Active Travel in Histon & Impington
Group looking at issues for active travel in the villages of Histon and Impington.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Tom McKeown // 3 threads
Group looking at issues for active travel in the villages of Histon and Impington.
28,954 sqm (GIA) of research and development (B1(b)) use including ancillary office accommodation, clean room, support space, plant and equipment: two level basement incorporating 406 car parking spaces (14,314 sqm GIA); central utilities building (5,245 sqm GIA); an external storage building (480 sqm GIA); cycle parking, surface disabled and visitor car parking (16 spaces), access, drainage and servicing infrastructure and associated landscaping.
Former Spicers site, Sawston Bypass, Sawston, Cambridge, Cambridgeshire, CB22 3JG
South Cambridgeshire
Application reference : S/2122/19/FL
19/0819/OUT | Demolition of 51-55 Elizabeth Way and construction of a new two & a half storey block of flats comprising nine apartments, associated amenity space and cycle parking provision (outline application -layout, scale and access not reserved) | 51 - 55 Elizabeth Way Cambridge Cambridgeshire CB4 1DB
Created by Daniel Dignam // 1 thread
Busway will be closed 22-Jun to 8-Jul, A14 bridge improvements.
Erection of 4no. 1-bedroom flats on land to the rear with bin and cycle stores, following demolition of existing garage.
32 & 32A Gray Road Cambridge CB1 3TA
Cambridge
Application reference : 19/0683/FUL
Overarching issue for plans regarding the Bourn Airfield development, expecting 3,500 homes and services, public transport, walking and cycling links.
Non-material amendment on application 11/0161/REM for re-alignment of short section of approved strategic cycleway to provide a link between the existing shared surface road east of the Bovis housing parcel and the cycle path adjacent to Addenbrooke's Road.
Land West Of Hobson's Brook Adjacent To Royal Showground, And Land South Of The Addenbrooke's Access Road. Land Between Long Road And Shelford Road (Clay Farm/Showground Site), Cambridge, Cambridgeshire Cambridge Cambridgeshire
Cambridge
Application reference : 11/0161/NMA1
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 5x studio apartments and 6x 1-bed units.
Chartwell House 620 - 622 Newmarket Road Cambridge Cambridgeshire CB5 8LP
Cambridge
Application reference : 19/0767/B1C3
Demolition of 150 Cambridge Road and replacing with 5 no. flats and 1 no. detached house
150, Cambridge Road, Great Shelford, Cambridge, Cambridgeshire, CB22 5JU
South Cambridgeshire
Application reference : S/1781/19/FL
Tom McKeown // 1 thread
New South Cambridgeshire Police station proposed for land adjacent to Milton Park & Ride.
19/0729/FUL | Demolition of existing dwelling and redevelopment to provide 10no. residential units arranged within two blocks, together with access, car parking, landscaping and associated infrastructure. | 322 And Land Rear Of 324 Histon Road Cambridge Cambridgeshire CB4 3HT
19/0718/REM | Reserved matters (layout, scale, appearance and landscaping) for the erection of 27 residential units including affordable dwellings following demolition of existing buildings together with associated infrastructure pursuant to application 15/0519/OUT. | 295 - 301 Histon Road Cambridge Cambridgeshire CB4 3NF
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/1605/16/OL for up to 70 dwellings comprising of 42 market and 28 affordable units, public open space, children's play area, associated landscaping and new access.
Land to the rear of 130, Middle Watch, Swavesey, Cambs, CB24 4RP
South Cambridgeshire
Application reference : S/1896/19/RM
19/0720/FUL | Change of use to A4 (Drinking establishment), use of external space for outdoor seating and installation of lighting and signage to front and side elevation. | Unit 2 Cambridge Railway Station Station Road Cambridge Cambridgeshire CB1 2JH
Part two storey, part first floor rear extension and conversion of terrace house to 4no. 1-bed flats.
156 Mill Road Cambridge CB1 3LP
Cambridge
Application reference : 19/0709/FUL
Erection of 9 x 1-bed apartments, including bin and cycle storage facilities together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building.
Land Rear Of 56 - 58 Cherry Hinton Road Cambridge Cambridgeshire CB1 7AQ
Cambridge
Application reference : 19/0687/FUL
sound+fury // 1 thread
Non material amendment of outline planning permission S/2682/13/OL
Land North of, NEWMARKET ROAD, CAMBRIDGESHIRE
South Cambridgeshire
Application reference : S/1610/19/NM
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The site at Newbury Farm has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
This Land is drawing up outline plans for the development of c. 230 new homes at Newbury Farm, located to the south of Worts’ Causeway and to the north of Babraham Road in Cambridge. The site has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
Created by Al Storer // 1 thread
Marshalls Aerospace are to close Cambridge Airport and relocate. This creates a massive area for new development.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1340/19/DC&theTabNo=3
Discharge of conditions 32 (footway/cycleway Oakington Road) 33 (widening of existing footway/cycleway Oakington Road), 34 (Widening of existing footway/cycleway Rampton Road) and 35 (Improvements of bus stop) of planning permission S/1606/16/OL for outline planning permission for the erection of up to 126 dwellings, formation of a new vehicular & pedestrian access onto Oakington Road and associated infrastructure and works (All matters reserved apart from access).
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Robin Heydon // 2 threads
GCP should be applying for the second Tranche. This was discussed at the May monthly meeting where we created a list of possible schemes. This issue is designed to both create additional items for this list, and also expand on the needs of each of these items.
Martin Lucas-Smith // 1 thread
Cambridge University is planning to refurbish 1 Regent Street for its Cambridge Institute for Sustainability Leadership (CISL).
Currently there are very anti-cycling 'No cycle parking' notices along the railings, which is hardly an example of sustainability leadership.
We should use this as an opportunity to get cycle parking along here.
Created by Matthew // 1 thread
Application for approval of all reserved matters (appearance, landscaping, access, layout and scale) for 73 dwellings following outline planning permission S/0388/12/OL .
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1355/19/RM&theTabNo=3
Land south east of the B1050 at Station Road, Parcel H8, Phase 1, Northstowe, Longstanton, Cambs
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)