New cycle stands on Brookside
The Cambridgeshire County Council is going to reduce pay and display parking in this location by 10m to allow installation of a car-share space and three cycle parking stands.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The Cambridgeshire County Council is going to reduce pay and display parking in this location by 10m to allow installation of a car-share space and three cycle parking stands.
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
sound+fury // 1 thread
This is an application from Emmanuel College to develop land on Park Terrace. They propose student accommodation, a bar and lecture facilities.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Hybrid application - (i) Full application for the erection of a mixed use building including a children's nursery (Class D1) and offices (Class B1); (ii) Outline application (Matters of access, landscaping, layout and scale to be considered) for approximately 7500 sqm of office (Class B1) and ancillary space; (iii) Asociated works, including hard standing and landscaping
Cambridge Innovation Park North, Stirling House, Denny End Road, Waterbeach, CB25 9PB
South Cambridgeshire
Application reference : S/2784/19/OL
Created by William Kerslake // 1 thread
Drivers pull on to roundabout without slowing or looking. Accident on roundabout 28/1/2020 again.
19/1734/FUL | Erection of 35 dwellings involving the re-positioning of existing access onto Clerk Maxwell Road, provision of new spine road, parking, cycle provision, landscaping and associated infrastructure. | Clerk Maxwell Road Cambridge Cambridgeshire
Created by Eleanor Blair // 1 thread
Bus gate at Clay Farm Centre is marked with a "no entry except buses" sign - this route it used by many bikes, and should probably be changed. I'd rather not go through no-entry signs, but I do at the moment as it's the only sensible route by bike from Trumpington Park Primary to Lime Avenue.
sound+fury // 1 thread
A bill is being put forward to sentence any cyclist convicted of dangerous cycling to a 14 year prison term.
Rebuild existing convenience store (including part demolition, external works, and refurbishment) - Use Class A1 (Shop), and the provision of 8no. one bed residential apartments above to create a two storey development, reconfiguration of the existing car park, cycle parking provision, landscaping and associated infrastructure works.
1 Rectory Terrace High Street Cherry Hinton Cambridge CB1 9HU
Cambridge
Application reference : 19/1375/FUL
Created by Sarah Hughes // 1 thread
I'm concerned that the current entryway design and policy on entering the school grounds at Milton Road Primary School is dangerous for people cycling (many of whom are children). I would like to suggest an improved entryway design and policy on entering the school grounds to the school for their consideration. Is there anyone with experience in this area who could advise? Or anyone who'd like to join me in making the submission?
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Bene't street will be closed for four weeks (until early/mid Feb 2020) so that Anglian Water can work to repair a collapsed sewer in Cambridge. A diversion for cars will in place. The footpath is open to people walking and pushing their cycles. The diversion for the cars means that Corn Exchange street is two-way for cars and this has implications for people cycling on the contraflow lanes.
Created by Finlay KM // 1 thread
A new set of barriers has appeared on the hospital side of the usway bridge at Addenbrookes.
Creates the usual set of problems for cargo bikes and less confident bike users, with the added bonus of being on a steep hill that ices up regularly, and right next to a busway with a record of squishing people who fall onto it.
Proposed Safety and Access restrictions in Eddington
Various Locations Eddington Cambridge CB3 1SE
Cambridge
Application reference : 19/1536/FUL
Discharge of condition 2 (brick details), 4(roof details), 23(lighting), 36(fire hydrants) and 41(cycle parking) pursuant to planning permission S/2372/17/FL
2 Cambridge Square,Cambridge
South Cambridgeshire
Application reference : S/4212/19/DC
Erection of new private rented residential block comprising a total of eighty studio, one and two bedroom apartments (Resubmission of application S/0768/18/FL)
Western side of Land Parcel COM4, Neal Drive, Orchard Park, Cambridge
South Cambridgeshire
Application reference : S/4191/19/FL
Created by Cllr Ian Manning // 1 thread
I'm investigating multiple reports of accidents with experienced cyclists suddenly slipping off their bikes and would appreciate knowing about anyone this has happened to recently. The common characteristics are:
Experienced cyclists.
No frost/ice on road.
Sudden loss of control of bike, wheels slipping out.
Visible residue on the road.
Injury serious enough to go to A&E.
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2876/16/OL for a residential development comprising 154 dwellings including access.
Land North East Of Rampton Road, Cottenham, Cambs
South Cambridgeshire
Application reference : S/4207/19/RM
Created by wookey // 1 thread
One of the Greenway radial routes is Linton, Abingtons, Babraham, Babraham P&R, Addenbrookes.
It is being consulted-on in sections:
* Addies <-> Babraham P&R,
* Babraham P&R <-> Babraham research roundabout
* Babraham research roundabout <-> Linton
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Demolition of single storey dwelling and erection of part 2/ part 3 storey building containing 2 no. 1 bed flats and 3 no. 2 bed flats
138 Brooks Road Cambridge CB1 3HR
Cambridge
Application reference : 19/1505/FUL
Demolition of 32no existing flats and garages, and erection of 75no new affordable dwellings, including 4no houses and 71no apartments, a new community facility, car parking, landscaping and associated works.
67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP
Cambridge
Application reference : 19/1616/FUL
sound+fury // 1 thread
Proposed football stadium move.
Created by David Green // 1 thread
I will be running four Wheel Building Workshops in Cambridge during 2020 (dates on website). It makes a great Christmas present for anyone who is a keen cyclist, or interested in cycle maintenance and repair.
Potential redesign of junction looks very poor - The usual set of issues with cars cutting across bikes, no real segregation, lanes starting/stopping etc. etc. etc.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 18 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)