New parking problems at Cambridge Station
As part of the station redevelopments, the existing cycleparking is being replaced through June-August 2014 with two-tier stacks 'with the same capacity as the current arrangements'
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Phillip Barnett // 2 threads
As part of the station redevelopments, the existing cycleparking is being replaced through June-August 2014 with two-tier stacks 'with the same capacity as the current arrangements'
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by David Earl // 1 thread
Changes are proposed to this junction (thread and attachment to follow)
Created by Al Storer // 1 thread
Cambridge City Council planning application 14/0713/FUL. Nursery to be demolished and replaced by housing
Created by Heather Coleman // 1 thread
I'm getting reports of a very serious accident at the crossing of the Addenbrooke's Trumpington cycleway and the Guided busway from the city centre to the Park and Ride, and the Addenbrooke's spur.
Created by Al Storer // 1 thread
A local campaign group has been formed to push for improvements to this busy roundabout
Created by Hester Wells // 1 thread
Consultation on road markings and traffic signs at https://www.gov.uk/government/consultations/traffic-signs-regulations-and-general-directions-2015
There are a number of things which I believe affect cyclists, see http://www.bikebiz.com/news/read/dft-to-allow-better-signage-for-cyclists-including-removing-asl-lanes/016336
This is really a national issue, but didn't want to spam all users.
Created by Hester Wells // 1 thread
s106 money has been set aside from the West Cambridge development for a route into Central Cambridge.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Heather Coleman // 1 thread
I've just spotted a County Council public notice on the post at the point noted, but applying to various areas as far as I can tell. Was in a bit of a hurry - stupidly didn't think of taking a photo of it. But the Council appear to be suggesting putting bus lane enforcement cameras in! I think this has to be good news, and ought to help cyclists - what do other people think?
Created by Robin Heydon // 1 thread
The Guided Busway is a huge success. It carries many adults and youth to and from many destinations, a major destination being the Cambridge Regional College bus stop. Unfortunately, the volume of bicycle and pedestrian traffic along the line of the busway at this point probably wasn’t considered and is now causing problems. It will probably cause even more problems once the new Science Park Station is built at the far end of the busway.
Current Situation
When I started looking at this junction, I tried to ignore what was “built” and instead tried to observe how people moved through the junction. In the first diagram I’ve shown the main desire lines. Desire lines are where people actually move rather than those which engineers designed. For example, when crossing the access road to the college, from the busway, people walked in as straight a line as possible pretty much ignoring the supposed 90º toucan crossing.
Many people on bicycles don’t bother with the toucan but instead just wait for a gap between the traffic light phases and quickly scoot across. Many people ignore what has been designed and have found new, possibly better, ways through the junction - for example, creating a path from King Hedges Road over bare ground. This informal crossing obviously works, but is it safe? Do the bus drivers expect people to cross at this point?
There are many conflict points, some less bothersome than others. The two biggest problems are at the bus stop exit junction with the science park entrance, and between the toucan crossing and the brick surround of the gas supply for the area. When cycling there can be many people trying to cross the road, especially after the bus has stopped, or just before classes are due to start, all getting in your way. Of course, we are getting in their way too, and this isn’t helped by the poor sight lines.
I would therefore summarise that the problems are simply:
1. Severely limited space at the toucan crossing and busway crossing points.
2. Informal pedestrian crossing show junction isn’t working as desired.
3. Very narrow access to science park with poor sight lines.
Proposed Solution
First, we should always respect peoples desire lines. They are voting with their feet, it is obviously safe enough for them to do it day after day, and they have left plenty of evidence that it works by wearing down the grass. So we should make this a proper pedestrian route. This actually has two benefits: it moves a lot of the pedestrian traffic to the west side of the busway stop reducing the number of people at the science park entrance, and it allows a more “directed” path to the north side of that brick building.
Second, we should separate the CRC traffic and guided busway traffic as much as possible at the CRC junction. The busway traffic should follow their natural desire line which is straight on. There are wide turning splays for buses to access the busway from the CRC, yet no buses do this. We should remove them and make a straight on toucan in line with the busway. The CRC traffic would be given their own toucan on the north side of the brick building. Some of the existing railing (cycle parking) here may need to be removed, and the car stop line pushed back a car length or so. The space between the car stop line and the new toucan could usefully become an advanced cycle box.
Third, we should build a proper segregated footway to the north of the cycle track that links to the existing footway going to the “new” toucan. This would be built similar to the Coton path such that pedestrian traffic would be encouraged to seek the higher and safer ground.
Forth, we should straighten the line for access from the science park to the busway. The current facility bends away from the busway crossing, is very narrow, and limits the flow. I’ve seen times when people are queuing cross the busway to travel through this gate. On the south side, the highly restrictive chicane should be removed. People happily cross the busway at multiple points without problems, as here the buses are moving very slowly as they approach the station.
Lastly, we should alter the phasing of the traffic lights. A simple desire for people on bicycle is to wait as little time as possible, but we take very little time to cross a road. Therefore, I would suggest that bicycles are given a green light between every car phase, but only for a few seconds. They should also be given a green light whenever the busway is given a green light. The individual phases may need to be lengthened slightly, say from 25 seconds to 30 seconds to maintain the “capacity”, but the advantages it gives to bicycles would be huge. Also, the pedestrian crossing could be changed to a zebra crossing. This route would then become preferable to the slower toucan crossing further pulling people away. It would also allow for a much more pedestrian focused environment around what should be highly walkable area.
Created by David Earl // 1 thread
Demolition of Edinburgh Building, warehouse and associated buildings and erection of office development of up to 41,750 sq. m. gross external area with development generally being of between 4 and 5 storeys (with limited areas of screened rooftop plant), a single tower element with two further storeys of accommodation, up to 189 car parking spaces (+/- 10%), up to 1325 cycle parking spaces (+/- 20%), up to 26 motorcycle spaces, hard and soft landscaping and ancillary facilities including staff canteens, meeting rooms, refuse enclosures, plant rooms, social break-out spaces etc. all to serve as the new office campus headquarters for Cambridge Assessment.
Created by David Earl // 1 thread
Bella Italia have applied to Cambridgeshire County Council to put outside seating (19 tables/38 chairs) at the Mill Pond outside their restaurant:
http://www.cyclestreets.net/location/57440/
(I'll put the detailed plan on the thread to follow).
Created by Al Storer // 1 thread
The Draft Cambridgeshire Long Term Transport Strategy and Local Transport Plan Refresh has, as a City Deal item, a £43million project to create "Comprehensive segregated bus priority / Busway on Newmarket Road into Cambridge between Airport Way and Elizabeth Way / East Road."
This is quite clearly an opportunity to get far better cycle provision on this corridor.
Created by MJR // 0 threads
For a change, I tried following the route signs for the station today. As well as a mystery tour near the Grafton centre where the signs simply stop, my route was blocked at Gresham Road by "WET TAR" and a sign proclaiming it. No diversion was signed and there were no advance warning signs that would have let me pick a better route earlier. Plenty of people were riding along the footways - enough that it was too crowded for me to feel safe doing so. I performed a U-turn, waited a second time at the crossroad traffic lights and rode along the very busy Gonville Place and Hills Road instead.
I've tweeted at Cambridgeshire County Council and Cambridge City Council in https://mobile.twitter.com/mjray/status/453926972843118593 because I don't think that is legal - a cycle route suddenly being blocked by wet tar does not comply with the code of practice on safety at streetworks, which is required by law. I'm disappointed to encounter this in Cambridge.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
Created by Heather Coleman // 1 thread
When I popped into the Cambridge Wine Merchants last night, there were signs on all the posts and sheffield stands saying "no cycle parking from 6am, 7th April". I assumed some royal visit. I asked the man in the shop if he thought people not being able to park would affect trade and he said he hoped not. However, by the post where I normally park there's a big "road closed" sign, 6am-6pm (I think).
He is under the impression that there is filming going on from 7am-10am. It is period filming in the 1950s therefore you can't have sheffield stands (probably not invented) or modern bikes.
My main question/gripe is, when I see a "road closed" sign, I assume I will be able to get through even if I need to dismount and wheel my cycle. Sometimes, if it's a long walk, it may be quicker to cycle via another route. From the nature of what I've been told is going on, it sounds to me as if actually the road will even be closed to pedestrians, well unless they're wearing authentic 1950s dress.
Does anyone know any more? Does anyone know anything about the legal status of forcing pedestrians to take a lengthy diversion from what is the public highway? There are various cyclescape threads which have mentioned that although cars only have a permissive right to use the road, pedestrians have some stronger right. Can they force pedestrians and dismounted cyclists to go another route, when it's not an issue of national security?
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Hester Wells // 4 threads
As part of the Cycle City Ambition Grants there are proprosals to install wide, segregated or hybrid cycle lanes, with priority over sideroads, on Hills Road.
Created by David Earl // 1 thread
Consultation February 2014 (see thread)
Created by David Earl // 0 threads
Car Parks P, F1 And F2
Addenbrookes
Hills Road
To provide education centre, private hospital, hotel, conference centre,
ancillary space, associated car parking and public realm works to replace
existing surface parking to accommodate 42,600sqm of development.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 18 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)