This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:

  • loose surface on busway path

    Richard G // 1 thread

    There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R

    Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.

    I cant see anywhere, who to contact about removing all the loose material.

    Anyone know a good point of contact to report to?

    thanks, Richard

    Please sign in to vote.
  • 17/1527/NMA1 213 Mill Road - including changes to cycle parking

    Created by Matthew // 1 thread

    Non-material amendment on application 17/1527/FUL to include changes to Dutch's Corner, townhouses, Mews houses and landscape. Dutch's Corner changes are as follows: raised height of dormer, omission of 3 rooflights, fenestration changes and removal of recess on Ross Street elevation. Townhouse changes are as follows: reconfiguration of rooflights, reduction in bay window depth, 175mm increase to wall and internal changes. Mew houses changes are as follows: fenestration changes, amended position of house, step in roof height relocated, reduced green roof area, amendments to size of basement and front courtyards, relocated cycle store. 5 new trees omitted.

    213 Mill Road Cambridge CB1 3BE

    Cambridge

    Application reference : 17/1527/NMA1

    Please sign in to vote.
  • Four Lamps roundabout

    Created by Matthew // 2 threads

    The Four Lamps roundabout at the junction of Victoria Avenue, Jesus Lane, Maid's Causeway, Short Street and King Street was built when traffic flows were anticipated to be much higher than they actually are today.

    Please sign in to vote.
  • 19/1056/REM Darwin Green BDW2

    Created by Matthew // 1 thread

    Reserved Matters application for second housing phase (known as BDW2) including 330 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 18, 26, 27, 29, 35, 40, 49, 52, 58, 62, 63, and 66 pursuant to outline approval 07/0003/OUT and use of the Pavilion building for Use Classes A1 (shops), A3 (restaurants and cafes), A4 (drinking establishments), A5 (hot food takeaways).

    Land Between Huntingdon Road And Histon Road, Cambridge Known As "Darwin Green One"

    Cambridge

    Application reference : 19/1056/REM

    Please sign in to vote.
  • 19/1070/REM AstraZeneca New Cambridge Site Phase 1B

    Created by Matthew // 1 thread

    Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.

    Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA

    Cambridge

    Application reference : 19/1070/REM

    Please sign in to vote.
  • 19/1010/FUL 1 Godestone Road - Ground floor retail & 12 1-BR dwellings

    Created by Matthew // 1 thread

    19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=PUSKF9DXFNL00

    Please sign in to vote.
  • A14 Roundabout J32 Works

    Created by Joe Adam // 1 thread

    The A14 works have closed the east side pavement/cyclepath for some amount of time.

    This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe.  Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.

    Please sign in to vote.
  • S/2549/19/RM Cottenham - 200 houses off Rampton Road

    Created by Matthew // 1 thread

    Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.

    Land Off, Rampton Road, Cottenham, Cambridgeshire

    South Cambridgeshire

    Application reference : S/2549/19/RM

    Please sign in to vote.
  • Cottenham road

    Tom McKeown // 1 thread

    The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.

    Please sign in to vote.
  • 19/0983/LBC alterations to 6 Malcolm Street

    sound+fury // 1 thread

    The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.

    Please sign in to vote.
  • Nightingale Avenue cycle route

    Created by wookey // 1 thread

    Nightingale Avenue should be a major cycle route between the biomedical campus (via Red Cross Lane) and Queen Ediths in general and places beyond. It is the natural route for many people, for example between Trumpington/Shelford/Sawston and numerous schools, Cherry Hinton/Arm etc. It is already quite well-used but could be much better with some dedicated infrastructure.

    Please sign in to vote.
  • Data from new smart traffic sensors available

    Created by Jon Warbrick // 1 thread

    Cambridgeshire Insight have just released data from a set of 'smart' traffic sensors installed to monitor the effect of the Mill Road bridge closure: https://data.cambridgeshireinsight.org.uk/story/monitoring-impact-mill-road-bridge-closure

    This data is particularly interesting because it provides classified counts of pedestrians, cyclists and various classes of motor vehicle in both directions across 15 locations in Cambridge. 

    Please sign in to vote.
  • 19/0698/FUL 25A Mowbray Road - conversion/extension of house into 7 units

    Created by Matthew // 1 thread

    Conversion and extension of 3 bed detached dwelling into 2 x 2-bed and 3 x 1-bed apartments including a part 3 storey, part 2 storey and part single storey rear extension incorporating balconies on 1st and 2nd floor, extension to roof from hip to gable, conversion of garage to living space and associated alterations. Erection of bin and cycle storage in front garden.

    25A Mowbray Road Cambridge CB1 7SR

    Cambridge

    Application reference : 19/0698/FUL

    Please sign in to vote.
  • Hills Road from Station Road to Brooklands Ave

    Created by Matthew // 1 thread

    The central portion of Hills Road seems to be a kind of 'forgotten' area, with nothing more than narrow mandatory cycle lanes in miserable shape, and terrible junction design for people walking and cycling.

    If GCP is looking for an area that needs improvement, this is one that needs doing, and it is fairly central and high-profile.

    Please sign in to vote.
  • 19/0830/FUL 4 Huntingdon Road - from 8 to 9 bedroom guest house + cycle parking

    Created by Matthew // 1 thread

    Change of use from 8 bedroom guest house (Use C1) to 9 bedroom guest house (Use C1) and associated refurbishment works including:- installation of roof lights, replacement canopy, installation of railings and dwarf wall to front elevation and cycling parking.

    4 Huntingdon Road Cambridge CB3 0HH

    Cambridge

    Application reference : 19/0830/FUL

    Please sign in to vote.
  • Traffic management works that are bad for cyclists and pedestrians

    Created by Cllr Ian Manning // 8 threads

    I've recently moved to be the Lib Dem lead on the County Council's Highways & Infrastructure committee.

    I want to start working through in detail bad and good TM examples with officers to understand whether it's specific sets of contractors that are poor, whether they aren't compliant with the current policy and/or whether I agree with our officers about whether they are.

    For this I need a Cambridgeshire wide list of both good and bad, with locations - so it would be good to get some from Cambridge and other nearby Cycle Campaigns.

    Please sign in to vote.