Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:

  • 23/04930/REM 332 homes at Marleigh phase 3

    Created by KW // 1 thread

    23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA

    Please sign in to vote.
  • 23/04537/FUL - Flats - School Hill - Histon

    Tom McKeown // 1 thread

    First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.

    Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE

    South Cambridgeshire

    Application reference : 23/04537/FUL

    Please sign in to vote.
  • 23/04380/FUL 12 dwellings between Ditton Walk and the Trail

    Created by KW // 1 thread

    Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.

    Land At Ditton Walk Cambridge Cambridgeshire

    Cambridge

    Application reference : 23/04380/FUL

    Not shown in the plans, but suggested in the D&A:  a pedestrian link between Ditton Walk and the Trail

    Please sign in to vote.
  • 23/04037/FUL Refurbishment and retrofit of existing building

    sound+fury // 1 thread

    Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Cambridge

    Application reference : 23/04037/FUL

    Please sign in to vote.
  • Six-month closure of Halingway / Towpath

    Created by Roxanne (CEO) // 1 thread

    Announcement from Cam Conservancy:

    https://www.camconservancy.org/public-announcement

    Tree management Programme 2023/24​ A recent tree survey has identified  the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.​

    • There will be some temporary closures, of sections of the Halingway, for a few hours to deal with individual trees that present more pressing issues.
    • Closures of longer duration between Baitsbite Lock to Grassy Corner , within the above dates, will be necessary to manage larger sections.
    • All closures will be between the hours on 0900hrs-1700hrs, Monday to Friday
    • Arrangements have been made to suspend closures for official rowing events.
    • Scheduled closures will be updated regularly on the website diary. 

     The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who  use the Halingway and the staff carrying out the works.​

    Please sign in to vote.
  • 23/03068/FUL Refurbishment of the building to facilitate MRI installation

    sound+fury // 1 thread

    Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).

    163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN

    Cambridge

    Application reference : 23/03068/FUL

    Please sign in to vote.
  • 23/03080/OUT Proposed Office and Labs near Hauxton

    Created by Josh Grantham // 1 thread

    23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT

    Please sign in to vote.
  • 23/02696/FUL - Post Grad accommodation

    Created by Josh Grantham // 1 thread

    23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL

    Please sign in to vote.
  • Overgrown vegetation blocking Love Lane

    Anon // 1 thread

    Towards the west end of Love Lane, vegetation overhanging from the south does not allow an adult to pass (on foot or cycle) without bending. (Photo is looking west.)

    Noticed on 13 July, confirmed still there 20 July.

    Reported to Cambridgeshire County Council 19 July (ref 00438005). They closed the report 24 July, saying "The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action."

    (This area has been problematic previously -- see KW's reporting in March 2023 on the 'exclusionary barriers' thread. Not sure if exactly the same vegetation, but same general area.)

    Please sign in to vote.
  • 23/02685/FUL Part demolition and refurbishment of the Grafton Centre

    sound+fury // 1 thread

    i) Demolition of 11-12 Burleigh Street and Abbeygate House, ii) Part demolition and alterations to the Grafton Centre, removal of existing facades, erection of new floorspace for life science use, new and replacement façades and shopfronts, provision of terraces at fourth floor level, installation of plant and enclosures, iii) Redevelopment of existing bus turning head and redundant service area to provide new hotel and leisure quarter, iv) New pedestrian access route from Christchurch Street to Burleigh Street, provision of cycle parking spaces, public realm and landscape improvements, v) Highway works to East Road providing new bus stops, pedestrian and cycle routes and other associated works.

    Grafton Centre Fitzroy Street Cambridge Cambridgeshire

    Cambridge

    Application reference : 23/02685/FUL

    Please sign in to vote.
  • Overgrowth on Equiano Bridge

    Created by jack // 1 thread

    The bushes/trees are pretty overgrown into the left side of the cycle path, meaning you have to move away from the edge at points, on an already narrow cycle track (fairly narrow for bidirectional travel, anyway).

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top