Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:

  • Cambridge Road, Bridge Road traffic lights

    Created by Joe Adam // 1 thread

    The traffic lights on the Cambridge Road, Bridge road t junction have just been redone.
    They have slightly widened part of the footpath/shared use cycle way. However they have put a new offside repeater light in. The pole for this goes in just where the path is narrowing again, and where people on bikes turning right from Cambridge Road are joining the path.

    Please sign in to vote.
  • 17/1101/FUL: Cycle parking. Kettle's Yard, Northampton Street Cambridge

    Created by Roxanne (CEO) // 1 thread

    Installation of new cycle parking provision, including reorientated path and steps, repositioned parking metre, waste bin, and installation of 16 sheffield hoops and 1 cargo bike stand.

    Land Adj. Northampton Street Green Northampton Street Cambridge

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OS0CKLDXL3800

    Cambridge

    Application reference : 17/1101/FUL

    Please sign in to vote.
  • S/2256/17/FL 7no. flats and cycle parking. Cambridge Road, Great Shelford.

    Created by Roxanne (CEO) // 1 thread

    Demolition of existing dwelling and the erection of 7no. self-contained flats with associated amenity space, parking, and bike/bin storage.

    129, Cambridge Road, Great Shelford, Cambridge, Cambridgeshire, CB22 5JJ

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2256/17/FL

    South Cambridgeshire

    Application reference : S/2256/17/FL

    Parking space provided for 7 cycles should be inadequate for 7 flats including some of 2 bedrooms (However this may be acceptable according to South Cambs policy). Based on the drawings in the Design and Access statemetn some of the sheffield stands may be inaccessible.

    Please sign in to vote.
  • 17/1008/FUL Darwin Green resubmission

    Created by Matthew // 1 thread

    17/1008/FUL | Resubmitted application (previously approved under application reference 14/0063/FUL) for the construction of vehicular road link across the north-west green corridor of consented development 07/0003/OUT to provide access to the proposed secondary school parcel of land within South Cambridgeshire District Council. (Resubmitted due to the expiration of three years from the date of the previous permission). | Land Adjoining Whitehouse Lane, Part Of The Darwin Green One Land Between Huntingdon Road And Histon Road Cambridge

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OR6PWVDXKPN00

    Please sign in to vote.
  • New 'Greater Cambridge Planning Service' being set up

    Not sure if this is the right place for this, but couldn't find anything sensible to tack it onto. I got a press release via the City Council email alerts, and, since we look at and comment upon planning applications, it is relevant to us. Not sure if it will make things better or worse. It may be helpful to have unified cycle parking standards for both South Cambs and the City for example, if that is the way things are going. Anyway, link and copied and pasted press release below. But could it make things less accountable? My impression is that we tend to get listened-to more by the City than by South Cambs, but that's only an impression. I guess it depends on what officers are appointed to the joint service, where it is based, etc etc.

    https://www.cambridge.gov.uk/news/2017/06/21/new-greater-cambridge-planning-service-being-set-up

    New 'Greater Cambridge Planning Service' being set up

    News release from 21 June 2017, 3:26pm

    A NEW integrated planning service for the Greater Cambridge area, transformed to provide an improved service for customers along with greater capacity and resilience, is set to move a step closer.

    A business case for the new service, to be considered by councillors of both councils involved – Cambridge City Council and South Cambridgeshire District Council – early next month, sets out how the transition to a service covering the two council areas would be introduced over the next two years.

    As set out in the business case, the proposed new Greater Cambridge planning service would offer clear benefits, including:

    Capacity to meet the growing need for strategic planning and development across the area at a time of rapid growth here; with work on a single joint future plan for the two councils due to pick up pace when work on the current two joined-up Local Plans is close to a conclusion;
    Providing a service of regional or national significance which would be more capable of attracting, developing and retaining a larger team of talented staff;
    Offering an increased capacity and a more flexible approach to deliver a quality services for local residents and businesses and respond rapidly to the frequent changes to national planning policy.

    The shared service will also be looking to update computer systems to help local people have their say on applications and support council officers and councillors with good access to planning proposals by making use of new technology.

    Work towards creating a new ‘Greater Cambridge Planning Service’ started in 2015. The two councils agreed then to work towards a new shared planning service that would deliver more capacity, support high quality development and provide better customer service at a time of increased development activity in the region.

    Developments have included the appointment of Stephen Kelly as Joint Director of Planning and Economic Development and a project board to develop these proposals and wider joint initiatives by the two councils on planning and transport, working closely with the City Deal and in the future with the new countywide Combined Authority.

    The plans councillors will now debate have been developed alongside managers in the planning teams to make sure they take on board the views of the people doing the job.

    The first full phase of the transition to the new service would see a new senior management team appointed and staff transferred from Cambridge City Council to South Cambridgeshire District Council, who would be the employer authority. In total the two councils currently employ just over 150 planners, making it one of the bigger non-urban planning teams in the UK. The procurement of a new common ICT system would also start to be investigated

    The second phase will consist of detailed work to design and implement the wider staff structure and assess the impact on other council services.

    The new Greater Cambridge Planning Service is expected to be fully operational by early 2019. It would continue to have offices in Cambridge and South Cambridgeshire to provide a planning service to both areas.

    Cllr Peter Topping, Leader of South Cambridgeshire District Council, said: “This new planning service is more than just a merger of the two existing teams. Cambridge and South Cambridgeshire are experiencing growth on an unprecedented scale outside of London. We owe it to our residents, as well as the businesses who want to create jobs here, and to the house builders - of all sizes - that we create a planning service that is resilient, protects what we value about our heritage and our environment, demands excellence in design, and keeps pace with the ambition for prosperity in this part of the country.

    “Without this capability, we cannot expect developers or government to listen to us, and we are determined that we will be listened to, on planning matters, on behalf of our communities."

    Cllr Lewis Herbert, Leader of Cambridge City Council, said: “We are determined that the proposed Greater Cambridge Planning Service will be one of the most effective planning teams in the country, providing a reliable, more straightforward service for customers and the wider community at a time of major growth in the area that is no respecter of council boundaries.

    “The business case sets out how clear is the joint commitment and depth of agreement on key issues between the two councils and the route to reach our goal of a transformed planning service for the whole area, which builds on the great work the two councils have been doing together in recent years such as on our Local Plans and future planning strategy.”

    The business case for the Greater Cambridge Planning Service is being discussed at Cambridge City Council’s Strategy and Resources Scrutiny Committee on 3 July and at South Cambridgeshire District Council’s Scrutiny and Overview Committee on 6 July and Cabinet on 13 July.

    Please sign in to vote.
  • Home Cycle Lockers

    Phil Wigglesworth // 1 thread

    (I never quite understood the way this works, I just want to ask a question, there's no issue)

    Does anyone have any experience of the various "Cycle Locker" type storage you can buy? I'm fed up with juggling cars and bikes, so I think it's time my bikes had a separate place to reside, and a secure locker or two would seem to fit the bill.

    Something like these:
    http://cycle-works.com/
    I'm looking at commercial-strength stuff as I doubt anything less will be secure enough.

    I'm looking for anyone who's bought them or used them, or similar. Is there anything I need to know before I order?

    thanks

    Please sign in to vote.
  • 17/0925/FUL: relocation of cycle parking spaces. Cambridge Retail Park

    Created by Roxanne (CEO) // 1 thread

    Erection of new management suite and A1 retail pod unit and relocation of cycle parking spaces.

    Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OQGMZFDXKDB00

    Cambridge

    Application reference : 17/0925/FUL

    It looks like this will move cycle parking to a more convenient location in front of Boots.

    Please sign in to vote.
  • 17/0927/FUL Pub & nine units 2 x 1xbed & 7 x studio. 80 Campkin Road, CB4 2QA

    Created by Roxanne (CEO) // 1 thread

    New building comprising of a Public House at ground floor with nine residential units on the upper floors (two 1xbed units & seven studio units) along with car and cycle parking and associated landscaping following the demolition of the existing buildings.

    The Jenny Wren 80 Campkin Road Cambridge Cambridgeshire CB4 2QA

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OQGPS7DXKDE00

    Cambridge

    Application reference : 17/0927/FUL

    Please sign in to vote.
  • 17/0957/FUL :12 residential units & cycle storage. 190-192 Mill Road, Cambridge

    Created by Roxanne (CEO) // 1 thread

    Reconfiguration and extensions, incorporating dormer windows, and alterations to roof of building to provide 12 residential units (net increase of 9 units) along with bin and cycle storage.

    190-192 Mill Road And 2B Cockburn Street Cambridge Cambridgeshire CB1 3LP

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OQRFVCDXKII00

    Cambridge

    Application reference : 17/0957/FUL

    Please sign in to vote.
  • Cycle/Pedestrian Path between Great Wilbraham and Fulbourn

    Created by SamGW // 1 thread

    The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.

    Please sign in to vote.
  • 17/0822/FUL: 3No 2bed flats and 1No 1 bed flat. Milton Road

    Created by Roxanne (CEO) // 1 thread

    Conversion of existing dwelling house to form 3No 2bed flats and 1No 1 bed flat following a two storey front and side extensions and part two storey part single storey rear extension

    35 Milton Road Cambridge CB4 1XA

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OPN0DPDXJZ800

    Cambridge

    Application reference : 17/0822/FUL

    Please sign in to vote.
  • inaccurate "no through road" signs, missing "except cycles/pedestrians"

    Created by Heather Coleman // 1 thread

    I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.

    Please sign in to vote.
  • Cycle crossing signal timings

    Created by Matthew // 1 thread

    Issue derived from June 2017 monthly meeting: this issue tracks information related to the timing of traffic signals that control cycle crossings (e.g. Maids Causeway / Fair St, East Road / Norfolk St, Queens Rd / Burrell's Walk, Gonville Place / Gresham Rd, all along Guided Busway, appearing on various countryside routes, etc).

    We would like to gather the following information:

    a) how are the signals programmed currently (and when they change, what have they been changed to?)
    b) who is responsible for the programming of the cycle as well as the placement of cycle detectors (if any)?
    c) when needed, what levers can be pushed to get signals changed to give more priority to people walking and cycling?

    Please sign in to vote.
  • S/1824/17/FL S/2999/16/FL: 5 new dwellings. Desmonds Close, Hauxton

    Created by Roxanne (CEO) // 1 thread

    Residential development comprising 5 dwellings and associated garden land, road infrastructure, landscaping, and new access from Desmonds Close following demolition of existing agricultural buildings (revision to S/2999/16/FL).

    Land to the West, Desmonds Close, Hauxton, Cambridgeshire

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1824/17/FL

    South Cambridgeshire

    Application reference : S/1824/17/FL

    No indication of cycle parking in the new application (S/1824/17/FL). I am unsure if the documents in the original planning application apply (S/2999/16/FL). Have had a quick look at the original application. I can't read part one of the planning statement as it downloads as blank pages. Part 2 (pages 19 and 20) of the planning statement notes the policy requiring cycle parking but fails to respond with any explanation of how it will be provided.

    Without further information we have to assume that no cycle parking has been included.

    Please sign in to vote.
  • 17/0761/FUL: 5 Flats. 4no 1bed, 1no studio. Fulbourn Road, Cambridge

    Created by Roxanne (CEO) // 1 thread

    Demolition of an existing dwelling and the development of a single new building containing 4no 1bed flats and 1no studio.

    65 Fulbourn Road Cambridge CB1 9JL

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OP43QVDXJQC00

    Cambridge

    Application reference : 17/0761/FUL

    Design & Access Statement:

    Vehicular & Cycle Parking and Access
    The current dwelling includes a separate garage to the north of the site with space for 2no cars. However, it is believed that this is garage used only for garden storage etc. and that parking for the property is generally on street. The proposal retains this current arrangement but ‘formally’ converts the garage in to a bin and bike store with the addition of a pedestrian door to Headington Drive.
    The proposal promotes the adoption of low carbon transport through its location close to several bus routes, cycle ways and local amenities, and reinforces this through the provision of 10no secure, covered cycle parking spaces.

    The ground floor plans show a shared bike and bin store with 5 sheffiled stands making 10 spaces. There are no measurements to show whether these will all fit in the garage but based on the picture it looks like it might be a bit of a squeeze.

    Please sign in to vote.
  • 17/0732/FUL: Two new dwellings. Romsey Terrace, Cambridge

    Created by Roxanne (CEO) // 1 thread

    Erection of two new dwellings with associated car parking, landscaping, and infrastructure.

    Land To The East Of 37 And To The Rear Of 27-37 Romsey Terrace Cambridge Cambridgeshire CB1 3NH

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OOROLFDXJKR00

    Cambridge

    Application reference : 17/0732/FUL

    Please sign in to vote.
  • Brookgate / Brooklands Ave / Hills Road junction

    Created by Matthew // 1 thread

    Two issues, really:

    (1) It has puzzled me for some time that there is no way to cycle from Brookgate onto Brooklands Avenue. The traffic signal only shows a left green arrow from Brookgate onto Hills Road, which serves the buses, but Brooklands is a major cycle route and would make sense to access it directly from the station (there is a long way around via Clarendon & the busway otherwise).

    As it happens, when the left green arrow is showing, I have never seen any other conflicting traffic movement (although presumably Hills Road left onto Brooklands Ave is green at this time? I haven't checked). So it seems like it would be very simple to fix this problem: just convert the green left arrow into a green ball & cut any conflicting movements.

    (2) Regardless of that change, there should also be an advanced-stop-line on Brookgate, which there currently is not, so that buses do not sneak up and left-hook people. Even when making a left turn from Brookgate you can be left-hooked by a left-turning bus if they are not careful. So the lack of ASL here is rather strange.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top