Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
-
-
17/1019/FUL 2x2 bed dwellings along and 2 bed bungalow - Newmarket Road CB5 8LL
Demolition of existing dwelling and erection of a pair of 2 bed dwellings along with a 2 bed chalet bungalow at the rear
-
-
-
Cambridge Road, Bridge Road traffic lights
The traffic lights on the Cambridge Road, Bridge road t junction have just been redone.
They have slightly widened part of the footpath/shared use cycle way. However they have put a new offside repeater light in. The pole for this goes in just where the path is narrowing again, and where people on bikes turning right from Cambridge Road are joining the path. -
17/1101/FUL: Cycle parking. Kettle's Yard, Northampton Street Cambridge
Installation of new cycle parking provision, including reorientated path and steps, repositioned parking metre, waste bin, and installation of 16 sheffield hoops and 1 cargo bike stand.
Land Adj. Northampton Street Green Northampton Street Cambridge
Cambridge
Application reference : 17/1101/FUL
-
S/2256/17/FL 7no. flats and cycle parking. Cambridge Road, Great Shelford.
Demolition of existing dwelling and the erection of 7no. self-contained flats with associated amenity space, parking, and bike/bin storage.
129, Cambridge Road, Great Shelford, Cambridge, Cambridgeshire, CB22 5JJ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2256/17/FL
South Cambridgeshire
Application reference : S/2256/17/FL
Parking space provided for 7 cycles should be inadequate for 7 flats including some of 2 bedrooms (However this may be acceptable according to South Cambs policy). Based on the drawings in the Design and Access statemetn some of the sheffield stands may be inaccessible.
-
17/1008/FUL Darwin Green resubmission
17/1008/FUL | Resubmitted application (previously approved under application reference 14/0063/FUL) for the construction of vehicular road link across the north-west green corridor of consented development 07/0003/OUT to provide access to the proposed secondary school parcel of land within South Cambridgeshire District Council. (Resubmitted due to the expiration of three years from the date of the previous permission). | Land Adjoining Whitehouse Lane, Part Of The Darwin Green One Land Between Huntingdon Road And Histon Road Cambridge
-
Fulbourn Greenway
Fulbourn will be one of the first Greenways to undergo consultation.
-
Waterbeach Greenway
Waterbeach Greenway will be one of the first to undergo consultation.
-
New 'Greater Cambridge Planning Service' being set up
Not sure if this is the right place for this, but couldn't find anything sensible to tack it onto. I got a press release via the City Council email alerts, and, since we look at and comment upon planning applications, it is relevant to us. Not sure if it will make things better or worse. It may be helpful to have unified cycle parking standards for both South Cambs and the City for example, if that is the way things are going. Anyway, link and copied and pasted press release below. But could it make things less accountable? My impression is that we tend to get listened-to more by the City than by South Cambs, but that's only an impression. I guess it depends on what officers are appointed to the joint service, where it is based, etc etc.
https://www.cambridge.gov.uk/news/2017/06/21/new-greater-cambridge-planning-service-being-set-up
New 'Greater Cambridge Planning Service' being set up
News release from 21 June 2017, 3:26pm
A NEW integrated planning service for the Greater Cambridge area, transformed to provide an improved service for customers along with greater capacity and resilience, is set to move a step closer.
A business case for the new service, to be considered by councillors of both councils involved – Cambridge City Council and South Cambridgeshire District Council – early next month, sets out how the transition to a service covering the two council areas would be introduced over the next two years.
As set out in the business case, the proposed new Greater Cambridge planning service would offer clear benefits, including:
Capacity to meet the growing need for strategic planning and development across the area at a time of rapid growth here; with work on a single joint future plan for the two councils due to pick up pace when work on the current two joined-up Local Plans is close to a conclusion;
Providing a service of regional or national significance which would be more capable of attracting, developing and retaining a larger team of talented staff;
Offering an increased capacity and a more flexible approach to deliver a quality services for local residents and businesses and respond rapidly to the frequent changes to national planning policy.The shared service will also be looking to update computer systems to help local people have their say on applications and support council officers and councillors with good access to planning proposals by making use of new technology.
Work towards creating a new ‘Greater Cambridge Planning Service’ started in 2015. The two councils agreed then to work towards a new shared planning service that would deliver more capacity, support high quality development and provide better customer service at a time of increased development activity in the region.
Developments have included the appointment of Stephen Kelly as Joint Director of Planning and Economic Development and a project board to develop these proposals and wider joint initiatives by the two councils on planning and transport, working closely with the City Deal and in the future with the new countywide Combined Authority.
The plans councillors will now debate have been developed alongside managers in the planning teams to make sure they take on board the views of the people doing the job.
The first full phase of the transition to the new service would see a new senior management team appointed and staff transferred from Cambridge City Council to South Cambridgeshire District Council, who would be the employer authority. In total the two councils currently employ just over 150 planners, making it one of the bigger non-urban planning teams in the UK. The procurement of a new common ICT system would also start to be investigated
The second phase will consist of detailed work to design and implement the wider staff structure and assess the impact on other council services.
The new Greater Cambridge Planning Service is expected to be fully operational by early 2019. It would continue to have offices in Cambridge and South Cambridgeshire to provide a planning service to both areas.
Cllr Peter Topping, Leader of South Cambridgeshire District Council, said: “This new planning service is more than just a merger of the two existing teams. Cambridge and South Cambridgeshire are experiencing growth on an unprecedented scale outside of London. We owe it to our residents, as well as the businesses who want to create jobs here, and to the house builders - of all sizes - that we create a planning service that is resilient, protects what we value about our heritage and our environment, demands excellence in design, and keeps pace with the ambition for prosperity in this part of the country.
“Without this capability, we cannot expect developers or government to listen to us, and we are determined that we will be listened to, on planning matters, on behalf of our communities."
Cllr Lewis Herbert, Leader of Cambridge City Council, said: “We are determined that the proposed Greater Cambridge Planning Service will be one of the most effective planning teams in the country, providing a reliable, more straightforward service for customers and the wider community at a time of major growth in the area that is no respecter of council boundaries.
“The business case sets out how clear is the joint commitment and depth of agreement on key issues between the two councils and the route to reach our goal of a transformed planning service for the whole area, which builds on the great work the two councils have been doing together in recent years such as on our Local Plans and future planning strategy.”
The business case for the Greater Cambridge Planning Service is being discussed at Cambridge City Council’s Strategy and Resources Scrutiny Committee on 3 July and at South Cambridgeshire District Council’s Scrutiny and Overview Committee on 6 July and Cabinet on 13 July.
-
Home Cycle Lockers
(I never quite understood the way this works, I just want to ask a question, there's no issue)
Does anyone have any experience of the various "Cycle Locker" type storage you can buy? I'm fed up with juggling cars and bikes, so I think it's time my bikes had a separate place to reside, and a secure locker or two would seem to fit the bill.
Something like these:
http://cycle-works.com/
I'm looking at commercial-strength stuff as I doubt anything less will be secure enough.I'm looking for anyone who's bought them or used them, or similar. Is there anything I need to know before I order?
thanks
-
17/0925/FUL: relocation of cycle parking spaces. Cambridge Retail Park
Erection of new management suite and A1 retail pod unit and relocation of cycle parking spaces.
Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire
Cambridge
Application reference : 17/0925/FUL
It looks like this will move cycle parking to a more convenient location in front of Boots.
-
17/0951/FUL: Two detached houses and five flats, Newmarket Road
Demolition of existing dwelling and erection of two detached houses and five flats.
585 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Cambridge
Application reference : 17/0951/FUL
-
17/0927/FUL Pub & nine units 2 x 1xbed & 7 x studio. 80 Campkin Road, CB4 2QA
New building comprising of a Public House at ground floor with nine residential units on the upper floors (two 1xbed units & seven studio units) along with car and cycle parking and associated landscaping following the demolition of the existing buildings.
The Jenny Wren 80 Campkin Road Cambridge Cambridgeshire CB4 2QA
Cambridge
Application reference : 17/0927/FUL
-
17/0924/FUL: Six 2-bed apartments. 80 Maids Causeway, (Former Zebra pub)
Demolition of existing building and erection of six 2-bedroom apartments.
80 Maids Causeway Cambridge Cambridgeshire CB5 8DD
Cambridge
Application reference : 17/0924/FUL
-
17/0957/FUL :12 residential units & cycle storage. 190-192 Mill Road, Cambridge
Reconfiguration and extensions, incorporating dormer windows, and alterations to roof of building to provide 12 residential units (net increase of 9 units) along with bin and cycle storage.
190-192 Mill Road And 2B Cockburn Street Cambridge Cambridgeshire CB1 3LP
Cambridge
Application reference : 17/0957/FUL
-
Cycle/Pedestrian Path between Great Wilbraham and Fulbourn
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
-
14/0922/COND12 - Cycle parking - Westminster College, Madingley Road
Condition 12 - Cycle parking
Westminster College Madingley Road Cambridge CB3 0AA
Cambridge
Application reference : 14/0922/COND12
-
17/0822/FUL: 3No 2bed flats and 1No 1 bed flat. Milton Road
Conversion of existing dwelling house to form 3No 2bed flats and 1No 1 bed flat following a two storey front and side extensions and part two storey part single storey rear extension
35 Milton Road Cambridge CB4 1XA
Cambridge
Application reference : 17/0822/FUL
-
inaccurate "no through road" signs, missing "except cycles/pedestrians"
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
-
Cycle crossing signal timings
Issue derived from June 2017 monthly meeting: this issue tracks information related to the timing of traffic signals that control cycle crossings (e.g. Maids Causeway / Fair St, East Road / Norfolk St, Queens Rd / Burrell's Walk, Gonville Place / Gresham Rd, all along Guided Busway, appearing on various countryside routes, etc).
We would like to gather the following information:
a) how are the signals programmed currently (and when they change, what have they been changed to?)
b) who is responsible for the programming of the cycle as well as the placement of cycle detectors (if any)?
c) when needed, what levers can be pushed to get signals changed to give more priority to people walking and cycling? -
S/1868/17/FL : 2 New Dwellings. School Lane, Swavesey
PROPOSED 2NO. DWELLINGS ON LAND TO THE REAR OF 11 SCHOOL LANE.
LAND TO THE REAR OF 11 SCHOOL LANE, SWAVESEY
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1868/17/FL
South Cambridgeshire
Application reference : S/1868/17/FL
No Cycle parking facilities mentioned or drawn in D&A or plans.
-
S/1824/17/FL S/2999/16/FL: 5 new dwellings. Desmonds Close, Hauxton
Residential development comprising 5 dwellings and associated garden land, road infrastructure, landscaping, and new access from Desmonds Close following demolition of existing agricultural buildings (revision to S/2999/16/FL).
Land to the West, Desmonds Close, Hauxton, Cambridgeshire
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1824/17/FL
South Cambridgeshire
Application reference : S/1824/17/FL
No indication of cycle parking in the new application (S/1824/17/FL). I am unsure if the documents in the original planning application apply (S/2999/16/FL). Have had a quick look at the original application. I can't read part one of the planning statement as it downloads as blank pages. Part 2 (pages 19 and 20) of the planning statement notes the policy requiring cycle parking but fails to respond with any explanation of how it will be provided.
Without further information we have to assume that no cycle parking has been included.
-
17/0761/FUL: 5 Flats. 4no 1bed, 1no studio. Fulbourn Road, Cambridge
Demolition of an existing dwelling and the development of a single new building containing 4no 1bed flats and 1no studio.
65 Fulbourn Road Cambridge CB1 9JL
Cambridge
Application reference : 17/0761/FUL
Design & Access Statement:
Vehicular & Cycle Parking and Access
The current dwelling includes a separate garage to the north of the site with space for 2no cars. However, it is believed that this is garage used only for garden storage etc. and that parking for the property is generally on street. The proposal retains this current arrangement but ‘formally’ converts the garage in to a bin and bike store with the addition of a pedestrian door to Headington Drive.
The proposal promotes the adoption of low carbon transport through its location close to several bus routes, cycle ways and local amenities, and reinforces this through the provision of 10no secure, covered cycle parking spaces.The ground floor plans show a shared bike and bin store with 5 sheffiled stands making 10 spaces. There are no measurements to show whether these will all fit in the garage but based on the picture it looks like it might be a bit of a squeeze.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Ring Fort Path
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
-
CB1 station area: cycle parking and access
Many issues here about cycle parking - not only the station itself but the CB1 area
-
Bike Harvest June 2012
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people -
Bus drivers and cyclists in harmony
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
-
Bike Parking Shortage at Hills Rd 6th Form College
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
-
Stall at Energise Cambridge
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
-
The History of Cycling in Cambridge
Talk by local historian about cycling in Cambridge
-
Green Dragon Bridge
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
-
18-19 Regent Terrace planning applications 11/1375/FUL & 11/1376/CAC
11 flats replacing existing building
-
Perne Road roundabout
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
-
Lack of joined up information on Council websites
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAgfirst item says "multi-story car park with cycle parking and pushchairs
for loan".However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link tohttp://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.enon the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?" -
Glebe Farm development
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
-
Bicycle Access to Crematorium
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
-
12/0585/CLUED Lawful use of car park, Rugby pitch off Sedley Taylor Rd
Planning application here. Access issues need checking.
-
General promotion of cycling in Cambridge
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
-
12/0968/FUL Installation of one bike stand
The installation of one stand in the boundary of M&S facing Market Hill Square.
-
DfT consultation - HGV speed limit rise to 50mph on single carriageways?
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
-
Travis Perkins Development
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
-
Greater Cambridge Partnership (City Deal)
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
-
Busway cycleway flooded
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
-
Regional Campaigning
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
-
Orchard Park audit
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
-
Histon Road (City Deal scheme, and Gilbert Rd to Victoria Rd)
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
-
AstraZeneca to move to Addenbrooke's site
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
-
signage on cycle-pedestrian path next to Trumpington allotments, Cambridge
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf