Lack of cycle parking options in council-owned flats
New thread to discuss the lack of cycle storage options for leaseholders.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread to discuss the lack of cycle storage options for leaseholders.
sound+fury // 1 thread
Martin Lucas-Smith // 1 thread
Railpen are consulting on changes to the Retail Park on Newmarket Road
Created by sarah // 1 thread
Anything to do with the DNA path - lighting, vegetation, obstructions
sound+fury // 1 thread
Creation of additional storey above existing single storey (middle) part of the site and redevelopment of rear part of the site comprising: demolition of existing building and structures and creation of five storey office building.
16 - 17 Sidney Street Cambridge Cambridgeshire CB2 3HG
Cambridge
Application reference : 24/01905/FUL
Created by cpax // 1 thread
On a recent ride up The Mere Way I noticed that the wooden pillar had been removed and that cars were being driven on the route .
Created by KW // 1 thread
Partial demolition, alterations and extensions to Clarendon House, new ramped vehicular access, delivery bay, cycle access and parking, etc etc
Quite a lot of cycle parking, and some reduced car parking, in the basement. Cycle and car movements cross with potential visibility issues.
sound+fury // 1 thread
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
Created by Martin Wheatley // 2 threads
Planning application not addressing cycling issues credibly.
Created by T9292 // 1 thread
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread to discuss proposals.
Created by C // 1 thread
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
Created by Josh Grantham // 1 thread
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
Created by Josh Grantham // 1 thread
Outline planning application for demolition of existing buildings and construction of a new business/science park (Use Class E(g)) and ancillary "hub" building (Use Class E(b)(d)(f)) and associated car parking and landscaping.
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
South Cambridgeshire
Application reference : 24/00166/OUT
Created by cpax // 1 thread
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
sound+fury // 1 thread
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
Created by KW // 1 thread
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
The new shared-use path here is lovely except they've installed corduroy paving, with the very narrow bumps, on the newest stretch, to indicate the cycling and pedestrian halves, instead of the usual fat textured paving. Last week in the bad weather it caught my wheel and I skidded on it, only just avoided coming off completely. I couldn't get a photo because it was after dark, but you know the paving I mean. It's not suitable for cycle paths under any circumstances and I don't know why they've used it here. The section they installed previously, along Gregory Park up to the back entrance of the P&R, has the correct paving.
sound+fury // 1 thread
No cycle parking shown in the plans
Created by Martin Wheatley // 1 thread
How exactly more secure cycle parking will work.
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Finlay KM // 1 thread
A new set of barriers has appeared on the hospital side of the usway bridge at Addenbrookes.
Creates the usual set of problems for cargo bikes and less confident bike users, with the added bonus of being on a steep hill that ices up regularly, and right next to a busway with a record of squishing people who fall onto it.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.