Land south of Coldham's Lane (2023)
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
sound+fury // 1 thread
Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).
163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN
Cambridge
Application reference : 23/03068/FUL
Created by Josh Grantham // 1 thread
The signalised crossing of The Fen Causeway is up for renewal. We've been asked for comment
Created by Josh Grantham // 1 thread
23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A project from Greater Cambridge Shared Planning to inform urban design.
Created by Josh Grantham // 1 thread
23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
sound+fury // 1 thread
Change of use from an office (Use Class E(g)(i)) to a state funded school (Use Class F1(a))
72 Hills Road Cambridge Cambridgeshire CB2 1LA
Cambridge
Application reference : 23/02904/PRIOR
Created by sarah // 0 threads
General overgrowth impinging on DNA path link to CBC; 2 bikes can no longer pass each other. Reported to CCC on 31st July.
Anon // 1 thread
Towards the west end of Love Lane, vegetation overhanging from the south does not allow an adult to pass (on foot or cycle) without bending. (Photo is looking west.)
Noticed on 13 July, confirmed still there 20 July.
Reported to Cambridgeshire County Council 19 July (ref 00438005). They closed the report 24 July, saying "The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action."
(This area has been problematic previously -- see KW's reporting in March 2023 on the 'exclusionary barriers' thread. Not sure if exactly the same vegetation, but same general area.)
sound+fury // 1 thread
i) Demolition of 11-12 Burleigh Street and Abbeygate House, ii) Part demolition and alterations to the Grafton Centre, removal of existing facades, erection of new floorspace for life science use, new and replacement façades and shopfronts, provision of terraces at fourth floor level, installation of plant and enclosures, iii) Redevelopment of existing bus turning head and redundant service area to provide new hotel and leisure quarter, iv) New pedestrian access route from Christchurch Street to Burleigh Street, provision of cycle parking spaces, public realm and landscape improvements, v) Highway works to East Road providing new bus stops, pedestrian and cycle routes and other associated works.
Grafton Centre Fitzroy Street Cambridge Cambridgeshire
Cambridge
Application reference : 23/02685/FUL
Created by jack // 1 thread
The bushes/trees are pretty overgrown into the left side of the cycle path, meaning you have to move away from the edge at points, on an already narrow cycle track (fairly narrow for bidirectional travel, anyway).
sound+fury // 1 thread
Concern about the bike/bin store for the CONDA application.
Created by Roxanne (CEO) // 1 thread
Cambridge City Council has launched its Environmental Improvement Programme (EIP) for 2024, which gives residents the opportunity to identify where they would like the council to fund small-scale improvements to the city’s streets and open spaces.
Cambridge residents are invited to put forward their ideas for the EIP through the council's online consultation platform. A total of £170,000 is available to be allocated to the proposed projects – up to £5,000 is available for local projects unless they are strongly supported in which case up to £10,000 could be made available. Up to £20,000 is available for projects that will enhance larger areas of the city.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Roxanne (CEO) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?