  • S/4594/18/RM Busway link from Broadway into Cambourne

    Created by Matthew // 1 thread

    Unsure why this is coming forward now but it appears they want to establish the Cambourne part of the busway that will run via Bourn Airfield site into Cambourne. There is a 4m 'footway' separated by a 0.5m buffer next to it. It's not labelled as such but this would probably be the 'strategic cycleway' link also via Bourn Airfield.

    ...

    Approval of matters reserved for access, appearance, Landscaping, layout and scale following Outline planning permission S/3329/16/OL for a bus link between Sterling Way and Broadway. The outline application was not EIA development. Land between Stirling Way and Broadway, Land for bus Link, Between Stirling Way and the Broadway, Cambourne http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/4594/18/RM South Cambridgeshire Application reference : S/4594/18/RM

    Please sign in to vote.
  • 18/1782/FUL Cowley Road - Office development

    Created by Matthew // 1 thread

    Proposes 120 cycle parking spaces via two-tier racks.

    ...

    Four storey office development (B1 use) with associated car and bicycle parking, plant room, sub station and landscaping. William James House 50 - 55 Cowley Road Cambridge Cambridgeshire CB4 0WU https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PI6V39DXHMI00 Cambridge Application reference : 18/1782/FUL

    Please sign in to vote.
  • Stow-cum-Quy no cycle path

    Created by Robbie397 // 1 thread

    There is now a nice new fully separated cycle path from the north end of Stow-cum-Quy along Colders Lane and Quy Road, which provides easy access to Anglesey Abbey, Lode, and a useful connection between cycle routes 51 and 11, with onward access to Wicken Fen. This is really great. However, to get onto this path from cycle route 51, just after the Newmarket Road junction with the A14, requires cycling along half a mile of busy, narrow, 30 mph road with no cycleway, and traffic calming (islands) that encourages wreckless overtaking of bicycles. The only safe option is to cycle on a narrow footpath with no signage. 

    Could at least painted cycle lanes be added to the road here, and with a 20 mph speed limit to make the village nicer for cyclists, residents and pedestrians? This could also encourage many more visitors to Anglesey Abbey from Cambridge to go by bike, and to go more regularly, benefiting the National Trust. 

    Please sign in to vote.
  • Girton to Oakington cycle path

    Created by Philip Garsed // 3 threads

    Cambridgeshire County Council have a project to upgrade the existing Girton-Oakington cycle path. The upgrade is planned between the northern end of Manor Farm Road in Girton and Mansell Farm in Oakington (start of 30 mph limit), between which the majority of the route will be widened to ~3 m. There are no real proposals to improve the junction with New Road.

    Please sign in to vote.
  • 18/1887/FUL side of 57 Peveral Road - new detached 3-BR dwelling

    Created by Matthew // 1 thread

    cycle parking is a vague 'bike storage' area handwaved in the rear garden somewhere

    the plot is oddly shaped like a triangle, and it's completely unclear how the rear garden could be accessed at all.

    ...

    Erection of a detached 3-bed dwelling to the side of 57 Peverel Road. 57 Peverel Road Cambridge CB5 8RN https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PJ472YDXI2300 Cambridge Application reference : 18/1887/FUL

    Please sign in to vote.
  • Cycle path though Clay Farm Community Garden

    Created by Dave Fox // 1 thread

    There is to be a new cycle path running W-E through the developing community garden in the Clay Farm development in Cambridge's southern fringe. It follows the line of a gas main (purple line on the plan).

    The garden is already split by Hobson Avenue running N-S. The cycle route crosses that road and there are four 15metre wide gaps in the hedge where the cycle route enters/exits the garden.

    The cycle path will probably have a chicane design at each end to slow cyclists at junction points. Here are some questions about the cycle path:

    * How can the design ensure safety at the Hobson Road crossing?
    * What should the four entrances/exits be like?
    * What garden features should there be along the cycle path’s route?
    * Should there be lighting?
    * What other questions occur to you about the cycle path, and what answers can you offer?

    This is part of a consultation intended for local residents, however I hope that someone here might be able to comment especially on the safety of the junctions where the cycle route crosses Hobson Avenue.

    (The cycle route also crosses the busway at the Foster Road stop, though I guess that bit is beyond the scope of the community garden's consultation.)

    Feel free to ask me here for clarifications, and please comment at the community garden's page below.

    Please sign in to vote.
  • 18/1876/FUL 44 St Andrew St - Hobson House - refurb into hotel & retail

    Created by Matthew // 1 thread

    D&A p113 (section: Accessibility): 'Cycle storage has been minimised on the site to reflect the hotel’s use and proximity to the City Centre. We therefore show 16 spaces in alignment with the Transport Assessment.'

    Room with '16' cycles (unspecified arrangement) accessed from Downing Place.

    5 Sheffield stands shown in front on the pavement.

    Planning Statement:
    6.40 Downing Street will provide cycle access to 16 cycle spaces provided for staff within the site. These would be inside the building, so covered and secure, with lockers. The provision of 16 spaces is based in the cycle parking standards in the Local Plan requiring 2 space for every 5 members of staff. In this stance, with 18 staff this would require 7 cycle spaces. The additional provision will allow for flexibility to accommodate any additional
    demand.

    6.42 Guests travelling to the site by cycle may use the dockless cycle hire schemes now available in Cambridge, including Ofo and Mobike. These schemes do not require dedicated cycle parking spaces, and could be attractive to guests arriving at Cambridge Station without heavy luggage to then cycle the 1.4km (or 0.85 miles) to the site.

    Didn't see much discussion about safety of the drop-off/pick-up area in front except that it 'would not block the carriageway'.

    ...

    Change of use and refurbishment of the existing Grade II listed office building (use Class B1(a) Offices to a 57 bed boutique hotel (Use Class C1) and cafe/tea room (use Class A3), in include replacement of glazed screen on the St Andrew's street facade, upgrading thermal character of the glazed roof over drill hall to create a central atrium, removal of existing northern wing to create two floors above, second floor extension to the existing southern wing; together with partial demolition and replacement new-building at the rear and associated works.

    Cambridge City Council Hobson House 42 - 44 St Andrews Street Cambridge Cambridgeshire CB2 3AS

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PIYN5ZDXHZK00

    Cambridge

    Application reference : 18/1876/FUL

    Please sign in to vote.
  • 18/1862/FUL Regent St / Gonville Pl - Lloyds House - refurbish as offices

    Created by Matthew // 1 thread

    Plans to increase cycle parking provision from 6 to 62 as part of works to refurbish.

    Outer 'courtyard' facing Gonville Place will be enclosed by a fence creating an area with 20 Sheffield stands.

    The remaining spaces will be provided by double-stackers next to the car park in the interior courtyard.

    ...

    Change of use from mixed A2/B1 use to B1 offices, and external works including alterations to elevations and erection of boundary treatment.

    Lloyds TSB Lloyds House 95 - 97 Regent Street Cambridge Cambridgeshire CB2 1BQ

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PIUXQXDXHXP00

    Cambridge

    Application reference : 18/1862/FUL

    Please sign in to vote.
  • Steps in kerb on new Arbury Road cycle paths

    Created by Rick // 1 thread

    The new cycle lanes on Arbury Road are great but I'm worried the asphalt height hasn't been done to a tight enough tolerance. In places the step from the road up the kerb to the cycle path is quite large, so I'm reluctant to move over from the road to the cycle lane until I reach a flat part.

    I may be being over-cautious but I've had bad experiences in the past with falling off and bucked wheels from riding up kerbs at too shallow an angle, and I'm reluctant to experiment too hard!

    Does anyone know what the tolerance is meant to be, and whether it has been met here?

    Please sign in to vote.
  • Station Road Histon - close to through traffic?

    Created by Joe Adam // 1 thread

    Station Road in Histon seems to have a large, and in my view inappropriate amount of through traffic.
    I assume the majority of the traffic is attempting to avoid the traffic lights and the Green and shave some time of their drive through Histon.
    There is a large amount of foot and cycle traffic along this road, as the direct route between two schools with many parents having children at both (infant and junior).
    The foot paths are very narrow and the amount of traffic makes cycling (espcially with children) intimidating.
    I think the situation (for people on bikes and foot at least) could very cheaply be massively improved by blocking Station road to through traffic, restoring thee road to what it should be, a quiet residential street.
    I suppose this would lead to some traffic jams, at least at first until people get used to it.

    I've recently spoken to several people, mostly other parents, who have similar opinions. Does anyone have a view on a good way forward in terms of campaigning on this?
    I wondered about trying to set up a petition, which I could circulate amount parents to try and show that there could be significant support for this. Or course there may also be significant backlash.... Or should I try and talk to the parish council first. Any thoughts welcome.
    I've suggested this to the parish council several times (as have other parents I discover) but nothing has yet happened (I've not even had a reply...)

    Please sign in to vote.
  • Inappropriately timed council activities

    Created by Heather Coleman // 1 thread

    Is there a way of persuading the council that they should not be having bin collections or road sweeping on major roads around the city, which also act as major bike routes, bus routes, car commuter routes so are deeply congested during "rush hour" at silly times, ie during the same "rush hour"?

    Yesterday, it was a bin lorry wending its way down Hills Road at 8.45am; a danger to cyclists and the bin men themselves as well as causing a big queue. Today it was a road sweeper doing Maids Causeway which is a bus route at 8.30am, also causing a big queue. Both these roads will be significantly less busy come 9am.

    It's not just bad for cyclists but everyone. There are plenty of quieter roads in the city that can be attended to between about 8 and 9am, so why choose to do stuff on what I'd call the trunk roads of the city, holding up all the buses and making it horrible for cyclists. It's a lack of joined up thinking in my opinion.

    Please sign in to vote.
  • 18/1826/FUL 43-47 Water St - 9 new flats & cycle parking

    Created by Matthew // 1 thread

    From D&A:
    • The scheme is to be provided with an integral covered, secure cycle store designed
    in accordance with current standards (Cycle Parking Guide For New Residential
    Developments). The store is located along the rear boundary and is to be fitted with
    Sheffield cycle stands at 1m centers to accommodate up to 12 cycles. Access would
    be gained via secure gates (min. 1m in width) located from the front and rear of the
    site.
    • The proposal benefits from 4 additional visitors’ cycle spaces.
    • A covered bike storage area is also proposed for Waterhouse flats to replace the
    existing external cycle parking spaces.

    ...

    Erection of block containing 9 flats following demolition of existing building.

    43 - 47 Water Street Cambridge Cambridgeshire CB4 1NZ

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PIJTQ9DXHS900

    Cambridge

    Application reference : 18/1826/FUL

    Please sign in to vote.
  • Wintr Fair bins on cycle path

    Created by Amelie K // 0 threads

    Extra blue and black bins have been put along Gonville Place, near where the cyclist counter used to be. They narrow the cycle lane in real, and effectively. Their location generally is poorly thought through (if at all). They are clearly intended for visitors to the winter fun fair on Prkers Piece, who will be on foot, but to use the bins they need to cross the cycle lane.

    Please sign in to vote.
  • School Street for Arbury Primary School

    Created by Daniel Thomas // 1 thread

    Carlton Way gets a lot of through traffic during school run and both parent parking and commuter traffic create an unsafe environment for children going to Arbury Primary School or Pre-School.
    A School Street on the section of Carlton Way between Perse Way and Brimley Road and on Hall Farm Road between Carlton Way and Topham Way might be one way of substantially improving the situation.

    Please sign in to vote.
  • City Changer Cargo Bike

    The county council cycling team are involved in a 3-year project funded by the EU’s Horizon 2020 Research Programme to grow delivery and passengers by bike, cargo bike and e-cargo bike in 100 cities. The project called 'City Changer Cargo Bike' was launched to an audience of EU institutions, national and regional governments, advocacy organisations and business leaders in October 2018.

    Please sign in to vote.
  • S/0101/18/CC Histon - New Primary School north of Garden Walk

    Created by Matthew // 1 thread

    Proposes new access onto Glebe Way cutting across shared-use pavement, interrupting it, putting give-way markings on the pavement and dropping the kerbs. Visibility splays are drawn to to the kerb instead of to the back of the pavement.

    Proposed pedestrian crossing further south will also place poles, obstructions and potential conflict into the narrow shared-use pavement.

    This is a real mess considering that they have plenty of space to widen the pavement and do it right.

    ...

    Erection of a 2FE (420 place) primary school and single storey 52 place pre-school nursery with associated vehicle and pedestrian access, car and cycle parking, vehicular drop off area with landscaping and playing fields, a pedestrian crossing, footpath widening and ancillary works.