Histon and Impington Local Highways Projects 2017
Histon and Impington Parish council are looking for suggestions for schemes for the 2017 for Local highways improvements
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Joe Adam // 1 thread
Histon and Impington Parish council are looking for suggestions for schemes for the 2017 for Local highways improvements
Created by Roxanne (CEO) // 1 thread
Works and change of use to 115 & 117 Grantchester Meadows including partial demolition of outbuildings, refurbishment, internal and external works and extensions to create 22 rooms and 1 apartment for post-graduate student House of Multiple Occupation.
115-117 Grantchester Meadows Cambridge Cambridgeshire CB3 9JN
Cambridge
Application reference : 16/1529/FUL
Created by Roxanne (CEO) // 1 thread
Mixed use development, comprising of 2No. Hot Food Takeaways (A5 use) and 8 No. Flats following demolition of existing buildings.
207 Green End Road Cambridge Cambridgeshire CB4 1RJ
Cambridge
Application reference : 16/1413/FUL
Created by Roxanne (CEO) // 1 thread
Conversion and extension of Nos. 324 and 322 Histon Road to create 9 no. apartments, including side, rear and roof extensions. Construction of 4 no. semi-detached dwellings on land to the rear fronting Roseford Road. Associated access, car and cycle parking, bin stores and landscaping.
322-324 Histon Road Cambridge Cambridgeshire CB4 3HT
Cambridge
Application reference : 16/1423/FUL
Created by Roxanne (CEO) // 1 thread
A minor issue, but I do wonder if they would also be obliged to install cycle parking if they were installing car parking?
Retrospective planning application for car park
Post Office 11 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HY
Cambridge
Application reference : 16/1360/FUL
Created by Roxanne (CEO) // 1 thread
16/1389/FUL | Demolition of the existing office building and removal of the 145 associated car parking spaces (use class B1a) and construction of College accommodation (comprising 243 en-suite rooms and 24 studios), landscaping and access arrangements (use class sui generis) | Mount Pleasant House Mount Pleasant Cambridge Cambridgeshire CB3 0RN
SUMMARY
Student and Staff Accommodation for St Edmunds College on Castle Street/Huntingdon Road.
243 ensuite bedrooms for the Colleges and 34 studio apartments
demolition of the existing Mount Pleasant House o ce building and the removal of the 145 associated car parking spaces
Total bed spaces of 277
Cycle parking spaces 278 (double stack & Sheffield). Plus 28 visitor spaces.
Tom McKeown // 1 thread
Suggestions for cycle parking locations in Histon & Impington.
Created by Roxanne (CEO) // 1 thread
Proposed mixed use building incorporating a commercial unit at ground floor to be used for A1, A2, B1(a) and D1 (in the alternative) and six residential apartments comprising two 2xbed units, three 1xbed units and one studio unit including associated cycle and bin storage provision.
Albert House Young Street Cambridge Cambridgeshire CB1 2LZ
Cambridge
Application reference : 16/1243/FUL
Created by Roxanne (CEO) // 1 thread
Proposed residential development comprising 57 dwellings including houses and apartments, open space, landscaping and new vehicular access.
Field At Corner Of Norman Way And Hatherdene Close Cambridge Cambridgeshire
Cambridge
Application reference : 16/1181/FUL
Created by Roxanne (CEO) // 1 thread
Given other applications for Cheddars Lane and ongoing issues with Newmarket Road, this might be of interest.
Construction of car servicing building with vehicle yard/car parking and re-opening of 2 existing vehicle accesses to Cheddars Lane
39 Cheddars Lane Cambridge Cambridgeshire CB5 8LD
Cambridge
Application reference : 15/1476/COND3
Created by Roxanne (CEO) // 1 thread
As this is at the Science Park I thought it might be of interest to some members.
Installation of new bike store.
334-335, Cambridge Science Park, Milton, Cambridgeshire
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1499/16/FL
South Cambridgeshire
Application reference : S/1499/16/FL
Created by Roxanne (CEO) // 1 thread
Erection of a mixed-use development comprising a library and community facility at ground floor with 10No 1xbedroom residential flats on the upper floors along with cycle parking and associated landscaping, following the demolition of the existing building on site.
Milton Library Ascham Road Cambridge Cambridgeshire CB4 2BD
Cambridge
Application reference : 16/1130/FUL
Created by Roxanne (CEO) // 1 thread
Proposed change of use of existing club building to form four 2-Bed flats and five 1-Bed flats, including additional storey in new roof extension. Erection of new two storey club building at rear with basement and a one 2-Bed flat, along with car and cycle parking and associated landscaping.
Cherry Hinton Constitutional Club 142 - 144 Cherry Hinton Road Cambridge Cambridgeshire CB1 7AJ
Cambridge
Application reference : 16/1108/FUL
Created by Roxanne (CEO) // 1 thread
Change of use from dwelling to 6 bed HMO with up to 8 persons (Sui Generis) and first floor rear extension. Ancillary garden room in rear garden.
63 Darwin Drive Cambridge CB4 3HQ
Cambridge
Application reference : 16/1054/FUL
Installation of new car park control barrier, at Scott Polar Research Institute, Lensfield Road, Cambridge, CB2 1ER
This is a heavily-used entrance for cycling and walking. The proposed cycle/walk section seems far too small.
This might not be a problem if closed only at night, but during the day would cause an obstruction.
The proposed conversion and new residential development of 48 Verulam Way/15 Ellesmere Road, Cambridge, CB4 2HL to form 8 one bedroom studio apartments.
Eight secure cycle spaces are provided but only at the rear of the development. Is there a risk that cycles are left on the pavement? the proposal includes 6 off-road car parking spaces.
Consultation closes Thu 07 Jul 2016
see link to Council website:
https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=O8G9AVDXM4E00
Application reference : 16/1071/FUL
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Roxanne (CEO) // 1 thread
Erection of a residential development containing eight units (one 2xbed flat, five 1xbed flats and two studio units) following the demolition of the existing buildings on the site
19 - 21 Godesdone Road Cambridge Cambridgeshire CB5 8HR
Cambridge
Application reference : 16/1002/FUL
Created by Roxanne (CEO) // 1 thread
Demolition of existing building and the erection of two new buildings to provide 2no. Maisonettes and 3no. 1bed flats, together with bin & cycle store and landscaping.
30 Davy Road Cambridge CB1 3QW
Cambridge
Application reference : 16/1067/FUL
Created by Jim Baker // 1 thread
I have observed vehicles queuing at the rising bollards on St. John's Street before 4pm, apparently mostly belong to market tradespeople waiting for the bollards to go down. On at least one occasion this has meant the road is impassable to cyclists.
Created by Rose Eichenberger // 2 threads
There is an ongoing shortage of cycle parking spaces. As a result, people park their bikes against lamp post, railings and trees. This is not a sustainable situation and additional secure cycle parking spaces are desperately needed.
The campus is known to be a target of cycle thieves, hence this issue needs to be resolved as a matter of urgency.
Created by Chris Howell // 1 thread
The stretch of NCN51 along Stourbridge Common between the Green Dragon Bridge and Riverside is hopelessly inadequate for the high volume of traffic, too narrow, surfacing badly breaking up with a number of hazards - rowing coaches, cows, joggers with headphones etc.
Would anyone else support campaigning for a new two way cycle path through that stretch of Stourbridge common to the south of the existing path (through the middle of that bit of common) from the Green Dragon Bridge to an improved access at Riverside, and leave the path by the river to its myriad of other users? Its only going to get busier when the new station opens...
Created by Roxanne (CEO) // 1 thread
Small development, there is very little information about cycle however a quick look at the drawing suggests that cycle parking layout is problematic.
From the Planning and Heritage statement.
The accompanying block plan clearly demonstrates that the proposed site arrangements provide for convenient and adequate locations for refuse collection, recycling and on-site cycle parking to provide opportunities to create an attractive setting with suitable hard landscaping and the use of coordinated materials of appropriate colour and texture would ensure a high quality build.
It is considered that although no on-site parking has been made available to the proposed dwellings, the application site’s highly sustainable location and on-site secured cycle storage would encourage future occupiers depend less on private vehicles and travel via other more sustainable methods.
See "PROPOSED BLOCK AND LOCATION PLAN" for drawing.
Created by Roxanne (CEO) // 1 thread
Due to proximity to other hot spots e.g. Severn Place, Newmarket Road, Eastern Gate I thought it relevant to raise this issue.
There is a change of use from A1 and B1 to D1. (Retail to University Education).
If they are expecting students to access this site then there must be cycle parking and safe infrastructure for cycling to the location. None of this is mentioned in the planning application.
Created by Roxanne (CEO) // 1 thread
Erection of 68 student rooms, 8 student kitchens, 4 college flats, 3 college offices, music practice room and seminar rooms, commercial unit (420 sqm) including the provision of a connection to the Todd Building and associated landscaping and cycle parking (following demolition of existing buildings)
Christs College St Andrews Street Cambridge Cambridgeshire CB2 3BU
Cambridge
Application reference : 16/0904/FUL
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Gingineer // 1 thread
I work near the station and the area out the front of the new building has short term cycle spaces for the shops there. These spaces are specifically for the retail units (ratios of this is in the planning application I understand). so the racks have to be installed and wont be policed by the retail units (such as the ones by Microsoft which are for employees) yet they fill with commuters who should be using the cycle park.
I have been thinking that Cambridge CC needs to agree a system (bye law?) to create short term racks. The colour should be different and signage provided but for racks that need controlling like this it is essential to stop antisocial cyclists piling up bikes.
Of course its difficult to police, and a heavy handed approach should be avoided but I see a growing issue across the city where racks for specific short term purposes are created but then filled with long term cyclists who should accept if they are parked all day that the extra 2 minutes walk for them to a proper cycle park is reasonable to expect. Otherwise this puts people off cycling the short distances as they fear they wont get a rack or will spend a lot of time scrambling for a spot.
Cyclists could be stickered and if caught again then fined. Or clamped to the rack with a fee to unlock (yes I know that sounds like it defeats the object but it should work after a while).
Created by Roxanne (CEO) // 25 threads
Camcycle is launching the first ever 'Cambridge Festival of Cycling' which we plan to grow into a recurring festival in September each year.
Along with a range of events, we also plan to conduct a month long Cambridge Cycling Survey.
The aims of the festival:
- Increase awareness of Camcycle leading to more members, volunteers and influence, particularly among new audiences
- Encourage more, better and safer cycling, for all ages and abilities
- Increase our income thorough sponsorship opportunities
- Increase engagement with our campaigning activities
- Create relationships with other community groups who can partner with us on festival events.
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)