St Andrew's Street / Regent Street resurfacing
Resurfacing is happening in the coming few days.
Please report any problems here.
We should also be vigilant of any non-repainting of cycle lanes.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Martin Lucas-Smith // 2 threads
Resurfacing is happening in the coming few days.
Please report any problems here.
We should also be vigilant of any non-repainting of cycle lanes.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Created by Roxanne (CEO) // 1 thread
Residential development of up to 58 dwellings with associated infrastructure, landscaping, and public open space. All matters reserved except for access.
Land off Grafton Drive, Caldecote, CB23 7UE
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1144/17/OL
South Cambridgeshire
Application reference : S/1144/17/OL
Created by Roxanne (CEO) // 1 thread
Demolition of existing dwelling and the erection of 7no. self-contained flats with associated amenity space, parking, and bike/bin storage.
129, Cambridge Road, Great Shelford, Cambridge, Cambridgeshire, CB22 5JJ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1210/17/FL
South Cambridgeshire
Application reference : S/1210/17/FL
Created by Roxanne (CEO) // 1 thread
New covered cycle shelter for 72 cycles. Peterhouse College
Cosin Court Peterhouse Trumpington Street Cambridge CB2 1QU
Cambridge
Application reference : 17/0579/FUL
It is proposed that a bespoke covered shelter will be constructed to adjacent to the existing wall. The grass will be replaced with block paving to provide a good base that is permeable. The cycle shelter will be open sided to reduces its mass and avoid being visually intrusive. The roof will have a standing seem zinc covering.
Created by Roxanne (CEO) // 1 thread
Minor application, someone might be interested. 2 sheffield stands at rear of shop.
Renewal of shop front, installation of cassetted awning and new store to rear of premises.
31 Burleigh Street Cambridge CB1 1DG
Cambridge
Application reference : 17/0566/FUL
Created by Roxanne (CEO) // 0 threads
Conversion of the upper floors into 3 no. self-contained flats and associated external alterations.
27 Hills Road Cambridge Cambridgeshire CB2 1NW
Cambridge
Application reference : 17/0559/FUL
Created by Colin Rosenstiel // 1 thread
I thought the roadway at the rear of 1 Station Square was supposed to provide an alternative safer cycle route not through the car armageddon of Station Square. Won't this development block it?
Created by Roxanne (CEO) // 1 thread
SmithsonHill proposals for a park for AgriTech located to the east of the A1301 and South of the A505 at Hinxton.
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Roxanne (CEO) // 1 thread
Demolition of the front low boundary walls, installation of 4 bicycle racks to front, rebuilding the waste bins enclosure, replacement paving and removal of existing gravel with a resin bonded gravel surface. Installation of a bench and planting. Installation of low level garden post lights. Cosmetic changes to the facade of the front porch.
Standard bicycle rack with a creative insert to be designed by students and manufactured to specifications.
40 Humberstone Road Cambridge Cambridgeshire CB4 1JG
Cambridge
Application reference : 17/0185/FUL
Created by Matthew // 1 thread
QUOTE:
``Following discussion with Jamie Wilding at the North West
Cambridge Community Group Meeting, we'd like to arrange a design
workshop meeting to discuss our design proposals at Lot S3, North West Cambridge.
As you may be aware, the design narrative of Lot S3 is largely focused
upon creating a cycle friendly development. With this narrative in
mind, we are seeking the support and ideas of local cyclists.''
Created by Matthew // 1 thread
Generally poor quality roundabout with some highly unusual, so-called cycling 'infrastructure' that seems to have been added over the years, and approximately zero walking infrastructure.
This one comes up every so often but I was not able to identify an existing issue focused on this roundabout specifically.
Created by Roxanne (CEO) // 2 threads
Cambridge University is working on a 30 year transport strategy for all sites including colleges. The consultants preparing the strategy are currently consulting with various stakeholders including Camcycle.
I will set up a meeting with a few Camcycle representatives and the consultants. What ideas do we want to share and who should participate in the meeting?
They expressed interest in our (work in progress) cycling manifesto, vision for Cambridge and design guidance.
Created by Roxanne (CEO) // 1 thread
Erection of 5no. one bed dwellings (following the demolition of the existing dwelling), together with car and cycle parking, landscaping and associated infrastructure.
8 Green End Road Cambridge CB4 1RX
Cambridge
Application reference : 17/0340/FUL
Created by Roxanne (CEO) // 1 thread
This planning application was approved, but there is now a condition application for cycle parking. See: https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=OM2WUUDX0AS00
Refurbishment and extensions to the existing St Barnabas House, Stable Blocks and Kirby Building to provide 42 student bedrooms, manager accommodation and breakout space along with cycle parking following the demolition of existing single storey rear projection to St Barnabas House and kitchen store.
59 St Barnabas Road Cambridge Cambridgeshire CB1 2BX
Cambridge
Application reference : 16/1617/FUL
Created by Roxanne (CEO) // 1 thread
Outline planning application for up to 203 dwellings including affordable housing and land for community provision with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Ida Darwin Hospital Fulbourn Old Drift Fulbourn Cambridgeshire CB21 5EE
Cambridge
Application reference : 17/0402/CTY
Created by Roxanne (CEO) // 1 thread
There are various events on Parker's Piece which impact cycle access. What issues do we have and how do we think the various events should deal with them.
Cambridge Ahead and Grant Thornton are planning a Cambridge Live Lab to discuss key areas considered essential for future growth and prosperity including:
• Education and skills
• Housing and commercial space
• Infrastructure: connectivity and transport
I thought cyclists might like to register their interest to attend and give their views.
Created by Al Storer // 1 thread
As part of the Local Plan 2014 process, a 44 hectare site north of Cherry Hinton has been identified by Cambridge City Council and South Cambridgeshire District Council (SCDC) as being suitable for new residential development. The site is being promoted by Marshall Group Properties and Endurance Estates.
Created by Roxanne (CEO) // 2 threads
Erection of a residential apartment development to be arranged within two blocks comprising of ten 2 x bed units and 6 x 1 bed units along with car and cycle parking, hard and soft landscaping following the demolition of the existing buildings on the site.
34-36 Madingley Road Cambridge Cambridgeshire CB3 0EX
Cambridge
Application reference : 17/0172/FUL
Created by Roxanne (CEO) // 1 thread
Full planning application for the erection of 56 dwellings, including new access onto Fen Drayton Road, infrastructure, landscaping and open space
field north of Home Close and west of Moat, Land north of Fen Drayton Road, Swavesey
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0525/17/FL
South Cambridgeshire
Application reference : S/0525/17/FL
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by olwen williams // 1 thread
A cycleway runs along the pavement on the S side of Fen Causeway. There are various metal barriers, placed to prevent pedestrians coming off a footpath and going straight onto the road. 2-3 years ago, I collided with a barrier in the cycleway.because I was blinded by on-coming car headlights to my left. This barrier is uniquely dangerous because the oncoming cars are mounting the bridge over the river. In addition, oncoming cyclists on the right may both add to the difficulty in seeing the barrier and also narrow the cycleway. In rush hour, the barrier is obscured and invisible for about 25% of the time.
I am aware of one other person who has run into the barrier, but I suspect there must be more. If you have done so, please get in touch! I have so far been unsuccessful in persuading the council that this barrier must be removed.
Created by Roxanne (CEO) // 1 thread
Erection of five self-contained studios and associated works.
150 Catharine Street Cambridge CB1 3AR
Cambridge
Application reference : 17/0101/FUL
Cycle parking will be covered Sheffield stands providing parking "for at least 5 cycles". (See Design and Access Statement)
While this may meet the Council guidelines, it is insufficient for this location especially if there may be 2 people living in some of the studios or if they will have visitors.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)