19/0709/FUL 156 Mill Road - conversion to 4 flats
Part two storey, part first floor rear extension and conversion of terrace house to 4no. 1-bed flats.
156 Mill Road Cambridge CB1 3LP
Cambridge
Application reference : 19/0709/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Part two storey, part first floor rear extension and conversion of terrace house to 4no. 1-bed flats.
156 Mill Road Cambridge CB1 3LP
Cambridge
Application reference : 19/0709/FUL
Erection of 9 x 1-bed apartments, including bin and cycle storage facilities together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building.
Land Rear Of 56 - 58 Cherry Hinton Road Cambridge Cambridgeshire CB1 7AQ
Cambridge
Application reference : 19/0687/FUL
sound+fury // 1 thread
Non material amendment of outline planning permission S/2682/13/OL
Land North of, NEWMARKET ROAD, CAMBRIDGESHIRE
South Cambridgeshire
Application reference : S/1610/19/NM
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The site at Newbury Farm has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
This Land is drawing up outline plans for the development of c. 230 new homes at Newbury Farm, located to the south of Worts’ Causeway and to the north of Babraham Road in Cambridge. The site has been allocated for housing development by Cambridge City Council in the Cambridge Local Plan 2018 (known as site ‘GB2’).
Created by Al Storer // 1 thread
Marshalls Aerospace are to close Cambridge Airport and relocate. This creates a massive area for new development.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1340/19/DC&theTabNo=3
Discharge of conditions 32 (footway/cycleway Oakington Road) 33 (widening of existing footway/cycleway Oakington Road), 34 (Widening of existing footway/cycleway Rampton Road) and 35 (Improvements of bus stop) of planning permission S/1606/16/OL for outline planning permission for the erection of up to 126 dwellings, formation of a new vehicular & pedestrian access onto Oakington Road and associated infrastructure and works (All matters reserved apart from access).
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Robin Heydon // 2 threads
GCP should be applying for the second Tranche. This was discussed at the May monthly meeting where we created a list of possible schemes. This issue is designed to both create additional items for this list, and also expand on the needs of each of these items.
Martin Lucas-Smith // 1 thread
Cambridge University is planning to refurbish 1 Regent Street for its Cambridge Institute for Sustainability Leadership (CISL).
Currently there are very anti-cycling 'No cycle parking' notices along the railings, which is hardly an example of sustainability leadership.
We should use this as an opportunity to get cycle parking along here.
Created by Matthew // 1 thread
Application for approval of all reserved matters (appearance, landscaping, access, layout and scale) for 73 dwellings following outline planning permission S/0388/12/OL .
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1355/19/RM&theTabNo=3
Land south east of the B1050 at Station Road, Parcel H8, Phase 1, Northstowe, Longstanton, Cambs
Change of use from restaurant and associated staff accommodation to bed and breakfast (20no rooms) with Managers flat.
11 Napier Street Cambridge CB1 1HR
Cambridge
Application reference : 18/1520/FUL
Redevelopment of existing bus turning head and redundant service area to provide new hotel and ancillary restaurant (Use Class C1), new public realm (urban park) and landscape improvements together with associated highway works to East Road providing new bus stops, pedestrian and cycle routes.
Grafton Centre Fitzroy Street Cambridge CB1 1PS
Cambridge
Application reference : 19/0512/FUL
Erection of 2no. 2-bed dwellings with associated access, car parking and landscaping following demolition of existing garage.
Land Rear Of 305-307 Milton Road Cambridge Cambridgeshire CB4 1XQ
Cambridge
Application reference : 19/0515/FUL
Created by Jon Warbrick // 1 thread
Contractors are currently rebuilding the section of the Stapleford to Sawston cycleway (part of NCN11) between Sawston traffic lights and the junction with the Sawston Bypass. This isn't a problem in itself and is welcome but it is a bit surprising - while this section of the path was uneven in places and rather narrow it was still better that much provision elsewhere (including elsewhere on this cycleway). It looks like it part of this.
Unit 330 is a circa 30,000 sq. ft over 2, 330 , Cambridge Science Park, Milton, CB4 0WN
First Floor front extension. Window and external door renewal. External repairs to existing area of hard and soft landscaping. Reduction of car parking spaces and provision of new bin store and cycle shelter.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0874/19/FL&theTabNo=3
(location is approximate)
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of two new private residential blocks comprising 158 student rooms and associated facilities
Planning Application Ref:
S/3983/18/FL
Registration Date:
20-Sep-2018
Decision Date:
Application Type:
Full Planning (Small Major)
Determination Extension:
20-Jan-2019
Parish:
Orchard Park CP
Main Location:
Western side of Land Parcel COM 4 Orchard Park, Neal Drive, Cambridge
Full Description:
Erection of two new private residential blocks comprising 158 student rooms and associated facilities
Status:
Out for Consultation
Outline application for planning permission with all matters other than access reserved, for the development of up to 50 residential dwellings and a Community Park to provide recreation and leisure facilities, including a community building, and associated works.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1312/19/OL
Outline planning permission with some matters reserved except for appearance for the redevelopment of the former Gestamp factory site at Bourn Airfield for up to 24,620sqm/265,000sqft GEA of commercial floorspace (B1c light industry and B8 warehouse), associated car parking and service yards, external works and landscaping
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1031/19/OL&theTabNo=3
Created by Matthew // 1 thread
Discussion of potential improvements for walking and cycling in Madingley village.
Created by Sam Webster // 1 thread
Cambridge Biomedical Campus Transport Needs Review report came out a couple of weeks ago. Whilst some of it is good, I think the cycling stuff is poor in general:
I propose complaining about the standard of the cycling part of the report.
Rather pitiful looking front 'garden' with some things sticking out of the wall supposedly providing eight cycle parking spaces. Note that the photograph included in the D&A statement seems to show 'no cycles' signs plastered on the same wall.
...
Change of use to a large HMO (sui generis use class) with seven bedrooms serving seven people.
62 Silverwood Close Cambridge CB1 3HA
Cambridge
Application reference : 19/0389/FUL
What appears to be two Sheffield stands in the garden. The spacing is only 70cm. They are uncovered. The exterior door appears to be 90cm.
...
Erection of a two bed dwelling to the rear following demolition of existing garage.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 19/0379/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline Application for the erection of up to 28,000sqm of mixed B1 (a) offices, B1 (b) research and development, B1 (c) light industrial, B2 general industrial, B8 storage and distribution, and A1/A3 amenity café, with all matters reserved (Access from Beech Road, Appearance, Landscaping, Layout and Scale)
Land To The West Of Cambridge Research Park, Beach Drive, Landbeach, CB25 9TL
South Cambridgeshire
Application reference : S/4615/18/OL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Michael Cahn // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by cobweb // 33 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Michael Cahn // 2 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by Michael Cahn // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Michael Cahn // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Created by Al Storer // 1 thread
The new road between Addenbrooke's Road and Robinson Way has some poor design features.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Martin Lucas-Smith // 16 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November