Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:

  • Survival Skills for Cyclists course - 25/3/23

    Created by David Green // 1 thread

    Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.

    No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:

    "Excellent - would recommend it to all inexperienced riders."
    "Following the course I really feel I understand the workings of my cycle."
    "It was very clearly explained and covered very useful topics."
    "Thoroughly informative workshop. To be highly recommended."

    David Green

    ===

    Survival Skills for Cyclists

    Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
    Date: Sat 25 March 2023, 10am to 4 pm

    Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.

    Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.

    Refreshments: hot and cold drinks provided, but please bring your own lunch!

    Fee:  £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.

    Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.

    Please sign in to vote.
  • St John's Innovation Centre - Vitrum building

    sound+fury // 1 thread

    22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS

    Please sign in to vote.
  • Traffic calming controls don’t leave room for cargo trikes in cycle lanes

    Created by Robert Watson // 1 thread

    Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.

    (In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)

    Please sign in to vote.
  • Cycle path at junction of Trumpington and Brooklands problematic for trikes

    Created by Robert Watson // 1 thread

    On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:

    1. The path is quite narrow, and in one place there is a sign post. This path is quite narrow for use with a cargo trike even if no one else is on the path -- but if there are cyclists (especially cargo bikes/trikes) going in the other direction, the path is simply too narrow. Most of the time cyclists or pedestrians wait for one another, but this doesn’t always happen.
    2. The camber on the path is extremely steep, especially where there is a cut to allow cycles up off of Brooklands going east. Trikes are at substantial risk of tipping, especially if there isn’t a child or cargo in the trike and the centre of gravity is high.

    Please sign in to vote.
  • East Road wands too narrow at first

    Created by PHG // 1 thread

    Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.

    Please sign in to vote.
  • East Road wands block roundabout

    Created by PHG // 1 thread

    The new wands on East road force cyclists on to the pavement, rather than the roundabout, where East road meets Newmarket roundabout. Why should cyclists be blocked from using Newmarket roundabout, which is the easiest way to access the bus lane on Elizabeth Way bridge.

    Pulling out of the wands early is dangerous and annoying. more annoying is when you forget and have to stop, or go onto the pavement and round to use the ramp.

    Please sign in to vote.
  • Potential conflict between Perne Rd and Tiverton Way .

    Created by cpax // 3 threads

     Like many other cyclists the majority being school pupils I have used the road between Perne Road and Tiverton Way as a way to avoid the traffic on Birdwood Road , however recently the work has begun to convert the bungalow and  often with builders vehicles blocking the cycle path on Perne Road . Today I encountered a group of people gathered ( deep in discussion ) in the road adjacent to the empty site which lies closer to Tiverton Way and on hearing my cycle bell seemed reluctant to move . I am concerned that this could be a site for future conflict .

    Please sign in to vote.
  • Combined Authority - Audit and Governance Committee

    Created by Rosamund Humphrey (Admin Officer) // 1 thread

    The Audit and Governance Committee's role is to review the Combined Authority's financial affairs, internal control, corporate governance arrangements and risk management. The Audit and Governance Committee was established by the Combined Authority in March 2017 in accordance with the Combined Authorities Order 2017. The committee is made up of one member from each of the constituent councils of the Cambridgeshire and Peterborough Combined Authority. 

    Please sign in to vote.
  • Herbert St - bollards after roadworks

    Sam // 1 thread

    The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.

    Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement... 

    Please sign in to vote.
  • Sawston/Babraham cycleway closure 2022-09-15 for 3.5 weeks

    Created by Matthew // 1 thread

    We've received a note from a concerned resident:

    Not too sure if this has been informed of this but the Sawston to Babraham CyclePath is planned to be closed by a commercial property developer on 15th Sept. Don't know when it'll reopen. All cyclists will be forced to cycle on the main road that is a pretty hairy affair at the best of times. They did this already for 2 days back in August without any consultation. The cyclepath has become very popular in the last few years as many employees from the Babraham and Granta Parks use it for commuting. Also it's relatively new so can't believe that private developers are allowed to shut it basically to use it as a free convenient storage area.

    Please sign in to vote.
  • Unlit post hazard

    Created by Tim Steele // 0 threads

    Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.

    Please sign in to vote.
  • Dangerous to cross Milton Road diagonally at Toucan crossing

    Created by Matt H // 2 threads

    As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.

    This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.

    Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident. 

    Please sign in to vote.
  • Long wait to cross Busway / Station Road, Histon

    Created by Matt H // 1 thread

    Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.

    This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top