Solar Stud Lighting for Coe Fen
The City Council are proposing adding "solar stud" lighting on this route.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
Created by Al Storer // 1 thread
The City Council are proposing adding "solar stud" lighting on this route.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by Matthew // 1 thread
We're forming a West/Northwest Cambridge site-specific group to organise around issues of walking, cycling and public transport:
Created by Roxanne (CEO) // 1 thread
The CIty COuncil have received an application for the designation of a neighbourhood area and a neighbourhood forum, in accordance with the Neighbouring Planning (General) Regulations 2012 (as amended).
The area is named as South Newnham (Cambridge City) and the forum is named as South Newnham (Cambridge City) Area Forum.
In accordance with the Neighbourhood Planning (General) Regulations 2012, the Council are inviting comments on the proposed designations through a six-week public consultation until 5pm on Monday 6 March 2017 More info:
Created by Monica Frisch // 0 threads
There are quote a lot of bollards of different types on cycle routes in Cambridge. Many may be unnecessary, some could be improved, for example by being made more visible. This is a proposal to develop a position paper on the need for bollards on cycle routes and which types are most suitable.
Created by Heather Coleman // 1 thread
Perhaps this will be less of an issue when the Chisholm Trail is built? But I'm sure there are plenty of cycle users of this road for whom the Chisholm Trail will not be an appropriate alternative route, mostly people going shorter distances than I'm going or needing to do short stretches of it and not heading for Addenbrooke's.
Owing to various pathworks on Stourbridge and Midsummer Commons, I've been taking a different route from Milton to Addenbrooke's, going through Romsey and down Coleridge Road the last couple of weeks. It's horrible. Parked cars in random places make it fairly unpleasant as you have to weave in and out with cars which aren't exactly adhering to the 20mph speed limit going past you.
I know this is a pipe dream, but wouldn't it be nice if Coleridge Road was given the Gilbert Road treatment.
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by Roxanne (CEO) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Created by Roxanne (CEO) // 1 thread
The Great Northern Road and Tenison Road junction is on a key route for access to the station and had high traffic volumes. It has been poorly designed for pedestrians, cyclists and drivers. Within only month of the route opening ta pedestrian has been injured here.
Created by Anna Langley // 1 thread
It seems that the new cycle lane in Water Street, is just too tempting to be ignored for motorists looking for a place to park. The councils enforcement people won't do anything, and nor, I expect, will the police.
We need bollards along there to physically prevent this from happening.
Created by Roxanne (CEO) // 7 threads
2017 will be the year that we launch our corporate sponsorship programme and also look at other projects through which we can collaborate with, influence and raise funds from local businesses. This is a catch-all issue for the various initiatives.
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by David Earl // 1 thread
At the Camcycle AGM 2016, Robin suggested we should try to get cycleways named as a means of recognising them officially, getting them on emergency service databases etc. I'm creating this issue to take this forward.
Created by Simon Nuttall // 4 threads
Motion for Camcycle AGM 2016: Street Cycle Parking
Providing secure places to park bicycles is a simple and effective way to encourage cycling by making people on bikes feel welcome. In some areas of Cambridge residents have got used to all the spare street space being allocated to the storage of motor vehicles and very little for bikes. The result has been badly parked bikes cluttering hallways, clinging to drainpipes and other street furniture. The experience on Thoday Street where some on-carriageway racks have been installed is a good example of how the problem can be addressed.
Camcycle resolves to:
1. Champion the replacement of on street car parking with cycle parking where it is clearly needed
2. Identify streets where this should and can be achieved
3. Work with local councillors to survey demand
4. Where there is sufficient local support work with local councillors to prepare proposals for funding. For example, from the Local Highways Improvement fund.
This motion was passed by 46 to one.
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Martin Lucas-Smith // 1 thread
The Blue Moon, which I see is proposed to be renamed as 'The Moonshine Still' has no cycle parking nearby, which is a long-running problem.
It is proposed to make some alterations to the building to move the entrance, as per the planning application below.
We should put in an objection that the opportunity to add cycle parking is not being taken.
New main entrance to pub from Norfolk Street. Existing entrance to be bricked up. New bollards on paved area to demarcate area for external tables and chairs.
The Blue Moon 2 Norfolk Street Cambridge CB1 2LF
Cambridge
Application reference : 16/2055/FUL
Created by Roxanne (CEO) // 1 thread
I was unable to find this issue in Cyclescape. While the deadline has passed I am posting here for our records as there are certainly implications for cycling. Hopefully, these were previously dealt with in other threads.
Planning Application 12/1608/FUL
Demolition of existing buildings (City Roomz Hotel and former railway offices) and construction of a new office building comprising:14,326 sq.m office floorspace (Class B1a) and 1,205 sq.m of retail/cafe and restaurant floor space (Class A1/A3/A4/A5), including ancillary accommodation / facilities with a single level basement (4,020 sq.m) to accommodate 92 car parking spaces, associated plant and 568 cycle parking spaces; roof level plant and hard and soft landscaping, including the final phase of the Station Road Open Space.
I was knocked off by a taxi who ignored the priority southbound traffic signs.
Does anyone know how I can :
A, review any CCTV footage from then
and
B, take that to the Council taxi licence people?
Thanks
Richard
Created by Jim Chisholm // 1 thread
The traffic lights in Gt Shelford (Freestones Corner) are being replaced.
They've already done the DDA compliant paving and the cabling for the new lights is I believe done.
There may be an opportunity for ASBs and approach lanes on at least one of the A1301 approaches. Often motor vehicles turn left across those on cycles with only some 50% of left turning traffic correctly indicating
Created by Roxanne (CEO) // 1 thread
Demolition of an existing sports pavilion, erection of a new sports pavilion, alterations to an existing car park and a vehicular access, a cycle shelter, new flood-lit artificial surfaced sports pitches and associated soft and hard landscaping.
St Marys School Playing Field Long Road Cambridge CB2 8PX
From the Design & Access Statement:
9.4 Cycle Parking
The Cambridge City County Local Plan 2006 Appendix D obligates schools to provide 50% of cycle spaces for children aged 5 to 12 and 75% for children over 12 years old. Under the same Local Plan, the college is obligated to provide cycle spaces for all students plus 1 for every 2 members of the staff.
The proposed pavilion will provide a changing space for maximum 4 teams of 20 players plus 2 staff each, therefore we declare to provide cycle stands for a minimum of 84 bikes.
Current site layout allows for 62 cycle spaces under roof canopy and 64 uncovered stands, therefore exceeds the minimum requirement defined in the Local Plan.
Created by Roxanne (CEO) // 1 thread
Erection of dwelling following demolition of existing triple garage block. New vehicular access from highway to serve existing dwelling.
4 Cavendish Avenue Cambridge Cambridgeshire CB1 7US
House includes a combined bin and cycle store for three cycles. The space indicated on the drawing does not appear big enough for both bins and cycles. I question whether providing for three cycles is enough considering there is room for at least two cars.
Created by Roxanne (CEO) // 1 thread
Redevelopment of St John's Innovation Centre.
Not sure how this application was missed. But we should be aware of what is going on here. There are a few conditions pending consideration which may provide an opening to make comment if we determine the need.
There is a lot of sheltered cycle parking of both two-tier and Sheffield stand variety in several locations around the site.
Created by Monica Frisch // 8 threads
Cycle routes and cycle paths need maintenance. This issue is somewhere to raise matters relating to standards of path maintenance, problems of poor maintenance, and examples of good maintenance.
Created by Roxanne (CEO) // 1 thread
Erection of extensions to Norfolk Building for common room, 16 student rooms, college offices and research space, cafe and kitchens; erection of 6 family accommodation units; landscaping and cycle parking following demolition of maisonettes.
St Edmunds College Mount Pleasant Cambridge CB3 0BN
"The College currently has 304 cycle parking spaces that includes 146 Sheffield hoops providing 292 spaces and 12 single V stands. The current proposal is to add a further 22 Sheffield hoops under a cycle shelter providing a total of 348 cycle spaces."
Created by Roxanne (CEO) // 1 thread
The proposal comprises the conversion of the existing end terrace known as No.48 New Square and will comprise of 3No. self-contained flats, the demolition of the existing garage and the erection of 1No. self-contained studio-flat and the removal of 4No. Parking bays accessed via Willow Walk and the erection of 1No. self-contained flat. All with associated landscaping and access arrangements.
48 New Square Cambridge Cambridgeshire CB1 1EZ
" Cycle Parking
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking in Residential Developments (2010). The new flats are to be provided with a communal covered and secure cycle store within the building fronting Willow Walk. Access will be solely via New Square through the communal garden.
The store will be fitted with steel Sheffield cycle stands spaced in accordance with Diagram 3 of the above guide. Access gates are to be a minimum of 1m in width where required, and fitted with mortise locks."
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)