22/00145: 2no class e units & 9no flats. 56-60 Hills Road
Demolition of existing building and erection of building with two Class E units at ground floor level and 9 flats above.
56 - 60 Hills Road Cambridge Cambridgeshire CB2 1LA
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing building and erection of building with two Class E units at ground floor level and 9 flats above.
56 - 60 Hills Road Cambridge Cambridgeshire CB2 1LA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 1bed dwelling.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 22/00231/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from vacant retail to 7 No. apartments (Use Class C3)
212 - 214 Newmarket Road Cambridge Cambridgeshire CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 22/00219/FUL
Proposed installation of parking places for electric vehicles in the De Freville Avenue and Riverside areas, Cambridge. Closing date for comment is 31 January 2022.
One diagram at least shows incursion into the pavement.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05431/FUL | First floor side and single storey rear extensions to create two self-contained flats. |
17 Greenlands Cambridge CB2 0QY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05578/FUL | Change of use to large 7bed HMO (7 persons) sui generis. Rebuild and extend existing garage to bedroom 7 including changing to pitch roof. First floor rear extension (bedroom 6, previously approved under 20/01261/FUL). |
45 Leete Road Cambridge CB1 9HB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05549/FUL | Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an office/business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of existing buildings.
The Emperor 21 Hills Road Cambridge CB2 1NW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05362/FUL | Single storey front and side extension and first floor extension to create a 1no 1bed flat above existing detached building at the rear of 6 Kings Hedges Road.
6E Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for Hybrid Planning Application comprising Full Planning Permission for c47,280sqm (GEA) of Class E floorspace comprising an office building (One Milton Avenue) and two lab buildings together with ground floor amenity uses, a Mobility Hub comprising of c1031 car parking spaces including c3,742sqm of Class E floorspace at ground floor level, a temporary car park of c379 spaces, a wildlife habitat area, Network Rail compound area, enabling works and associated infrastructure; and Outline Planning Permission for c41,940 sqm (GEA) of Class E floorspace comprising one lab building and one office building, together with ground floor amenity uses, enabling works and associated infrastructure.
Cambridge North Commercial Quarter
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05042/FUL | Elevational changes to accommodate 7 No. dwellings. | 212-214 Newmarket Road Cambridge CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Reserved Matters application for third housing phase (known as BDW3) including 210 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 17, 18, 22, 25, 26, 28, 35, 40, 49, 58, 62, 66, and 69 pursuant to outline approval 07/0003/OUT | Darwin Green One BDW3 Development Site Huntingdon Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Darwin Green One BDW4
Development Site
Huntingdon Road
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
Created by Finlay KM // 1 thread
The brook conduit has partially collapsed under the road and the shared-use path. It is currently being repaired (after nearly a year) but the contractors have made use of a very interesting "Cyclists dismount and get an escort" sign. A yellow ramp also makes passing on any non-standard cycle a real challenge. Both of these items are really bad practice and actively discriminate against anyone on a non-standard cycle.
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Created by Roxanne (CEO) // 1 thread
A pilot of delivery robots may be coming to Cambridgeshire.
What are our views/policies about delivery robots?
What do we know about other places they have been trialled?
Created by Rosamund Humphrey (Admin Officer) // 1 thread
(Demolition of existing garages, relocation of existing sub-station within the site, and redevelopment to provide 8no. residential dwellings (Use Class C3) with associated infrastructure and landscaping)
Land Rear Of 5-17 New Square Cambridge Cambridgeshire CB1 1EY
Cambridge
Created by Joseph Tucker // 1 thread
A friend recently smashed her shoulder by cycling into the car trap which awaits anyone who misses the "Except guided buses" sign and then misses the "Car trap" sign, while heading from North Station towards Milton Rd.
In the dark, this is actually an easy mistake for an inexperienced rider, since
a) you believe that you're on a road when actually you're on a piece of Guided Busway
b) these signs can appear to belong to the cycle path, where they are mounted.
Someone appears to have dumped large rocks and rubble into the pot holes in Daws lane. This might make the area more passable to cars that use it to access the allotments but poses a severe danger to cyclist given the size of the rocks, and that the area is poorly lit and frequently flooded.
I tried reporting the issue to the council but received the response:
The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action.
Created by David Green // 2 threads
I run 1-day Wheel Building Courses in Cambridge
These are well-established intensive 1-day practical courses offered at 'level 1 (beginner) and level 2* (refresher/intermediate) level.
You learn how to build strong and durable bicycle wheels in a controlled, supportive environment. Group size is kept small to ensure a high student-teacher ratio. All equipment is provided, but you can bring your own components to build if you want to.
For fully information, dates and booking details please visit https://www.cambridgewheelbuilding.co.uk/
* dependent on demand.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application reference & documents: 21/04952/FUL
Erection of new 2nd floor to provide two new dwelling units with balconies.
208 - 208A Cherry Hinton Road Cambridge CB1 7AW
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf