraph 3.3 of this report;
v) the withdrawal from the Joint Development Control Committee for Cambridge Fringes by the end of July 2020 following the discussions set out in paragraph 4.4 of this report; and
vi) increase the membership of General Purposes Committee from fifteen to seventeen.
-
20/01972/OUT Netherhall Gardens / Farm - up to 200 dwellings
Outline application (all matters reserved except for means of Access) for the erection of up to 200 residential dwellings, with associated infrastructure works, including access (vehicular, pedestrian and cycle), drainage, public open space and landscape.
Netherhall Farm Worts Causeway Cambridge CB1 8RJ
Cambridge
Application reference : 20/01972/OUT
-
Campaigning during the Coronavirus pandemic
Campaigning for cycling during the 2020 Coronavirus pandemic. What temporary changes should we campaign for? What longer-term changes should we be pushing for now?
-
20/01293/FUL - 6 new 1 bed flats, Cherry Hinton Road
Proposed conversion and extension of an existing HMO with one self contained flat into 6 x 1 bedroom self contained flats.
-
20/01261/FUL - extension & construction of new dwelling, Leete Road
First floor rear extension and demolition of outbuildings to the rear & construction of new 1 person single storey dwelling.
-
Upgraded cycleway from Cambourne to Cambridge, Cambridgeshire
Hardwick is seen as a commuter village for Cambridge but currently there are no cycle paths at all within the village, other than a 2 mile long on-road advisory shared with 40 mph traffic. There is also no cycle path north-south through the village - just over a mile. This is a village of around 1250 homes currently being extended to around 1500 but with little attention being paid to cycling yet.
In the S.106 Agreement for West Cambourne construction (2350 homes), SCDC Planning Reference S/2903/14/OL, Cambridge County Council have included an upgraded Cycle and footpath from West Cambourne to Cambridge passing through Hardwick. This can be seen in the S.106 Agreement Schedule 13 and is shown as Fully Funded in the current Cambridge County Council Transport Investment Plan, Scheme number 123.
Before construction of this goes ahead, will there be consultation with villages and residents along the route and do we have any indication of when this might commence? I note there should be plans available but these plans should be readable, clarified and modified with input from the villages on the route including Hardwick.
In the original plan submitted it seems the cycle paths proposed pass directly in front of 150 or so businesses and residential properties accesses and driveways which would seem to be entirely inappropriate for serious cycle-to-work opportunities.
This route appears to be independent from the Cambridge County Council "Greenways" initiative which also did not engage with Hardwick either
.
-
Contraflow on Park Terrace
The section of Park Terrace behind the hotel is wide enough for a cycle contraflow.
Although people can cycle in front of the pavilion, this is shared use and can be busy with pedestrians. It also means encountering traffic lights involving a wait unnecessarily.
Given that there is space, there seems no good reason not to provide a contraflow - in line with the principle that two-way cycling should be possible unless there is no space to do so.
-
20/01640/REM 286 No. dwellings, Cambourne
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2903/14/OL for 286 No. dwellings including affordable housing, associated hard and soft landscaping and all ancillary works.
Parcels 1.3B, 1.3C, 1.3E, 1.4A And 1.4B Sheepfold Lane Cambourne Cambs CB23 6EA
Cambridge
Application reference : 20/01640/REM
-
Allowing motorcycles in bus lanes
The County Council would like to know our opinion on allowing motorcycles to use bus lanes.
Motorcycling has become increasingly popular as it is a cheaper alternative than travelling by car, it provides independence and mobility and reduces journey times and emissions on congested roads.
As part of the climate change strategy action plan, the County Council at its meeting on 19th December 2019, agreed to consult on the use of bus lanes for motorcycles and scooters, collectively referred to as powered-two-wheelers.
Over 30 UK towns and cities permit motorcycles in bus lanes since the original trials in London back in 2009 and 2011 demonstrated reduced journey times and environmental benefits with no significant safety issues for motorcyclists or other vulnerable road users.
We would therefore welcome your views on whether you support the use of bus lanes by powered-two-wheelers, these together with any additional comments should be sent in writing to the undersigned or by email to policyandregulation@cambridgeshire.gov.uk by 10th April 2020 quoting reference PTWBus.
The feedback we receive will help us understand the level of support for the scheme.
-
Coldham's Lane/New St/Retail Park
Hard to exit from New St onto Coldham's Lane. Difficult to negotiate the retail park roundabout.
-
Newmarket Road/Elizabeth Way roundabout
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
-
Bridge Street
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Chisholm Trail
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
-
NCN route 11 and the Waterbeach Gap
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
-
Safer Walking and Cycling between NW Cambridge and Girton
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1sI’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafetyThe petition:
http://www.ipetitions.com/petition/EddingtonSafetyAnyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.ukRegius Professor of Engineering,
Cambridge University Engineering DepartmentAuthor of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/Girton resident and parent.
Cambridge Cycling Campaign Member -
Lack of cycle routes to Cambridge Business Park, Waterbeach
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
-
Bar Hill to Cambridge Cycleway
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
-
Reach Fair Ride
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.htmlI've created this issue to help plan this event.
-
Replace Hooper Street gates with bollard
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
-
Dangerous to cross Milton Road diagonally at Toucan crossing
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
-
A14 very hostile for cycling
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
-
Parking policy review
The County appointed an officer back in June to review parking policy across the County, starting with the City.
-
The 'Milton Road Effect'
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
-
Upgrading Milton Road to Dutch standards
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
-
Cottenham to Histon Cycleway
The Cottenham to Histon cycleway needs improvement.
-
Improved cycling facilities on A603 in Barton
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
-
Poor exit from West Cambridge site onto Clerk Maxwell Road
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
-
State of Waterbeach-Lode link
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
-
Emmanuel College 12/0029/FUL
Starting a thread about this application here so we can continue on from the previous planning list discussion.
-
Northstowe Planning Application
Major planning application here - c. 10,000 homes
-
Railway Route between Cambridge and Cherry Hinton
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
-
Landbeach to Cambridge Cycleway
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
-
Should Cambridge 'Go Dutch' (or Danish)
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
-
Girton Interchange "Improvements"
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
-
Proper cycle provision on Cherry Hinton Road needed
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
-
Evil posts on busway cycleway
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
-
Cambridge Cycling Campaign's "Project Orange"
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)