Yarrow Road
Yarrow Road is getting a cycle route, under the GCP 'quick wins' scheme,
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by wookey // 1 thread
Yarrow Road is getting a cycle route, under the GCP 'quick wins' scheme,
I'm thinking of convening a workshop or possibly simply an informal gathering (possibly at a pub or cafe) to discuss techniques and ideas for responding to planning applications. The timing is right, I think, with the approval of the new Local Plans for Cambridge and South Cambridgeshire.
All are welcome, whether you already participate or are just interested in getting involved.
I would like to gauge interest first and then we can pick a suitable time and place.
no cycle parking
...
Erection of a new three bedroom dwelling to the rear of 233 Milton Road with driveway access, amenity spaces and landscaping.
233 Milton Road Cambridge CB4 1XQ
Cambridge
Application reference : 18/1476/FUL
no cycle parking
...
Erection of a 1-bed, 2 storey dwelling to the rear of 25/25A Cockerell Road.
25 And 25A Cockerell Road Cambridge Cambridgeshire CB4 3RU
Cambridge
Application reference : 18/1500/FUL
Proposed site plan: it looks like they are extending an existing set of wheel-benders by adding more wheel-benders.
...
Extension to the building, extension to an external plant compound, new generator compound, extension to existing cycle parking and new bin enclosure.
436, Cambridge Science Park, Milton, Cambridge, Cambridgeshire, CB4 0QA
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3269/18/FL
South Cambridgeshire
Application reference : S/3269/18/FL
Cycle parking provision consists of a plan marked with 'Alcove used for bicycle storage (using a purpose made bike rack)'
...
Erection of an attached building containing 3 dwellings. Single storey rear extension following demolition of existing conservatory and rear box dormer with Juliet balcony to main dwelling. Retrospective subdivision of main dwelling into two flats.
38 Ramsden Square Cambridge CB4 2BL
Cambridge
Application reference : 18/1397/FUL
The applicant very strongly claims that there are 81 residential cycle parking spaces (including in a follow-up email to the case officer to correct some errors in the application) and 5 visitor spaces.
Revised Planning Statement: "Communal residents’ cycle store (81 spaces) in basement at both the Chesterton Road end of the site (59 spaces) and the Sandy Lane end of the site (22 spaces)"
I can only count 46 residential cycle parking spaces in the diagrams, split between 24 spaces in the Block A (front) basement and the Block B (rear) ground floor. ALL of the cycle parking spaces, including visitor, are of the non-compliant 'wheel bender' variety. The Block B does not even have an access aisle for the wheel benders.
The Block A basement cycle park is accessible through either the rear car lift or the regular building lift in the front. Both appear to be large enough, however I would want to see a planning condition to ensure that both lifts are always available for use by people with cycles (to prevent any officious 'health and safety' concerns from killing the access).
...
Proposed serviced apartments (sui generis) comprising 32 x studio and 14 x 1 bed units together with hard and soft landscaping, an external garden room, cycle and refuse stores, basement car parking spaces and visitor cycle parking
Former Hamilton Lodge Hotel 156 - 160 Chesterton Road And Land Rear Of 162 Chesterton Road Cambridge Cambridgeshire
Cambridge
Application reference : 18/1245/FUL
15 affordable dwelling units providing 26 bedrooms, with 26 cycle parking spaces, and 17 car parking spaces.
Block A cycle parking (2 areas) has some substandard dimensions:
* detached area (8 spaces) has a substandard door less than 90cm
* integral area (9 spaces) has door positioned badly such that the first cycle parking space may occlude over 30cm of the entry, and there is a 90cm pinch point along the aisle
There are also 3 detached houses with 'garden sheds' for cycle parking:
* access to the gardens is through substandard 90cm doors
* insufficient detail is shown about the sheds to determine their layout, except that they appear to be about 200cm by 250cm in width and length, which should be OK and details can be secured through condition, although the shed doors may also be 90cm, which is substandard.
...
Demolition of existing flats and erection of 12no affordable apartments and 3no affordable dwellings with associated access, car parking and landscaping.
9-10A Ventress Close Cambridge Cambridgeshire CB1 8QX
Cambridge
Application reference : 18/1470/FUL
Created by Anna Williams – Head of Campaigns & Engagement // 5 threads
The magazine cheanged to a quarterly publication from December 2018 and is published seasonally in Spring (March), Summer (June), Autumn (September) and Winter (December).
The aims of the magazine are to:
– Continue to provide an update to our members and supporters on Camcycle's recent work and campaigns
– Continue to cover all aspects of cycling from planning application to personal stories and build on this foundation to make sure we are giving a voice to people of all ages and backgrounds
– Continue to strike the balance between a professional-looking magazine with a grassroots feel
– Proactively set the agenda for decision-makers, clearly communicating our vision through in-depth features on aspects of our policy and manifesto
– Develop and showcase our work with local partners including businesses and organisations who support our charity's aims and/or provide examples of best practice in working for more, better and safer cycling in and around Cambridge
– Drive forward bold and successful campaigns for cycling, providing all who read the magazine with clear calls to action so that they can get involved and amplify our voice
– Provide rewarding and sustainable roles to volunteers; attracting new members to the team and recognising long-term contributors.
– Appeal to non-members of Camcycle and even non-cyclists; taking them on the journey from awareness to action. Join. Donate. Volunteer. Share our vision. Support our work and help create a vibrant and people-friendly city.
Created by David Green // 1 thread
I cycle commute to the Science Park every day, riding Northbound on new cycle path past Cambridge North station. Over the past few weeks I've noticed a mobile tea wagon set up on the grass beside the new cycle/foot path directly opposite the station. I have no idea whether this has been sanctioned by the station authorities, or is just a trader using his initiative.
I'm concerned that the position of this mobile wagon is making my commute less safe:
- location obscures the view for cyclists as they ride towards the station. Location is on a curve in the path and it obstructs the otherwise clear view in both directions for cyclists, obstructing the view of cycle traffic approaching from opposite direction.
- location restricts the path width, particularly when pedestrians are buying refreshment. There are a couple of 'bar stools' set up and the wagon itself encourages pedestrians to cross the a busy cycle path.
- the fold-up roof of the wagon protrudes out over the path. It is a thin flat roof hard to see even in daylight. (As mornings get darker it will be invisible.). Tall cyclists, or any cyclists standing up on the pedals, could easily collide with this roof. There is a danger of serious injury/decapitation.
Last week I stopped and politely mentioned these matters to the owner. I have asked him to instead set up in the wide lay-by 50 m further up the path but he has not moved yet.
The roadway has double yellow lines. I believe this means that Please note that yellow lines apply from the centre of the road to the edge of the highway. This means that you cannot park on the pavement or verge either.
Does the CCyC have any contacts at Cambridge North station who we can take this up with on safety grounds? If not, how can we get this waggon moved? It is only a matter of time that a Science Park cycle commuter has a serious accident here.
Created by Roxanne (CEO) // 1 thread
The City and South Cambridgeshire councils are working in collaboration to prepare an Area Action Plan (AAP) to govern the future redevelopment and regeneration of the Cambridge Northern Fringe area.
Outline planning permission for a new mixed use village comprising residential development of approximately 3,500 dwellings; mixed uses comprising employment, retail, hotel, leisure, residential institutions; education, community facilities, open space including parks, ecological areas and woodlands, landscaping; engineering for foul and sustainable urban drainage systems; footpaths, cycle ways, public transport infrastructure; highways including a principal eastern access from the roundabout on St Neots Road and western access with Broadway including first section of strategic public transport route; associated infrastructure, groundworks and demolition; with all matters reserved except for the principal highway junctions from the St Neots Road roundabout and onto Broadway with some matters reserved except for access. This application is subject to an Environmental impact assessment.
Bourn Airfield, St Neots Road, Bourn, Cambridge, CB23 2TQ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3440/18/OL
South Cambridgeshire
Application reference : S/3440/18/OL
Created by Liz Irvin // 9 threads
In a recent newsletter edition, CamCycle presented a vision for Mill Road with reduced through traffic, allowing more room for cycling, pedestrians, buses and 'people parking'. Now that this vision has been presented, we would like to organise two public consultation sessions to get the views of people who live, work and travel in the area. The plan is to hold one session of each side of the bridge so we cover Petersfield and Romsey.
The Petersfield event will be held at St Barnabas church on Tuesday, October 16 from 4-7pm (to capture the after school, after work crowd). The Romsey event will be held at St Philips church hopefully the following week, but I am yet to confirm a date.
It would be great to get some input into these events, as I am new to the area so getting some historical/planning background would help. And if anyone would like to help with organising them that would be great as well. We're planning on printing off big maps of Mill Road and having them spread out for people to draw and write on. We will also have stickers for people to add to points they agree with.
It would be great if we could have an online method of contributing as well, as I know sometimes turning up in person isn't possible. I think an interactive map that people can add comments to and then other people can 'like' would be a good way to do this. So if anyone has ideas about building something like this, that would be very useful.
Still has high low stands as applicant indicated in prior correspondence.
...
Demolition of 51-55 Elizabeth Way and construction of a new three storey block of flats comprising twelve apartments, associated amenity space and cycle parking provision (Resubmission of application 18/0532/FUL)
51-55 Elizabeth Way Cambridge Cambridgeshire CB4 1DB
Cambridge
Application reference : 18/1427/FUL
Created by David Green // 1 thread
There are places available on the 'Wheel Building 1' course in Cambridge on Sat 13/10/18. This is aimed at people with little or no experience of wheel building.
For information and to enrol, please visit:
http://www.cambridgewheelbuilding.co.uk/
David Green
3x 2BR semi-detached houses.
Cycle parking provided by 'sheds', unclear on detail, except that they appear to be 1.5m by 2.1m in dimension.
Access to plot 1 is open, access to plot 2 garden is via a 0.8cm gate, and access to plot 3 garden is via an 0.7m gate and 0.7m corridor of 8.5m length.
6 car parking spaces, which exceeds the limit.
The driveway narrows to 3.5m for a significant length, although they claim to have discussed this with Highways already.
3 houses on Drayton Close have their rear gardens abutting this site and apparently gain access to their rear gardens through it. There is proposed laneway access to maintain that, at 1m width. This may pose an issue for the people living in those 3 houses.
...
18/1414/FUL | Demolition of garages and erection of 3no. affordable dwellings, partial widening of access and associated works | Colville Road Garages Colville Road Cambridge CB1 9EH
REVISED EIXSITNG [sic] AND PROPOSED PLANS AND ELEVATIONS: 'New wall-mounted vertical bicycle stands to provide 6 no. bicycle'
...
Just a quick look over reveals some serious problems.
Planning Statement Section 2.3 - 'main' cycle/pedestrian route is somewhat indirect and appears to run within the blind-spot of several driveways.
Planning Statement Section 4.4 - a litany of how NOT to design cycle parking.
Layout - missing pedestrian crossings at several minor junctions - although there also appear to be some continuous footways at others, curiously enough.
...
Approval of reserved matters for appearance, landscaping, layout and scale following Outline planning permission S/0388/12/OL for the erection of 240 dwellings along with garages, roads, sewers and all ancillary, the outline application was subject to an Environmental Impact Assessment (EIA)
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3405/18/RM&theTabNo=3
S/3405/18/RM
sound+fury // 1 thread
Consultation regarding demolition and new residential building in its place.
Created by Roxanne (CEO) // 1 thread
Change of use from Office (B1(a)) to Student Accommodation (C2) with associated works.
Hillcross Bells School Red Cross Lane Cambridge Cambridgeshire CB2 0QU
Cambridge
Application reference : 18/1355/FUL
Space for 20 students to stay there buy only 'up to 11' cycle parking spaces provided.
Created by Roxanne (CEO) // 1 thread
18/1365/B1C3 | Prior Approval notification of proposed change of use from B1(a)(Office) to Class C3 (dwellinghouses) to create 6no. 1xbedroom units. | 23 Tenison Road Cambridge Cambridgeshire CB1 2DG
No cycle parking shown in drawings
Created by Roxanne (CEO) // 1 thread
Applicant has failed to provide adequate information about their cycle parking. I'm concerned this will be passed as there is *still* no cycling officer to review the application.
Condition 3 - Cycle Parking
73 Bridewell Road Cambridge Cambridgeshire CB1 9EN
Cambridge
Application reference : 14/0470/COND3
D&A mentions there is space for cycle parking but the site layout doesn't show it.
...
Application for outline planning permission for residential development of 2 no. 3 bed room houses with all matters reserved apart from appearance, landscaping, layout and scale.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3043/18/OL&theTabNo=3
The Erection of 2 No. 1-Bed flats and 1No. 2-bed two-storey semi-detached dwelling following the demolition of the existing dwelling
89 and 89A, Cambridge Road, Girton, Cambridge, CB3 0PN
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3220/18/FL
South Cambridgeshire
Application reference : S/3220/18/FL
no cycle parking
...
Proposed three bed dwelling
24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Cambridge
Application reference : 18/1319/FUL
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf