Bridge Street
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cambridge Cycling Campaign:
sound+fury // 0 threads
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
sound+fury // 0 threads
Traffic signals hold up not just vehicles but bike riders too. This should change with consideration given to walkers as well.
sound+fury // 0 threads
Several bikes fly parked in this area, showing that bike racks would be welcome. (Reported originally on Twitter by Alex Raha (@Rahario)
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by Roxanne (CEO) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works The outline was screened and confirmed not too be EIA development
Land east of Teversham Road, Fulbourn, Cambs
South Cambridgeshire
Application reference : S/3290/19/RM
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by David Earl // 1 thread
The cycleway has a sever problem with tree-root damage. The largest fault is a sharp triangular profile about 10cm high. This has been reported to CambsCC six times according to their fault reporting, starting two years ago, including one person who came off their bike beacause of it. I reported it in September 2018. Nothing whatsoever has been done about it.
I wrote to my county councillor (John Williams, in whose division this also lies) about the failure to act in January. He did not reply. I have written again today.
Yesterday, I was thrown off my bike by my pedal catching the largest upstand. Fortunately the only damage was a sore knee for a few hours.
I have now made a formal complaint of negligence to the Counmty Council. They have had two years and a report of injury, but have failed to act.
Created by David Earl // 1 thread
The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.
There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.
Martin Lucas-Smith // 1 thread
This is a hostile roundabout. It has been fiddled around with over the years, to add advisory cycle lanes, lights, pedestrian crossings, etc.
The area needs a fundamental redesign, to replace the roundabout probably with a protected intersection design.
It is outrageous that a health site such as Addenbrooke's has such an unsafe and anti-cycling junction as its main entrance.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Martin Lucas-Smith // 0 threads
Now that the residents' parking scheme is in place, it is clear that there are many more spaces provided than are actually in use.
The amount of space should be slimmed down ASAP.
In particular, the area round the exit from the cut-through from Clifton Road desperately needs to have the parking removed year, to make the visibility much better. A couple of vehicles park there, yet they could easily park 20m away in one of the now empty bays.
Station Road has a bit of cycle lane provision, but it is spotty.
There should be cycle lanes on both sides of the road, the full length.
Taxis should have to queue in the station area car park itself, not 250m away on Station Road.
The streetscape along Riverside was upgraded several years ago at the town end. But it then stops.
It should be completed, all the way to Stourbridge Common.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 0 threads
Maid's Causeway and the town side of Newmarket Road (until the roundabout) is a mish-mash of a few bits of cycle lane. This is a wide road.
This should be changed to proper cycle tracks. This can be done without moving pavements.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 0 threads
Gonville Place at the Mill Road end needs queue-busting cycle lanes, as per East Road.
As the image shows, there is plenty of space here.
The Hills Road end goes to three lanes so that would be more difficult. The Mill Road end is much easier and can be regarded as a simple 'quick win'.
Martin Lucas-Smith // 0 threads
Like many areas of Petersfield, Ainsworth Street has no cycle parking but there are bikes left along the pavements.
Cycle parking should be provided.
Every night, and during the day, there are always at least some spots of car parking unused. Therefore there is scope to remove a few spaces and install residential cycle parking, as per Thoday Street.
Martin Lucas-Smith // 0 threads
Kingston Street has a major problem with pavement parking.
Bizarrely the yellow line restriction on the east side (nearest the railway) allows parking on that side of the road during certain times, but that is not possible to do without either blocking the road or parking on the pavement.
Current restrictions are Monday-Saturday, 8.30am-5.30pm. This should be double yellow lines (24 hours). That would still permit deliveries.
Created by piers // 1 thread
This very short cycle lane is the quickest way to turn right into Brooklands Avenue. You can join it at the start (Latham Road), and depending on the traffic flow, continue in the left lane until you can get into the advance stop box turning right, or change into the right lane earlier.
However, every couple of mornings, cars (or lorries) sit in the cycle lane blocking it. It seems to be if one car is in it, most are. If no cars are in it, none are.
Martin Lucas-Smith // 1 thread
Erection of 6 flats on a scrap of unused land behind The Seven Stars Public House Newmarket Road
The Seven Stars Public House 249 Newmarket Road Cambridge Cambridgeshire CB5 8JE
Cambridge
Application reference : 20/0053/OUT
Martin Lucas-Smith // 1 thread
Planning application to change the former Cambridge Building Society building to a pub.
This is right on the corner with Downing Street. There is significant potential for delivery issues to cause difficulties if not conditioned.
sound+fury // 2 threads
The City Council are consulting on how to regenerate East Barnwell.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
18/1890/FUL
Erection of nine residential units comprising a terrace of 4 x three bedroom houses, 4 x two bedroom flats and 1 x one bedroom flat with access, car parking, and associated landscaping, following the demolition of the existing building on site, at Malta Road.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
City Council considering the addition of suitable 'hoops' to facilitate parking of cycles against bollards, sign posts, lighting columns and the like at various locations across the ward.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf