Land south of Coldham's Lane (2023)
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
sound+fury // 1 thread
Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).
163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN
Cambridge
Application reference : 23/03068/FUL
Created by Josh Grantham // 1 thread
The signalised crossing of The Fen Causeway is up for renewal. We've been asked for comment
Created by Josh Grantham // 1 thread
23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A project from Greater Cambridge Shared Planning to inform urban design.
Created by Josh Grantham // 1 thread
23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
sound+fury // 1 thread
Change of use from an office (Use Class E(g)(i)) to a state funded school (Use Class F1(a))
72 Hills Road Cambridge Cambridgeshire CB2 1LA
Cambridge
Application reference : 23/02904/PRIOR
Created by sarah // 0 threads
General overgrowth impinging on DNA path link to CBC; 2 bikes can no longer pass each other. Reported to CCC on 31st July.
Anon // 1 thread
Towards the west end of Love Lane, vegetation overhanging from the south does not allow an adult to pass (on foot or cycle) without bending. (Photo is looking west.)
Noticed on 13 July, confirmed still there 20 July.
Reported to Cambridgeshire County Council 19 July (ref 00438005). They closed the report 24 July, saying "The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action."
(This area has been problematic previously -- see KW's reporting in March 2023 on the 'exclusionary barriers' thread. Not sure if exactly the same vegetation, but same general area.)
sound+fury // 1 thread
i) Demolition of 11-12 Burleigh Street and Abbeygate House, ii) Part demolition and alterations to the Grafton Centre, removal of existing facades, erection of new floorspace for life science use, new and replacement façades and shopfronts, provision of terraces at fourth floor level, installation of plant and enclosures, iii) Redevelopment of existing bus turning head and redundant service area to provide new hotel and leisure quarter, iv) New pedestrian access route from Christchurch Street to Burleigh Street, provision of cycle parking spaces, public realm and landscape improvements, v) Highway works to East Road providing new bus stops, pedestrian and cycle routes and other associated works.
Grafton Centre Fitzroy Street Cambridge Cambridgeshire
Cambridge
Application reference : 23/02685/FUL
Created by jack // 1 thread
The bushes/trees are pretty overgrown into the left side of the cycle path, meaning you have to move away from the edge at points, on an already narrow cycle track (fairly narrow for bidirectional travel, anyway).
sound+fury // 1 thread
Concern about the bike/bin store for the CONDA application.
Created by Roxanne (CEO) // 1 thread
Cambridge City Council has launched its Environmental Improvement Programme (EIP) for 2024, which gives residents the opportunity to identify where they would like the council to fund small-scale improvements to the city’s streets and open spaces.
Cambridge residents are invited to put forward their ideas for the EIP through the council's online consultation platform. A total of £170,000 is available to be allocated to the proposed projects – up to £5,000 is available for local projects unless they are strongly supported in which case up to £10,000 could be made available. Up to £20,000 is available for projects that will enhance larger areas of the city.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)