Marshalls Aerospace relocation- massive new development area
Marshalls Aerospace are to close Cambridge Airport and relocate. This creates a massive area for new development.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Al Storer // 1 thread
Marshalls Aerospace are to close Cambridge Airport and relocate. This creates a massive area for new development.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1340/19/DC&theTabNo=3
Discharge of conditions 32 (footway/cycleway Oakington Road) 33 (widening of existing footway/cycleway Oakington Road), 34 (Widening of existing footway/cycleway Rampton Road) and 35 (Improvements of bus stop) of planning permission S/1606/16/OL for outline planning permission for the erection of up to 126 dwellings, formation of a new vehicular & pedestrian access onto Oakington Road and associated infrastructure and works (All matters reserved apart from access).
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Robin Heydon // 2 threads
GCP should be applying for the second Tranche. This was discussed at the May monthly meeting where we created a list of possible schemes. This issue is designed to both create additional items for this list, and also expand on the needs of each of these items.
Martin Lucas-Smith // 1 thread
Cambridge University is planning to refurbish 1 Regent Street for its Cambridge Institute for Sustainability Leadership (CISL).
Currently there are very anti-cycling 'No cycle parking' notices along the railings, which is hardly an example of sustainability leadership.
We should use this as an opportunity to get cycle parking along here.
Created by Matthew // 1 thread
Application for approval of all reserved matters (appearance, landscaping, access, layout and scale) for 73 dwellings following outline planning permission S/0388/12/OL .
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1355/19/RM&theTabNo=3
Land south east of the B1050 at Station Road, Parcel H8, Phase 1, Northstowe, Longstanton, Cambs
Change of use from restaurant and associated staff accommodation to bed and breakfast (20no rooms) with Managers flat.
11 Napier Street Cambridge CB1 1HR
Cambridge
Application reference : 18/1520/FUL
Redevelopment of existing bus turning head and redundant service area to provide new hotel and ancillary restaurant (Use Class C1), new public realm (urban park) and landscape improvements together with associated highway works to East Road providing new bus stops, pedestrian and cycle routes.
Grafton Centre Fitzroy Street Cambridge CB1 1PS
Cambridge
Application reference : 19/0512/FUL
Erection of 2no. 2-bed dwellings with associated access, car parking and landscaping following demolition of existing garage.
Land Rear Of 305-307 Milton Road Cambridge Cambridgeshire CB4 1XQ
Cambridge
Application reference : 19/0515/FUL
Created by Jon Warbrick // 1 thread
Contractors are currently rebuilding the section of the Stapleford to Sawston cycleway (part of NCN11) between Sawston traffic lights and the junction with the Sawston Bypass. This isn't a problem in itself and is welcome but it is a bit surprising - while this section of the path was uneven in places and rather narrow it was still better that much provision elsewhere (including elsewhere on this cycleway). It looks like it part of this.
Unit 330 is a circa 30,000 sq. ft over 2, 330 , Cambridge Science Park, Milton, CB4 0WN
First Floor front extension. Window and external door renewal. External repairs to existing area of hard and soft landscaping. Reduction of car parking spaces and provision of new bin store and cycle shelter.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0874/19/FL&theTabNo=3
(location is approximate)
Created by Roxanne (CEO) // 1 thread
Erection of two new private residential blocks comprising 158 student rooms and associated facilities
Planning Application Ref:
S/3983/18/FL
Registration Date:
20-Sep-2018
Decision Date:
Application Type:
Full Planning (Small Major)
Determination Extension:
20-Jan-2019
Parish:
Orchard Park CP
Main Location:
Western side of Land Parcel COM 4 Orchard Park, Neal Drive, Cambridge
Full Description:
Erection of two new private residential blocks comprising 158 student rooms and associated facilities
Status:
Out for Consultation
Outline application for planning permission with all matters other than access reserved, for the development of up to 50 residential dwellings and a Community Park to provide recreation and leisure facilities, including a community building, and associated works.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1312/19/OL
Outline planning permission with some matters reserved except for appearance for the redevelopment of the former Gestamp factory site at Bourn Airfield for up to 24,620sqm/265,000sqft GEA of commercial floorspace (B1c light industry and B8 warehouse), associated car parking and service yards, external works and landscaping
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1031/19/OL&theTabNo=3
Created by Matthew // 1 thread
Discussion of potential improvements for walking and cycling in Madingley village.
Created by Sam Webster // 2 threads
Cambridge Biomedical Campus Transport Needs Review report came out a couple of weeks ago. Whilst some of it is good, I think the cycling stuff is poor in general:
I propose complaining about the standard of the cycling part of the report.
Rather pitiful looking front 'garden' with some things sticking out of the wall supposedly providing eight cycle parking spaces. Note that the photograph included in the D&A statement seems to show 'no cycles' signs plastered on the same wall.
...
Change of use to a large HMO (sui generis use class) with seven bedrooms serving seven people.
62 Silverwood Close Cambridge CB1 3HA
Cambridge
Application reference : 19/0389/FUL
What appears to be two Sheffield stands in the garden. The spacing is only 70cm. They are uncovered. The exterior door appears to be 90cm.
...
Erection of a two bed dwelling to the rear following demolition of existing garage.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 19/0379/FUL
Created by Roxanne (CEO) // 1 thread
Outline Application for the erection of up to 28,000sqm of mixed B1 (a) offices, B1 (b) research and development, B1 (c) light industrial, B2 general industrial, B8 storage and distribution, and A1/A3 amenity café, with all matters reserved (Access from Beech Road, Appearance, Landscaping, Layout and Scale)
Land To The West Of Cambridge Research Park, Beach Drive, Landbeach, CB25 9TL
South Cambridgeshire
Application reference : S/4615/18/OL
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Created by Roxanne (CEO) // 1 thread
External works including parking reconfiguration and new pedestrian crossing; new shopfront to western elevation; reconfiguration of rear ramped access; creation of three door openings; formation of loading bay; and raised plant deck.
Unit 10 Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 19/0347/FUL
They are proposing to expand the car park by adding 45 car parking spaces along the service road that crosses the Tins.
Transport Statement section 5.2.5 describes a set of measures to create proper visibility splays at the crossing of the Tins and reinforce the give-way markings for drivers. This sounded great...
However, Appendix D several diagrams and some of them show give-way markings being painted on the cycleway in addition to the service road.
In contrast, the existing situation is that the Tins is continuous and the give-way markings are painted on the service road.
This may only be a mistake in some of the diagrams, it does not appear to be mentioned in the text, but we must object that these diagrams show an interruption of the Tins and a degradation of the cycleway.
...
19/0358/FUL | Car park extension to provide 45no. new parking spaces. | 21-25 Coldhams Business Park Norman Way Cambridge CB1 3LH
Created by Jonathan Gough // 1 thread
I've read that there are to be roadworks on the B1049 in Histon at the Green, which means temporary traffic lights and the closure of the end of Impington Lane. I can't find many details but the local HisImp News paper says it is starting 8th April for 8 weeks.
I'm concerned about cycle & pedestrian access to Impington Lane from the B1049 during this period and whether access will have been fully considered. Turning onto Impington Lane coming from the South normally quite dangerous as the road is narrow (hopefully to be improved by the works!)
Martin Lucas-Smith // 1 thread
Erection of student accommodation with 154 student rooms (following demolition of existing buildings). Together with ancillary accommodation comprising common/study rooms, laundry room, management office, plant room, bin and bicycle enclosures, landscaping and associated infrastructure including a Sub-Station.
John Banks Honda 444 Newmarket Road Cambridge Cambridgeshire CB5 8JL
Cambridge Application reference: 19/0340/FUL
Created by Jacob Bramley // 1 thread
This appears to be a busy crossing, and is used by parents and children heading to and from the school, both by cycle and on foot.
The chicane barriers make it difficult to cross here with a standard bicycle, let alone a cargo bike or trailer. The cross-hatched area is much more practical to use than the island, but leaves users exposed on a fast road, especially considering that primary-school children are likely to be using this facility.
On the western side, there is nowhere to wait to cross, so riders with large cycles an trailers have to block the path for other users whilst they wait to cross.
This is outside the area of the Cherry Hinton North development, but both motor and cycle traffic through here is likely to increase when that is completed, so it is somewhat related.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)